Tender For Landscape Plantation Works PDF
Tender For Landscape Plantation Works PDF
YEAR 2010-2011
Project Owner:
TABLE OF CONTENT
Page 1 of 60
Landscaping Plantation Works in Mahindra World City, Jaipur
SECTION-1
TENDER NOTIFICATION
Page 2 of 60
Landscaping Plantation Works in Mahindra World City, Jaipur
Selected item rate tenders in the prescribed form are invited from experienced Contractors, for the following
work:
http://www.mahindraworldcity.com/content.aspx?act=tenders&citi=jai
pur
7. PRE-BID All the tenderer shall be open to have discussion on clarification as
MEETING required on any terms and conditions of the contract BEFORE signing of
the Tender document.
Page 3 of 60
Landscaping Plantation Works in Mahindra World City, Jaipur
9. VALIDITY OF a) The rates quoted by the contractor should hold good for at least (6)
TENDER months from the date of submission of tender.
b) Tender if accepted should hold good till the completion of the work.
10. TENDER COVER a) The tenders shall be submitted completed in all respect sealed with
cover labeled on top as TENDER FOR LANDSCAPING
PLANTATION WORKS IN MAHINDRA WORLD CITY
(JAIPUR) LIMITED, This cover shall also include the demand draft
towards the Earnest Money Deposit (if Applicable)
Page 4 of 60
Landscaping Plantation Works in Mahindra World City, Jaipur
13. OBLIGATORY a) All tenderer shall include a statement giving the following particulars:
REQUIREMENTS i) Major items of Equipments, Tools and machinery proposed for
use in carrying out the Contract;
ii) The qualifications and experience of key personnel proposed for
administration and execution of the Contract, both on and off
site;
b) In addition, the tenderer shall furnish the following information
regarding the financial standing of the tenderer:
i) Level of working capital;
ii) Extent of access to bank loans or credit facilities, with ceiling
limits, if any, prescribed in this regard and certified by the
bankers themselves;
c) Details of current work in progress including value, current
outstanding payables etc.
d) Shall submit the copy of this document signed on each page along
Page 5 of 60
Landscaping Plantation Works in Mahindra World City, Jaipur
14. OPENING OF a) The tenders will be opened at the project office of MAHINDRA
TENDERS WORLD CITY (JAIPUR) LTD
b) The tender shall remain open for the acceptance by the competent
authority for a period of three months from the date of opening of the
financial bid.
c) Tenders once submitted cannot be withdrawn.
Page 6 of 60
Landscaping Plantation Works in Mahindra World City, Jaipur
2. CONDITIONS TO TENDERERS
1. SITE VISIT a) The tenderer shall, prior to submitting his tender for the work, visit
and examine the site of works and its surroundings at his own
expense, and obtain and ascertain for himself on his own
responsibility all information that may be necessary for preparing
his tender and entering into a contract, and take the same into
account in the quoted contract price for the work.
b) The tenderer shall satisfy themselves about the following factors:
i) Site conditions including access to the site, existing and
required roads and other means of transport/communication for
use by him in connection with the work including diverting and
re-routing of services.
ii) Requirement and availability of land and other facilities of his
enabling works, establishment of his nursery, office, stores etc.
iii) Ground conditions including those bearing upon transportation,
disposal, handling and storage of materials required for the
work or obtained there-from.
iv) Source and extent of availability of suitable materials,
including water etc., and labor (skilled and unskilled) required
for work, and laws and regulations governing their use and
employment.
v) Geological, meteorological, topographical and other general
features of the site and its surroundings as are pertaining to and
needed for the performance of the work.
vi) The limit and extent of surface and subsurface water to be
encountered during the performance of the work, and the
requirement of drainage and pumping.
vii) The type of equipment and facilities needed, for and in the
performance of the work;
viii) The extent of lead and lift required for the work in complete
form over the entire duration of the contract, and
ix) All other information pertaining to and needed for the work
including information as to the risks, contingencies and other
circumstances which may influence or affect the work or the
cost thereof under this contract.
c) The tenderer should note that information, if any, in regard to the
local conditions, as contained in these tender documents, has been
given to tenderer merely for guidance and is not warranted to be
complete.
d) A tenderer shall be deemed to have full knowledge of the site,
whether he inspects it or not, and no extra charges consequent on
any misunderstanding or otherwise shall be allowed.
e) The tenderer and any of his personnel or agents will be granted
permission by the Site-In-Charge or his authorized nominee, on
receipt of formal application in respect thereof a week in advance of
the proposed date of inspection of site, to enter upon his premises
and lands for purpose of such inspection, but only on the express
condition that the tenderer (and his personnel and agents) will
relieve and indemnify the Employer (and his personnel and agents)
from and against all liability in respect thereof and will be
responsible for personal injury (whether fatal or otherwise), loss of
or damage to property and any other loss, damage, costs and
expenses however caused which, but for the exercise of such
permission, would not have arisen.
Page 7 of 60
Landscaping Plantation Works in Mahindra World City, Jaipur
2. TIME LIMIT a) Time is of the essence in this Contract, and the work covered herein
is required to be completed in all respects within the time period
stipulated above.
b) The tender should be based on this time of completion. However, the
above-mentioned stress on time-based completion shall not entitle the
successful tenderer to claim price escalation for the portion of work,
if any, which remains unexecuted after the stipulated completion
period.
3. TENDERED The Contractor must understand clearly that the rates quoted are for
RATES complete work and include all cost of materials (plants and other basic
requirements like staking, safety requirement of the planting materials,
signages (planting nomenclature), costs due to labor, tools & tackles,
supervision, services of all types like use of electricity, watering, transport
of water for planting materials, works, power royalties etc., including
their procurement, transportation, storage and wastage etc., to cover the
cost of night working, when and if required. No claim for additional
payments beyond the prices or rates quoted will be entertained. The
Contractor shall further provide without extra charges all labor and things
required by Landscape Architect/site In-Charge for testing (soil & water
on continual basis) and measuring the work and for weighing, measuring,
providing or testing the appropriateness of any portion of the work, and
shall also at his own cost provide access to every part of the work with
safety.
a) The contract shall be for the total cost as quoted in the schedule of
quantities, attached by the successful tenderer, complying with the
terms and conditions of tender document and shall be for the whole
work as prescribed in scope of work.
b) All duties, taxes, fees and other levies (present and future) payable by
the Contractor under the Contract or for any other cause, as on the
date thirty days prior to the closing date for submission of tenders,
shall be included in the total contract price submitted to the
Employer.
c) The rates must be inclusive of ESI, PF or any other statutory
compliance as applicable and all taxes inclusive of Entry Tax, Sales
Tax, Turn over Tax, Works Contract Tax wherever applicable. The
Employer will not reimburse any of the above-mentioned items.
d) The rates in the tender should be quoted both in figures and in words;
and these are to be written in ink only and are not to be typed; and all
corrections should be dated and attested by the Contractor with full
signature.
e) If there is any difference between the rates quoted in words and those
in figures, the lower rate shall be taken into consideration.
f) It should be clearly understood that the quantities shown in the Bill of
Quantities are approximate, and the drawings are tentative and liable
to modifications or alterations as may be found necessary.
g) The Contractor shall be deemed to have satisfied himself before
tendering as to the correctness and sufficiency of his tender for the
works, and the prices stated in the schedule of quantities and/or the
schedule of rates and prices, which rates and prices shall cover all his
obligations under the Contract, and all matters and things necessary
for the proper completion of the works.
Page 8 of 60
Landscaping Plantation Works in Mahindra World City, Jaipur
4. VARIATIONS OR a) The tenderer shall submit an offer which complies fully with the
DEVIATIONS IN basic requirements of the tender documents as indicated in drawings
TENDER and specifications.
DOCUMENTS b) All tenderer are cautioned that no conditional offer, variations or
deviations by the tenderer, with respect to any items proposed by the
tenderer (including advance loan for mobilization or time for
completion etc.), shall be entertained or considered.
c) Furthermore, any deviation from Contract conditions, particular
specification, or other requirements stipulated in these tender
documents other than those especially clarified/amended shall be
liable to be rejected as non-responsive.
Page 9 of 60
Landscaping Plantation Works in Mahindra World City, Jaipur
Page 10 of 60
Landscaping Plantation Works in Mahindra World City, Jaipur
SECTION-2
FORMS FOR TENDERER
Page 11 of 60
Landscaping Plantation Works in Mahindra World City, Jaipur
WHEREAS the Employer is desirous of Landscape works, and has caused Drawings and Specifications etc. describing
the work to be prepared by M/s. Site Concepts Pvt. Ltd., Landscape Architects,
And
WHEREAS the said drawings numbered ______________________________ and/or the Bill of Quantities have been
signed by or on behalf of the parties hereto, And
WHEREAS the Contractor has agreed to execute upon and subject to the conditions set forth herein (herein referred to
as the said Conditions, the work shown upon the said drawings and/or described in the said Specification and included
in the said Bill of Quantities at the rates therein set forth, amounting to the sum as therein arrived at or such other sum
as shall become payable there-under (herein referred to as the said Contract Amount).
1. In consideration of the said Contract Amount to be paid at the times and in the manner set forth in the said
Conditions, the Contractor shall upon and subject to the said Conditions execute and complete the works shown
upon the said Drawings and described in the said Specification and/or the Bill of Quantities.
2. The Employer shall pay the Contractor the said Contract Amount or such other sum as shall become payable at
the times and in the manner hereinafter specified in the said Conditions.
3. The term Landscape Architect in the said Conditions shall mean the said M/s. Site Concepts Pvt. Ltd or in the
event of the death, or ceasing to be the Landscape Architect for the purpose of the Contract, such other person as
shall be nominated for that purpose by the Employer, provided always that no person subsequently appointed to
the Landscape Architect under this Contract shall be entitled to disregard or overrule any previous decision or
approval of direction given or expressed by the Landscape Architect/Architect for the time being.
4. The term Site-In-Charge in the said condition shall mean the person so designated by the Employer to supervise
the work.
5. The said Conditions and Appendix thereto shall be read and construed as forming part of this Agreement, and the
parties hereto shall respectively abide by, submit themselves to the conditions and perform the agreements in their
part respectively in such Conditions contained.
Address Address
Occupation Occupation
Page 12 of 60
Landscaping Plantation Works in Mahindra World City, Jaipur
From: To,
. Jaipur
Dear Sir,
I/We do hereby submit my/our tender for the execution of the work specified in the under memorandum, at my/our
quoted rates for each item specified in the schedule of quantities and items, and in all respects in accordance with the
specifications, designs, drawings, and instructions in writing as per the annexed Conditions of Contract.
MEMORANDUM
Should my/our tender be accepted, I/we hereby agree to execute an Agreement to abide by and fulfill all the terms and
provisions of the Conditions of Contract annexed hereto, or in default thereof, forfeit the E.M.D. mentioned in the said
conditions, without prejudice to any other right of the Employer.
I/We hereby distinctly and expressly declare and acknowledge that before the submission of this tender, I/we have
carefully followed the instructions, read the specifications attached with the tender form and relevant ISI specifications
thereof, and that I/we have made examination of the Contract documents and drawings, specifications and quantities,
and of the locality where such work is to be done; and that I/we have taken these conditions into consideration while
preparing the tender.
I/We distinctly agree that I/we would not claim or demand upon the Employer, any claims based upon or rising out of
any alleged misunderstanding or misconceptions or mistakes on my/our part of the said covenants, agreements,
stipulations and conditions of the tender.
If upon written information to me/us by the Employer, I/we fail to attend his office therein before the end of the period
specified on such intimation, and if upon intimation being given to me/us by the Employer of the acceptance of my/our
tender, I/we fail to enter into the agreement with the Employer as defined in the tender notice, I/we shall be debarred
from the approved list of Contractors, in addition to forfeiting my/our Earnest Money Deposit already submitted with
the tender.
Any notice required to be served on me/us shall be sufficiently served on me/us if delivered to me/us personally, or
forwarded to me/us by post (registered or ordinary), or left at my/our given address.
I/We fully understand the terms and agreements of the Contract to be entered into between me/us and the Client, and
the written Agreement shall be the foundation of the rights of both parties, and the Contract shall not be deemed to be
complete until Agreement has been signed by me/us and by the Client.
Page 13 of 60
Landscaping Plantation Works in Mahindra World City, Jaipur
I/We fully understand that the Client reserves the right to accept or reject any or all the tenders, without assigning any
reasons thereof.
5. Retention Percentage in the final bill : 5% (Five percent) after final completion of the plantation
and maintenance period for all the milestones as accepted
for Virtual Completion.
6. Period of Retention : 12 months from the date of virtual completion of the last
milestone as achieved for the package of work awarded .
7. Period of Honoring : 21 days after certification.
Page 14 of 60
Landscaping Plantation Works in Mahindra World City, Jaipur
SECTION: 3
DESCRIPTION OF SITE & SCOPE OF WORK
Page 15 of 60
Landscaping Plantation Works in Mahindra World City, Jaipur
SITE DESCRIPTION
The Mahindra World City, Jaipur(Owner) site proposed on spread of an area 3000 Acres is located off
Jaipur-Ajmer Road(NH-8) on Mahapura- Kalwara Road about 21 Kms from Jaipur Airport and 18 Kms from
Jaipur Railway Station. In the first phase of development, Mahindra World City, Jaipur started its
development with 383 Acres of IT/ITeS sector Specific SEZ and currently in state of expanding its
development to additional 500+ acres of development in two sector specific SEZs as Light Site-In-Charge &
Handicraft SEZ. Besides approx 200 Acres of Land is part of the Domestic Tariff Area (Non Custom Bonded
Area).
While, the Landscape works within most of the Ph-I (383 Acres) development area is on completion, Owner
proposes plantation works in its second phase of its development. The plantation works shall be undertaken in
stages as per the work package to be released accordingly. As the area is still under development stage, it is
essential to understand the basic problem as might be faced during the time-period of execution.
2. SCOPE OF WORKS
All the Softscape works, pertaining to the Landscape works, will have to be done at MAHINDRA WORLD
CITY @ JAIPUR as per the special conditions of the contract. The entire project area is primarily low fertile
with the basic nature of the soil being highly saline and almost zero percolation which allows selective
vegetation. While utmost care has been taken on landscape proposal for the area but plantation works require
dedicated effort for ensuring survivability of the planting materials requires appropriate level of expertise and
experiences in handling of the work .The landscape shall be in stages, primarily as per the availability of the
site after completion of the Civil Works on the desired stretch. The broad scope of work is mentioned as below
while the detailed performance of the contractor shall be gauged based on the schedules as provided in the
Section-5 of Special Conditions of the Contract.
1. SPEEDY WORK: Follow-up with the Civil Contractors for handing over of the site in desired
state for speedy landscape works. Owner shall not be responsible for any delay on account of the
said reasons whatsoever.
2. SITE CLEARANCE: The landscape Contractor shall ensure the area of concern to be cleared of
all the unwanted materials like cement mix, aggregates, debris, and wastes of any type or left over
of the civil contractors before starting his work. The same should be cleared off by the civil
contractor and to be followed-up by the landscape contractor. In-event of the same not being
removed off the site by the civil contractors, Landscape Contractor shall be required to get the
undesirable waste including wild vegetations cleared off the off the site as per instruction of the
Site-In-Charge. The site clearance and preparation shall be at no additional cost but form the part
and parcel of the landscape works. The site shall be signed of for landscape works only after sign-
off by the Site-In-Charge on joint inspection with the Landscape Contractor.
3. SOIL PREPARATION: Rough grading and earthworks per section 2 of the specification. This
work shall include the supply, placement, shaping of earth berms, and or excavation and removal
of unwanted soils to tip, as may be required and as indicated in the grading drawings, details and
tender documents. This section includes the setting and formation of rough grading to plus or
minus 15cm with suitable materials to achieve the level, berms and earth contouring as indicated in
the drawings and documents. This section includes the fine grading to finish levels to plus or
minus 25mm. The contractor shall be responsible for plantation works in the right soil medium
(pH-value not exceeding 7.5) besides other chemical composition suitable for planting materials.
The contractor shall be required to get the proposed good soil tested as recommended & accepted
by the owner for entire Landscape site at definite intervals (As per instruction of the site-in-charge)
as per instruction of the Site-In-Charge. Also the soil test shall be for the final mixture ready for
plantation and should be reported appropriate for plantation works. The test will be conducted on
behalf of the contractor by the owner and shall be liable for deduction form the landscape bill as
raised by the contractor on plantation works. Also the contractor shall be required to create
landforms (mounds & berms) as per drawing and instruction of the site-in-charge for facilitation of
the drainage and aesthetic value in the landscape area. This section includes the fine grading to
finish levels to plus or minus 25mm.The payment shall be on the basis of the total volume of the
earthworks payable in cu.mt.
Page 16 of 60
Landscaping Plantation Works in Mahindra World City, Jaipur
4. PLANTATION WORKS: The landscape contractor shall be required to complete the plantation
works as per the planting schedule provided in Section-5 of Special Conditions of the
Contract.
5. MAINTENANCE WORKS: The contractor shall be responsible for maintenance of the
plantations works as per the schedule in Section-5 of Special Conditions of the Contract.
Including general cleanliness of the landscape area for entire period of the contract.
Page 17 of 60
Landscaping Plantation Works in Mahindra World City, Jaipur
SECTION: 4
CONDITIONS OF CONTRACT
Page 18 of 60
Landscaping Plantation Works in Mahindra World City, Jaipur
1. ADMINISTRATION
Conditions Hereinbefore Referred to Words imparting the singular number include the plural number and
vice-versa
Terms Used : In construing these Conditions, the Specification, Bill of Quantities, Tender Notification and
Contract Agreement, the following words shall have the meaning herein assigned to them except where the
subject or context otherwise requires.
Employer -Shall mean MAHINDRA WORLD CITY (JAIPUR) LTD and shall
or Owner include his (their) legal representative/s, assignee/s or successor/s.
Site-In-Charge -Shall mean the person so designated by Employer to supervise the
work, or his duly authorized assistant.
Landscape Architects -Shall mean M/s. Site Concepts Pvt. Ltd. designated by the Employer
as Project Landscape Architects.
Contractor -Shall mean M/s. ____________________________________ and
shall include his (their) legal representatives assign/s or successor/s,
which individual/firm has undertaken the works by virtue of this
Contract.
Site -Shall mean the site of the Contract works, including any development
works, building and erections thereon, and any other land (inclusive)
as aforesaid, allotted by the Employer for the Contractor's execution of
the scope of work.
Works -Shall mean the works to be executed by virtue of this Contract,
or Work whether temporary or permanent, and whether original, altered,
substituted or additional.
This Contract -Shall mean the Articles of Agreement, the Special Conditions, the
Conditions of Contract, the Appendices, the Bill of Quantities, the
Specification, and the Drawings attached hereto and duly signed, and
the written instructions issued from time to time by the Landscape
Architect/Site-In-Charge.
All these documents taken together shall be deemed to form one
Contract and shall be complimentary to one another.
Notice in writing -Shall mean a notice in written, typed or printed characters, sent (unless
or delivered personally or otherwise proved to have been received) by
Written Notice registered post to last known private or business address or registered
office of the addressee, and shall be deemed to have been received
when in the ordinary course of post it would have been delivered.
Act of insolvency -Shall mean any act of insolvency as defined by the Presidency Towns
Insolvency Act, or the Provincial Insolvency Act, or any Act
amending such original.
Approved, Directed or -Shall mean the approval, direction, or selection by the Landscape
Selected Architect/Site-In-Charge/Employer.
Page 19 of 60
Landscaping Plantation Works in Mahindra World City, Jaipur
2. Security Deposit The person/persons whose tender may be accepted (hereinafter called
the Contractor which expression shall, unless the context otherwise
requires, include his heirs, executors, administrators and assigns) shall
pay Earnest Money Deposit in the form of Demand Draft in favor of
MAHINDRA WORLD CITY (JAIPUR) LTD.,
Both E.M.D. and F.S.D. shall not carry any interest. If the E.M.D. is in
the form of a Bank guarantee, the same shall be valid for a minimum
period of 12 Months days. In the case of the successful tenderer, the
validity of this Bank Guarantee shall be changed for a period covering
the specified job work and maintenance period subject to further
extension of the contract period if extended.
3. Dues to Mahindra All compensation or other sums of money payable by the Contractor to
World City (Jaipur) MAHINDRA WORLD CITY (JAIPUR) LTD., under the terms of
Ltd., To Be Set Off this Contract may be released or deducted from any Security Deposit
Against Security payable to him or from the interest arising therefrom, or from any sums
Deposit which may be due or may become due by MAHINDRA WORLD
CITY (JAIPUR) LTD to the Contractor on any account whatsoever. In
the event of his security deposit being reduced by reason of any such
realization or deduction as aforesaid, the Contractor shall, within ten
days thereafter, make good in cash any such sum or sums which have
been deducted from, or raised by sale of his security deposit or any part
thereof.
4. Refund of security The 5% of the Security Deposit lodged/paid/deducted shall be refunded
deposit to him after the final bill is paid or after the successful completion of
Period of Twelve months from the date of virtual completion of work
and maintenance period thereof. The Security Deposit shall carry no
interest.
5. Definition and scope of The expression Work or Works where used in these conditions
works shall, unless there be something in the subject or context repugnant to
such landscape activities, be construed to mean the work or works
contracted to be executed under or in virtue of this Contract, whether
temporary or permanent and whether original, altered, substituted or
additional.
6. Work to be executed in The Contractor shall execute the whole and every part of the work in
accordance with the most sound and substantial and workman-like manner, and in strict
specifications, drawing, accordance with the specifications both as regard to materials and
instructions etc., workmanship. The Contractor shall also conform exactly, fully and
faithfully to the designs, drawings and instructions in writing relating to
the work signed by the Site-In-Charge or other competent authority and
lodged in his office, and to which the Contractor shall be entitled to
have access, during office hours, at such office or on the site of the
work, for the purpose of inspection. The Contractor shall, if he so
requires, be entitled at his own expense to obtain copies of the
specifications and of all such designs, drawings and instructions as
aforesaid. The Contractor shall also be responsible for the delivery of
assigned job as per complete satisfaction of the Site-In-Charge and the
execution of the work strictly in accordance with the specifications of
the work.
Page 20 of 60
Landscaping Plantation Works in Mahindra World City, Jaipur
7. Action where there is no In the case of any class of work for which there is no such specification
specification mentioned in the Contract, such work shall be carried out in accordance
with Landscape Architects specifications, and in the event of there
being no such specifications, then the work shall be carried out in all
respects in accordance with the instructions and requirements of the
Site-In-Charge or other competent authority.
8. Contractor bound by The Contractor shall be bound to carry out the work in accordance with
Site-In-Charge any instructions in this connection which may be given to him in
instructions writing signed by the Site-In-Charge, his authorized representative or
other competent authority.
The whole of the work must be proceeded with in such sections and at
such times as directed by the Site-In-Charge /Landscape Architect.
9. Failure by Contractor to If the Contractor, after receipt of written notice from the Landscape
comply with Landscape Architect/Employer requiring compliance, fails to comply with such
Architects instructions further drawing and/or Site-In-Charge/Landscape Architects
instructions, the Employer, with the recommendation of the Landscape
Architect, may employ and pay other persons to execute any such work
whatsoever that may be necessary to give effect thereto, and all costs
incurred in connection therewith shall be recoverable from the
Contractor by the Employer, on the Certificate of the Landscape
Architect, as a debt, or may be deducted by him from any moneys due
or to become due to the Contractor.
10. Alteration in work The Landscape Architect, in concurrence with the Employer, may from
time to time issue further Drawings and/or written instructions, details,
directions and explanations, which are hereafter collectively referred to
as instructions" in regard to:
The Contractor shall forthwith comply with and duly execute any work
comprised in such Landscape Architects instructions, directions and
explanations, given to the Contractor or his representative upon the
works by the Landscape Architect; which shall, if involving a variation,
be confirmed in writing by the Contractor within seven days, and if not
dissented from in writing within a further seven days by the Landscape
Architect, such shall be deemed to be Landscape Architects
instructions within the scope of the Contract. If compliance with the
Landscape Architects instruction, as aforesaid, involves work and/or
expense and loss beyond that contemplated by the Contract, then,
unless the same were issued owing to some breach of this Contract by
the Contractor, the Employer shall pay to the Contractor at the Site-In-
Charge/Landscape Architects Certificate the price of the said work (as
an extra to be valued as hereinafter provided and/or expense and/or
Page 21 of 60
Landscaping Plantation Works in Mahindra World City, Jaipur
loss).
11. Alterations in work The Site-In-Charge shall have power to make any alterations in,
omissions from, additions to or substitutions for the original
specifications, drawings, designs and instructions that may appear to
him to be necessary or advisable during the progress of the work. If, for
that purpose or if for any other reason it shall in his opinion be
desirable, he shall have power to order the Contractor to do and the
Contractor shall do any or all of the following:-
12. Orders for variations to No such variations shall be made by the Contractor without an order in
be writing writing of the Site-In-Charge. If for any reason the Site-In-Charge shall
consider it desirable to give any such order verbally, the Contractor
shall comply with such order and any confirmation in writing of such
verbal order given by the Site-In-Charge, whether before or after the
carrying out of the order, shall be deemed to be an order in writing
within the meaning of this clause; and if the Contractor shall within
seven days confirm the order in writing to the Site-In-Charge and if
such confirmation is not contradicted in writing within fourteen days by
the Site-In-Charge, it shall be deemed to be an order in writing by the
Site-In-Charge.
Any additional work which the Contractor may be directed to, in the
manner above specified, as part of the work, shall be carried out by the
Contractor on the same conditions in all respects on which he agreed to
do the main work and at the same rates as are specified in the tender for
the main work.
13. Variation not to vitiate No alteration, omission, deletion or variation shall vitiate this Contract,
Contract but in case the Landscape Architect thinks proper at any time during the
progress of the works to make any alterations in or additions to or
omissions from the works or any alteration in the kind or quality of the
materials to be used therein, and shall give notice thereof in writing
under his hand to the Contractor, the Contractor shall alter, add to or
omit from, as the case may require, in accordance with such notice, but
the Contractor shall not do any work extra to or make any deviation
from any of the provisions of the Contract, stipulation, specification or
Contract drawings, without the previous consent in writing of the
Landscape Architect; and the value of such extras, alterations, additions
or omissions shall in all cases be determined by the Landscape
Page 22 of 60
Landscaping Plantation Works in Mahindra World City, Jaipur
The Contractor shall provide maintenance for the work for the above-
specified period of twelve months, and shall ensure that all works are
maintained in perfect condition.
19. Program of work The Contractor shall submit a revised Schedule & Chart detailing the
scheduled program of works and schedule of procurement of materials,
as per the time frame specified in this tender, and approved by the
Employer/ Landscape Architect/Architect. The said Schedule & Chart
shall be submitted subsequent to the acceptance of the tender and within
seven days of the final agreement made between the Employer and the
Contractor. The Schedule & Chart shall be considered part of the final
agreement, and shall be binding upon the Contractor.
The Schedule shall be revised and brought up-to-date every month and
copies of the same shall be forwarded to the Landscape
Architect/Employer. It is the Contractor's responsibility to see that these
schedules are adhered to. The Employer will not entertain any claim by
of the Contractor and Landscape Contractors on account of delay in
delivery of materials by the Employer.
20. Written order to After acceptance of the tender, the Site-In-Charge shall issue a written
commence work order to the successful tenderer to commence the work, and the
Contractor shall begin work at site within seven days of receiving such
order.
The Contractor shall enter upon or commence any portion of work only
with the written authority and instructions of the Site-In-Charge.
Without such instructions the Contractor shall have no claim to demand
for measurements of or payment for work done by him.
21. Review of progress The progress of works shall be reviewed periodically by the
Employer/Landscape Architect, as per the Schedule & Chart submitted
by the Contractor at the time of final agreement and revised
periodically.
22. Responsibility for delay In case the progress achieved falls short by more than 25 percent of the
cumulative program, the reasons for such shortfall shall be examined
and a record made thereof apportioning the responsibilities for the delay
between the Contractor and the Employer. This record should be signed
in full and dated both by the Site-In-Charge and the Contractor.
23. Settlement of dispute In case of dispute between the Site-In-Charge and the Contractor
regarding shortfall in regarding the responsibility for the shortfall in progress, the matter shall
progress be referred to the Landscape Architect who shall thereupon give
decision within one month of the date of receipt of reference. The
decision of the Landscape Architect shall be final and binding on the
Contractor and the Site-In-Charge.
24. Materials and All materials and workmanship shall, so far as procurable, be of the
workmanship respective kinds described in the schedule of quantities and/or
specification and in accordance with the Landscape Architect/Site-In-
Charge instructions. The Contractor shall, upon the request of the
Landscape Architect/Employer, furnish him with all invoices, accounts,
receipts, and other vouchers to prove that the materials comply
therewith.
All planting materials to be used on the work shall comply with the
requirements of the specifications in case of not confirming shall be
established as the best available in the market by the Landscape
Architect/Site-In-Charge on due verification before approving the same
Page 24 of 60
Landscaping Plantation Works in Mahindra World City, Jaipur
to be planted on site.
The Contractor shall be entirely responsible for the proper and efficient
carrying out of the work. The work shall be done in the best and most
workmen like manner. The availability of the best available planting
materials shall be inspected by the site-in-charge or his designated staff
from the source of procurement before being loaded for transport to the
site. The contractor shall be required to make arrangement for the visit
after he has identified the source for approval by Employer/Landscape
Architects or his representative on the site.
25. Samples of work The Contractor shall at his cost make all arrangements or shall provide
for all such facilities as the Site-In-Charger/Landscape Architect may
require for execution of the samples to such place or places as may be
directed the Site-In-Charge/Landscape Architect.
26. Drawings The details of the Landscape Areas are shown on the drawings attached
at the end of this document.
Page 25 of 60
Landscaping Plantation Works in Mahindra World City, Jaipur
29. Setting out work The Contractor shall set out the works and shall be responsible for the
true and perfect setting out of the same and for the correctness of the
position, levels, dimensions and alignment of all parts thereof in
accordance with the drawing, If at any time any error in this respect
shall appear during the progress of the works, the Contractor shall, at
his own expense, rectify such error as required, to the satisfaction of the
Site-In-Charge/Landscape Architect.
The Contractor shall have to clear the site as directed before the work is
commenced, without any extra cost.
30. Grant of extension of If the Contractor shall desire an extension of the time for completion of
time the work on the ground of his having been unavoidably hindered in its
execution or on any other ground, he shall apply in writing to the Site-
In-Charge before the expiration of the period stipulated in the tender or
before the expiration of thirty days from the date on which he was
hindered as aforesaid or on which the cause for asking for extension
occurred, whichever is earlier; and the Site-In-Charge or other
competent authority may, if in his opinion there are reasonable grounds
for granting an extension, grant such extension as he thinks necessary
or proper. The decision of such competent authority in this matter shall
be final.
32. Penalty for delay When the shortfall in the progress of work is determined to be due to
delay on the part of the Contractor, he shall be held to be responsible
for the same and shall be liable to pay penalty. In respect of the shortfall
in progress, assessed as due to the delay on part of the Contractor the
Contractor shall be liable to pay as penalty an amount of Rs.5000/-
(Rupees Five Thousand only) per day, up to a maximum amount of 2 %
in contract sum, after which the Employer reserves the right to
terminate the Contract.
In the case of any failure by the Contractor to pay such penalty, the
Site-In-Charge or other competent authority may rectify or remove, and
re-execute the work or remove and replace the materials or articles
complained of, as the case may be, at the risk and expense in all
respects of the Contractor.
33. Action when whole of In any case in which under any clause or clauses of this Contract, the
Security Deposit is Contractor shall have rendered himself liable to pay compensation
forfeited and/or penalty amounting to the whole of his Security Deposit
including the amount deducted in installments from his bills as Further
Security Deposit, the Site-In-Charge, on behalf of the Employer, shall
have power to adopt any of the following courses as he may deem best
suited in the interest of MAHINDRA WORLD CITY (JAIPUR)
LTD.,
Page 26 of 60
Landscaping Plantation Works in Mahindra World City, Jaipur
34. Rescission of Contract To rescind the Contract (of which rescission notice in writing to the
and Forfeiture of Contractor under the hand of the Site-In-Charge shall be conclusive
security deposit evidence), without prejudice to the right of MAHINDRA WORLD
CITY (JAIPUR) LTD., to recover any loss from the Contractor. In
that case, the Security Deposit of the Contractor, including whole or
part of the lump sum deposited by him and also the amount deducted
from his bills as Further Security Deposit, shall stand forfeited and be
absolutely at the disposal of MAHINDRA WORLD CITY
(JAIPUR) LTD., Debiting cost of labor and materials supplied
The charges to be made in the bills shall always be entered at the rates
specified in the tender, in full or in part as the case may be. In the case
of any extra work ordered in pursuance of these conditions, and not
mentioned or provided for in the tender, the charges in the bills shall be
entered at the rates herein provided for such work.
One copy of the passed bill shall be given to the Contractor without
any charge.
48. Scrutiny of bills The details furnished by the Contractor in the bill should be completely
scrutinized and the said work should be checked to be in accordance
with the measurements recorded on the spot. The countersignature of
the Contractor or his agent in the Measurement Book and drawing shall
be sufficient proof as to the correctness of measurements, and shall be
binding on the Contractor in all respects.
49. Non-submission of bills If the Contractor does not submit the bills within the prescribed date,
the Site-In-Charge shall deputize a subordinate to measure up the said
work. The countersignature of the Contractor shall be obtained in the
Measurement Book concerned, with reference to which the bill may be
prepared by the Site-In-Charge.
50. Payment of bills The Contractors shall be paid by the Employer, from time to time, by
installments under Interim Certificates to be issued by the Site-In-
Certificate and Charge/Landscape Architect to the Contractor, on account of the works
payments executed, when in the opinion of the Landscape Architect/Site-In-
Charge work to the approximate value named in the Appendix as
Value of work for Interim Certificates (or less at the reasonable
discretion of the Site-In-Charge/Landscape Architect) has been
executed in accordance with this Contract, subject, however, to a
retention of the percentage of such value named in the Appendix hereto
as "Retention Percentage for Interim certificates.
Page 29 of 60
Landscaping Plantation Works in Mahindra World City, Jaipur
Page 30 of 60
Landscaping Plantation Works in Mahindra World City, Jaipur
In the case of lump sum items, it is understood that the Contractor has
taken into consideration all details/drawings provided before quoting.
All queries regarding clarification should be made before quoting. The
tenderer shall not be entitled to any claim on the lump-sum items.
55. Issue of final certificate On completion of the work, the Contractor shall report in writing to the
Site-In-Charge the completion of such work, and the Site-In-Charge
Certificate of virtual shall issue a certificate of Virtual Completion stating in writing that the
completion work has been so completed. The Defects Liability Period shall
commence from the date of such certificate.
Page 31 of 60
Landscaping Plantation Works in Mahindra World City, Jaipur
Then and in any of the said cases, the Employer with the written
recommendation of the Landscape Architect may, notwithstanding any
previous waiver, after giving seven days notice in writing to the
Contractor, terminate the Contract.
Further, the Employer or his agent or his servants, may enter upon and
take possession of the works and all plant, tools, scaffoldings, sheds,
machinery, and other power utensils and materials lying upon the
premises or the adjoining lands or roads, and use the same as his own
property or may employ the same by means of his own servants and
workmen in carrying out and completing the works, or by employing
any other Contractors or other person or persons to complete the works,
and the Contractor shall not in any way interrupt or do any act, matter
or thing to prevent or hinder such other Contractor or other person or
persons employed for completing and finishing or using the materials
and plant for the works. Upon completion, or as soon thereafter as
convenient, the Landscape Architect/Employer shall give a notice in
writing to the Contractor to remove his surplus materials and plant, and
should the Contractor fail to do so the Employer shall sell the same by
public auction, and shall give credit to the Contractor for the amount
realized.
58. Contractor to The Contractor shall give all necessary personal supervision during the
superintend work execution of the works, and active supervision on the works as long
thereafter as the Landscape Architect/Site-In-Charge may consider
necessary, until the expiration of the "Defects Liability Period" stated in
the Appendix hereto.
59. Contractor or The Contractor shall, at all times during the usual working hours, and at
responsible agent to be all other times at which reasonable notice of the intention of the Site-In-
present Charge or other competent authority or his subordinate to visit the work
shall have been given to the Contractor, either himself be present to
receive orders and instructions, or have a responsible agent, duly
accredited in writing, present for the purpose. Orders given to the
Contractors duly authorized agent shall be considered to have the same
force and effect as if they had been given to the Contractor himself.
60. Employment of The Contractor shall employ the following technical staff during
technical staff execution of this work:-
Page 32 of 60
Landscaping Plantation Works in Mahindra World City, Jaipur
from the full and entire responsibility of the Contract or from active
supervision of the works during their progress.
All Landscape works, trees, shrubs, plants, lawns apart from the
features present within or outside the plantation area shall be
maintained, and kept free from damage due to operations in connection
with the work.
The Contractor shall make his own arrangements for prevention and
appropriate measure for protection of the plantation materials from the
cattle and wild animals at his own cost.
The Contractor shall indemnify the Employer against all claims which
may be made against the Employer by any member of the public or
other third party, in respect of anything which may arise in connection
to the works or in consequence thereof. The Contractor shall, at his own
expense, arrange to effect and maintain, until the virtual completion of
the Contract, a policy of Insurance against such risks, in the joint names
of the Employer and the Contractor, with an approved office; and
deposit such policy or policies with the Architect/Employer from time
to time during the currency of this Contract.
When such permit is given, and also in all cases when destroying cut or
dug up trees, brushwood, grass, etc., by fire, the Contractor shall take
necessary measures to prevent such fire spreading to or otherwise
damaging surrounding property.
69. Fire insurance The Contractor shall, at the time of signing the Contract, insure the
works, and keep them insured until the virtual completion of the
Page 35 of 60
Landscaping Plantation Works in Mahindra World City, Jaipur
The Contractor shall bear the expenses of defending any action or other
legal proceedings that may be brought by any person for injury
sustained by him owing to neglect of precautions to prevent the spread
of fire and shall pay any damages and cost that may be awarded by the
court in consequence.
70. Contractor to provide The Contractor shall provide everything necessary for the proper
everything necessary execution of the works according the intent and meaning of the
Drawings, Schedule of Quantities and Specification taken together,
whether the same may or may not be particularly shown or described
therein, provided that the same can reasonably be inferred therefrom.
71. Materials The Contractor shall supply at his own cost all materials (except such
special materials, if any, as may in accordance with the Contract be
supplied from by MAHINDRA WORLD CITY (JAIPUR) LTD.,
plant, tools, appliances, implements, ladders, cordage, tackle,
scaffolding and temporary works requisite for the proper execution of
the work, whether in the original, altered or substituted form, and
whether included in the specifications or other documents forming part
of the Contract or referred to in these conditions or not, and which may
be necessary for the purpose of satisfying or complying with the
requirements of the Site-In-Charge or other competent authority as to
any matter as to which under these conditions he is entitled to be
satisfied, required together with carriage therefore, to and from the
work. The Contractor shall also supply without charge the requisite
numbers of persons with the means and materials necessary for the
purpose of setting out works, executing the work, and counting,
weighing and assisting in the measurement or examination, at any time
and from time to time, of the work or the materials.
72. Services The Contractor shall provide such temporary road or roads on the site
as may be necessary for the proper performances of the Contract and
Page 36 of 60
Landscaping Plantation Works in Mahindra World City, Jaipur
for his own conveyance and also for the Landscape Contractors of the
Employer. Upon completion such roads shall be broken up and leveled,
where so required by the drawings, unless Site-In-Charge/Landscape
Architect shall otherwise direct.
The Contractor shall provide and maintain proper sheds for the storage
and protection of materials etc., and other work that may be executed
on the site, including the tools and materials that may be used for
execution on the site, including the tools and materials of Landscape
Contractors, and remove same on completion. Sheds for storage of
cement should be waterproof & lockable, and are to have floors raised
from the ground, and shall be open for inspection whenever required by
the Site-In-Charge/Landscape Architect, and shall be moisture-
free/water-proof and the same shall be removed after completion of
work as stipulated.
The Contractor shall provide at his own cost all artificial light required
for the work and to enable the Contractors and Landscape Contractors
to complete the work in specified time. The Contractor shall arrange for
alternate power supply by way of diesel generator set to avoid
interruption of work during power outages.
The Contractor shall make provision for water supply and sanitary
arrangements for his employees, and keep the same in a clean and
sanitary condition to the satisfaction of the public health authorities, and
shall make good all works disturbed by these conveniences.
73. Security and safety The Contractor shall provide all persons working at site with helmets,
safety goggles, safety belts, and such other equipment, for ensuring
safety from injury.
The Contractor, from the time of being placed in possession of the site,
shall provide safety & security for watching, lighting and protecting the
work, the site and surrounding property by day, by night, on Sundays or
other holidays, at no extra cost to the Employer.
The Contractor shall display all danger signs, contains notices at the site
to notify all about the safety aspects.
The Contractor shall provide all necessary fencing and lights required
to protect the public from accident
74. Penalty for default If the Contractor is in default ,the same may be provided by the Site-In-
Charge or other competent authority at the expense of the Contractor,
and the expenses may be deducted from any money due to the
Contractor under this Contract or from his Security Deposit or the
proceeds of sale thereof, or of a sufficient portion thereof.
Page 37 of 60
Landscaping Plantation Works in Mahindra World City, Jaipur
(JAIPUR) LTD., may have fixed in this regard. Any dispute which
may arise in connection with the implementation of this clause shall be
decided by the Site-In-Charge or other competent authority, whose
decision shall be final and binding on the Contractor.
The Contractor shall employ any famine victim, convict or other labor
of a particular kind or class, if ordered in writing to do so by the
Employer or other competent authority.
Dismissal of workmen
Labor camp
The Contractor shall provide reasonable facilities for the use of his
scaffolding, tools and plant etc., by the Landscape Contractors of other
works for their work, without any extra cost, by special arrangement
with the Employer.
80. Contractor responsible The Contractor will be responsible for the coordination of all the work,
for coordination including that of his Landscape, and cooperating with all other agencies
for arranging runs of all services and working to the requirements and
layouts of the specialist trades, in all matters necessary for the complete
timely execution of the work as desired.
81. Water and electricity The Contractor will have to make his own arrangements to supply water
and electricity to the various works.
Objects of antiquity
All objects of value or antiquity found on the site shall remain the
property of the Employer, and such findings shall be immediately
reported to the Landscape Architect/Employer.
Advertisements
Page 40 of 60
Landscaping Plantation Works in Mahindra World City, Jaipur
SECTION: 5
SPECIAL CONDITIONS OF CONTRACT
Page 41 of 60
Landscaping Plantation Works in Mahindra World City, Jaipur
The contractor should get the soil test report and accordingly with
experts and consultants would meet the requirement for additives
c) Soil Testing and soil conditioner to possibly maintain pH value of the soil
between 7.0 - 7.5 before plantation works. Also after every 6
months or as required on poor performance of the plantation shall
accordingly get the soil tested and measures taken for maintaining
the pH value within acceptable range. Also Contractor shall
undertake treatment as per advice of the experts to soil
conditioning during the entire maintenance period
Contractor should employ qualified & experienced garden
supervisors and adequate number of gardeners to maintain the
quality of garden and tree plantation to the satisfaction of
d) Manpower Employment Horticulture Department. A senior supervisor [M. Sc. (Horticulture)
or B.Sc(Agriculture) with 8-10 Years of relevant & similar work
Experiences. should be deputed as an overall in-charge of the whole
contract who will ultimately report to the Site-In-Charge
The deployment of the maintenance staff should be adequately
provided as per the Schedule of the Maintenance Staff
Page 42 of 60
Landscaping Plantation Works in Mahindra World City, Jaipur
i) Provision for Water For Trees-@ 20 ltrs/every alternate day of watering should be
provided to each of the tree planted.
For Shrubs-@15 ltrs/sq.mt/every alternate day of watering should
be provided by the contractor
For Lawns-@ 25 ltrs/sq.mt/weekly requirement of watering should
be provided by the contractor
Water will be provided by owner free of cost. Wherever irrigation
tap connection is not available, watering should be done with water
tankers or appropriate methodology. The maintenance of tankers or
any appropriate system shall be integral responsibility of the
Contractor to meet the watering requirements of the Trees, shrubs
and lawns under any circumstances.
Owner shall provide point electrical connection wherever possible
but in case of un-availability of the same it will be Contractor's
responsibility to make arrangement for Diesel Genset to meet their
j) Electricity
requirement. The use of electricity shall be on chargeable basis. The
contractor shall install electricity meter and shall pay for the
metered readings as per the rates settled with the owner.
Page 43 of 60
Landscaping Plantation Works in Mahindra World City, Jaipur
Payment Terms based on the item rates for the quantum of the
certified virtual completion of the work shall be as follows
2. PLANTING SCHEDULE
I. Tree Plantations
Page 44 of 60
Landscaping Plantation Works in Mahindra World City, Jaipur
Planting the tree with root ball in the pit (tin grown / poly bag grown)
3 Planting of trees after removing carefully and without disturbing the root. Pressing the
soil firmly around the tree planted. Preparing the basin around the
tree and watering after staking and tying. The plant should be well
maintained, disease free, well trimmed at the time of handing over.
In case of death of the plant the contractor need to replace the same
with equally well grown healthy plant.
Page 45 of 60
Landscaping Plantation Works in Mahindra World City, Jaipur
Making basin around Trees ( 1mtr dia clear space) and maintaining
Tools and Tackles/Hose-pipes, tractor mounted Water Tankers or as
6 Watering Arrangement required in sense all arrangement for water distribution and watering
equipments/manpower to be managed by the Contractor for watering
the trees;
C. Handing Over of Trees
All Tees planting should have Name Tag with name of the relevant
species and well placed on trees with good visual characteristics.In
1 Name Plate for Trees
case of row plantation of similar species,the same can be repeated at
definite intervals may be on every 5th tree from the start
D. Maintenance of Trees
Apart from the essential watering of the plants as per the maintenane
manual ,Nurture the trees with organic solid manures and liquid
manures, spray bioinsecticides, parasites, predators to protect the
trees from pest and disease. Amend the soil on regular basis with
proper soil amendments to keep the pH level between 7 - 7.5 after
completion of (12)Twelve month maintenance period the plants
should be maintained by regular watering, weeding, replacing dead
plants, applying pesticides, Use of plant physical protection
1 Maintenance of Trees
measures etc. so as to grow them vigorously.
Newly Planted should be maintained by 1) Watering every alternate
days @ 20 ltrs/watering cycle 2) Applying FYM @
10kg/ tree/ annum 4) Trimming, prunning as & when required under
guidance of the site-in-charge etc.
3)The Trees should have proper staking so as the tree should stand
erect till the Tree settles with no possibility of bending due to Wind
or Rain
I. Shrubs Plantations
Sl.No Terms of Reference Description
A. Supply of Shrubs,Creepers,Ground Covers
Plant material shall be well formed and shaped true to type and free
Health of Shrubs/Ground from disease, insect and defect such as knots, windburn, sun-cold,
Cover/Creepers etc injuries, abrasion or disfigurement.
All plant materials shall be healthy, sound, vigorous with good
foliage, and free from plant diseases, insect pests, or their eggs, and
shall have healthy well-developed root systems. Plants supplied shall
be conforming to the names listed on the plant list. No plant
materials will be accepted if branches are damaged or broken. All
Physical Condition material must be protected from the sun and weather until planted.
The species should be in appropriate specification in terms of height
& Foliage as provided in BoQ.
Page 46 of 60
Landscaping Plantation Works in Mahindra World City, Jaipur
Preparation of soil for grass, ground cover, edges, shrubs and flower
beds: . Then prepare the same soil with 2-3" thick layer of well
decomposed, weed free farm yard manure or vermicompost. Treat
the soil with chloriphyriphos / Lindane / Neemcake depends upon
the infestation of soil borne pests. Treat the soil with proper
herbicide to control the weeds only on need basis. Finally level the
soil as per the drawing or planting details.
Preparation of pits for shrubs, creepers and hedges : The bed shall be
prepared with good earth mixed with 1/3rd quantity of decomposed
faryard manure along with
Page 48 of 60
Landscaping Plantation Works in Mahindra World City, Jaipur
Planting Dibbling of grass: Fine level the soil, apply thin layer of sand,
vermicompost and Neemcake mixture of 1" thickness and dibble the
grass at 3" distance. Roll the lawn after planting. Irrigate the lawn
regularly. Remove weeds on periodical basis. Nurture the lawn with
organic, bio-insecticides, parasites, predators to protect the lawn
from pest and disease. Mow the lawn regularly and maintain the
grass at 50 mm (2") height. Trim all the edges after mowing, keep
the edges with trees, shrubbery and flower beds clean.
3. MAINTENANCE SCHEDULE
a. The Landscape Contractor shall maintain the works for the maintenance period. The Employer reserves
the right to terminate the maintenance period at any time, whereby no additional charges are to be made
by the Landscape Contractor to the Employer.
b. The extend of the landscape to be maintained by the Landscape Contractor shall be deemed to cover and
include all softscape landscape areas within the overall project boundaries as shown on the drawings
including any existing soft landscape not affected by the Sub-Contract works and retained intact or nearly
so through the end of the Sub-Contract period as well as all the landscape works covered in the Sub-
Contract scope of works. No additional charges will be allowed unless specifically agreed to by the
Landscape Architect in writing.
c. The Landscape Contractors Horticulturist shall inspect the site every day and shall submit report to the
owner on their actions and closure of the pending works .Also on weekly basis, the Contractors
Horticulturist shall prepare a brief schedule of operations planned for the week with target dates.
d. The daily report and the weekly schedule shall be running record of proposed operations which would be
checked at the maintenance inspections every month. If in the opinion of the Landscape Architect/Site-In-
Charge, the maintenance works have not been satisfactorily carried out according to site conditions and
the specifications, the quarterly payment will be withheld until the works have been satisfactorily carried
out besides the penalty as in the penalty clause.
e. The Landscape Contractor shall take all necessary measures to ensure that all pot plants, trees and shrubs
and other plants shall thrive and become established within this period. All landscape areas will be
Page 49 of 60
Landscaping Plantation Works in Mahindra World City, Jaipur
inspected and list of remedial works issued after each inspection. All items on the remedial lists are to be
carried out by the time of the next inspection.
f. The Landscape Contractor shall keep the landscape areas clean and tidy at all times and dispose of all
waste materials arising from the cleaning.
g. If the Landscape Contractors works are found to be unsatisfactory, payment shall be withheld and the
maintenance period extended for the period of time that the landscapes maintenance has not been
satisfactory. All cost associated with the extension of time shall be borne by the contractor.
a. The Landscape Contractor shall water all trees, palms, shrubs, groundcover, herbaceous plants and other
planting areas as often as necessary to keep the ground moist all around and to the full depth of the roots.
b. Only fresh water shall be used for the Works. The Owner shall provide water requirement of the planting
materials but watering shall be all time (Work presence of the Contractor on site) responsibility of the
Contractor till the time proper system (Irrigation) is placed by the Owner. Landscape Contractor shall supply
all water requirements at his own costs. The Landscape Contractor shall supply his own hoses and sprinklers
to distribute the water.
c. Water shall be applied using an approved rose or sprinkler so as not to cause compaction or wash-outs of the
soil or loosening of plants. The Landscape Contractor shall immediately make good any such damage.
d. All planting beds are to be kept in a weed free condition with a weeding operation as per maintenance
schedule or more regularly as required. All weeds, stones and rubbish collected from this operation shall be
removed from the site by the Landscape Contractor.
e. Firming up and adjusting of stakes/ties shall be carried out monthly to ensure that the trees and shrubs are
firmly held in ground. If required, guy ropes or tree ties shall be adjusted, tightened or loosened. If tree ties or
ropes are rubbing the bark of the trees, the ties are to be taken off and retied. Any damaged branches are to be
carefully pruned and the wounds sealed.
f. All protective fencing is to be maintained and kept in good condition as long as required on site.
g. All shrubs and groundcovers are to be reviewed monthly and pruned as per maintenance schedule or as and
when required during the Maintenance Period to promote bushy growth and good flowering characteristics.
The shrubs shall be checked and all dead wood, broken, damaged or crossed branches shall be cut back,
depending on species.
h. Pruning for all plants shall be carried out as follows :
Pruning is to be done with the cut just above and sloping away from an outward facing healthy bud.
Removal of branches is to be done by cutting flush with the adjoining stem and in such a way that no
part of the stem is damaged or torn.
Ragged edges of bark are to be trimmed with a sharp knife.
Any cuts or wounds over 25mm diameter are to be painted with an approved sealant such as Arbrex
after trimming.
All pruning are to be cleared up and removed from operation site after pruning for Vermi-
Composting.
i. All hedges, mat forming herbaceous plants and groundcover plants shall be clipped with shears as often as
necessary (at least monthly) to maintain a tidy appearance. Tall hedges are to be cut to forms shown on the
drawings.
j. Selective pruning of flowering plants shall be done where special flowering characteristics are required such
as for Ixoras, Hibiscus, Bougainvillea etc
k. The Landscape Contractor shall on continual basis supervise and attend to fertilizer needs/disease
control/termite or fungus control as maintenance operations during the entire period of contract An approved
fertilizer/insecticides/pesticides shall be applied to each plant at the rate provided in the maintenance schedule
or as suggested by the Horticulture Advisor to the Owner. Fertilizer shall apply the fertilizer evenly spread
over the entire area and lightly forked into the soils. All areas shall be well watered immediately after
application of fertilizer.
Page 50 of 60
Landscaping Plantation Works in Mahindra World City, Jaipur
l. The horticultural requirements of different plants or areas may involve variations to those techniques (such as
the use of organic liquid fertilizers for sensitive plants) and variations in method will be authorized as
required.
m. Mulching. An additional 25m deep mulching layer is to be spread over all planted areas (except groundcover
and turf), once every 6 months or as specified in Maintenance Schedule.
n. The Landscape Contractor shall make regular weekly checks to ensure that the plant material is insect and pest
and free
a) The Landscape Contractor shall mow all lawn areas using approved cutting equipment to maintain a close
sward to a height of not less than 20mm and not move than 45mm for all grass types. Mowing shall be carried
out weekly, except in dry weather and grass shall not be allowed to flower between cuts. All clippings to be
gathered up and removed.
b) All grass areas are to be watered during dry weather as often as is required to keep the grass green and the soil
moist. The Landscape Contractor shall make weekly inspections are to be made to determine the need for
water.
c) Fertilizer of NPK value 10-15-15 or similar approved be spread at a rate of 40gm/m2 over all grass areas at 6
months intervals using approved spreading equipment to give an overall even spread. Every three months
between the NPK application the grass areas will receive and application of 46-0-0 at 1kg/100m2.Grass areas
that have been fertilizer shall be watered immediately. If the tops of the Anoxopus turn red a light application
of lime using magnesium, limestone or agricultural lime in powder form is to be applied in dry weather at a
rate of 50g/m2. After application this is to be well watered into the soil.
d) The Landscape Contractor shall apply top dressing of not more than 15mm depth of fine sand and granulated
compost raked and spread evenly over the lawn areas to fill in the low spots and level the grass areas. The next
top dressing shall be applied only after the grass has grown to a mow able height.
e) There shall be at least two applications of top dressing during the maintenance period. If depressions or bumps
over 25mm deep or high occur in turf areas during he maintenance period these are to be leveled out by lifting
the turf and raising the soil level with sand/compost mix or trimming soil to level grades, followed by re-
turfing.
f) Grass areas are to be kept free from weeds, annual grasses, fungus and insect attack, and stones or other debris
throughout the maintenance period as often as is required. Assessment of these operations is to be prepared on
the basis of the bi-weekly maintenance inspection chart.
g) If compaction or consolidation takes place or hard panning or baking of the soil occurs, the soil areas are to be
well watered first and lightly loosened by mechanical means such as spiking, slitting or hollow tinning using
equipment approved by the Landscape Architect.
Frequency
Sl.No Operation (Times) Period/Duration after Handing Over
( c) In winter 10 Monthly
Page 51 of 60
Landscaping Plantation Works in Mahindra World City, Jaipur
2 Weeding- 2 Monthly
9 Fertilizing
Site Cleaning & maintenance of General As & When required but site should
11 Appeal of the Site Daily be maintained clean
As per the minimum need of the maintenance requirement to the landscape developed area on gross basis as
per the maintenance schedule, the following number of the person shall be required for desired activities based
on the 5 Acres(20235 sq.mt) area under landscape.
Besides, the contractor shall have to deploy a horticulturist as per criteria specified in the Section-5 :
Special Conditions of Contract Clause1(d)
4. SOIL TESTING
The Contractor shall be required to get the soil test done as per instruction and supervision of the Site-In-
Charge for ensuring the soil correction before the plantation works. The soil test shall be done @ minimum 20
Nos, the location selected randomly by the Site In-Charge.
Page 52 of 60
Landscaping Plantation Works in Mahindra World City, Jaipur
5. PLANTING PRACTICES-APPLICATION
a. Soil Conditioner
Soil Conditioner shall be Peat Moss, organic compost composted rice hulls or other approved fibrous
organic matter suitable for mixing with topsoil to make a friable growing medium for plants. It shall be
resistant to rapid decay, free from soluble salts (below 900ppm), pH 6-7, free from large lumps or debris.
A sample shall be submitted to and approved by the Landscape Architect prior to installation.
Page 53 of 60
Landscaping Plantation Works in Mahindra World City, Jaipur
b. Organic Compost
Organic compost shall be an organic vegetable compost produced thorough a horticultural or industrial
composting process. Compost is to be clean, decomposed, smell free, and free of any debris, refuse, clay or
visible fungus. A sample and test data is to be submitted for approval before use. All compost is to be
sterilized before being packed for transport. Any odorous materials delivered to site will be rejected. Any
vermin resulting from use of organic compost will have to be controlled by the Landscape Contractor
within 12 hours.
c. Peat Moss
Peat Moss shall be fibrous fresh water peat from vegetable fibre. Peat will have a pH of 5.8 6.5 and shall
be free of soluble salts greater than 900 micromos; Peat shall be free of lumps, sticks or stones greater
than 5mm.
e. Sand
Sand shall be clean, coarse, well graded material, free from soluble salts. Particles shall range in size so
that 80-100% passes the 1mm sieve and 0-50% passes the 250 micron sieve.
f. Fertilizers
Chemical fertilizers shall be approved granular fertilizers. Fertilizer may be single element or compound,
normal or slow release compound fertilizers. They shall be stored in waterproof sealed bags under shelter
away from water and direct sunlight. Samples shall be submitted to, and approved by the Landscape
Architect, before use in the Works.
Organic fertilizers shall be organic products such as organic liquid fertilizer, pellets or granules
manufactured primarily from organic materials. These products are to be from accredited sources and
technical data indicating sources of origin and manufacturing process must be submitted and approved
before use. Animal by-products must be sterilized before being packed for transport and odorous
materials used on site will be rejected.
g. Mulches
Mulches shall be an approved friable-composted organic material such as Oil Palm husks, organic
compost or an approved mix. Coco-peat will not be allowed unless mixed in a proportion of 50-50 with
another mulching material free from soluble salts or toxic materials and resistant to rapid decay. Mulches
shall have a pH of 5.5 - 7.0. Samples are to submitted to the Landscape Architect and approved before
use.
Mulches are to be applied in a 50mm thick layer over the entire surface of shrub and groundcover areas.
Mulching is to be re-applied to expose soil in planting areas every 3 months after initial installation until
the end of the maintenance period or until complete surface cover by vegetation is achieved.
Initial mulching is to take place within two days of installation of planting.
a. General
Page 54 of 60
Landscaping Plantation Works in Mahindra World City, Jaipur
i. Stakes shall always be used when planting instant trees, standards and single stem palms and for tall
shrubs as indicated in the drawings.
ii. Stakes shall be mangrove poles, bamboo or equal and shall be appropriate to the size of the plant to be
supported.
b. Guying
i. Guying shall be used for large trees or palms. A minimum of three wire guys are to be used per tree.
Each guy wire is to be fastened by a loop around the lowest branches of the tree at the junction with the
main trunk or stem. Loops are to have protective rubber or plastic hose to prevent chafing and are to be
fastened back to the guy wire by means of U-clamps. Wire shall be 2.5mm PVC coated GI wire, green
colour. Palms shall have 5mm x 3mm x 30mm battons fastened about the trunk with GI wire at the
height where the guy wires are to be secured. Guy wires will fasten to the battons and not to the main
trunk.
ii. Guy wires are to be fastened at ground level to short stakes firmly driven at an angle into the ground.
Stakes shall be 5mm GI coated angle iron or 75mm mangrove. Stakes shall be a minimum length of
600mm and are to be driven deep enough to resist movement. A notch is to be made near the top of
each stake for the fastening of the guy wire. Stakes shall be positioned equally around the tree and shall
extend at least 300mm beyond the tree pit. Distance away from the tree shall be gauged on site to
provide firm and secure guying. Distance of stakes and final positions shall be finalized on site to
provide firm and secure guying.
iii. Each guy wire is to have one turnbuckle located near the fastening to the stake. Guy wires are to be kept
properly tension and adjusted to maintain the tree in a vertical position without guy wires being rigid.
c. Double Staking
i. Double staking shall be used for standard trees. Two 50mm x 50mm stakes shall be driven into the
ground vertically on either side of and outside the rootball of the tree so as to form a straight line with
the stem at the center. Stakes shall be driven in to penetrate the bottom of the tree pit and be deep
enough to resist lateral movement when tested. Stakes shall not extend beyond the lowest branch of the
tree and if necessary are to be sawn off at the top.
ii. Fastening or securing of the tree may be carried out by using either :
a) Cross bar a wooden cross bar of same section as the stakes is fastened in a horizontal
position to the outside of the stakes by nails or tying securely at a level below the lowest
branch. The tree is fastened to the cross bar with a single adjustable tie of an approved
rubberized or plastic type with a spacer and shall be fastened to prevent any chafing or
abrasion of the bark. Nails or fittings are not to be driven into the tree trunk.
b) Wire/Hose loops Two separate wire or rope loops are made about the stem just below the
lowest branch with each being fastened back to one of the vertical stakes. Each loop is to
have a protective outer covering or sheath of rubber hose to prevent chafing or abrasion of
the bark. The wire is to be fastened to the stakes in a manner that allows adjustment of the
tension to be made easily. Tension on each wire to be equal to maintain the tree in a vertical
position. The wire shall be 2.5mm PVC-coated GI wire, green colour.
iii. Where directed by the Landscape Architect the tree may be secured with a second set of loops at a
lower level.
d. Single Staking
Single Staking shall be used for field trees. A single 50mm x 50mm stake is driven vertically into the ground
150mm 250mm away from the tree. The stake is driven down beyond the base of the tree pit and shall be
firm when tested. The top of the stake shall be 100mm below the top of the tree. Ties are to be fastened to
avoid rubbing, chafing or abrasion of the bark.
Page 55 of 60
Landscaping Plantation Works in Mahindra World City, Jaipur
Dead Man Guying shall be used where directed by Landscape Architect. This method of supporting trees is
for use in areas where other conventional methods of support are not feasible. Prior to backfilling two pairs of
preservation treated hardwood planks, minimum 100mm x 50mm, are laid across the top of the rootball at
right angles so that the trunk or stem is enclosed in a square. The timber planks should be positioned as far out
towards the edge of the rootball as possible but kept approximately 100mm in from the edge. Two pairs of
galvanized or stainless steel cables are then led over at right angles to the timber planks and the ends firmly
fastened into the ground at the base of the rootball or preferably fastened to a structure nearby. Twin buckles
at the mid point of each cable are installed to tightened the cables to a suitable degree. Cables should be
tightened only to hold the root-ball firm. Over-tightening may cause the rootball to settle deeper into the
ground than desired. Wherever Dead Man guying is directed refer to the Sub-Contract drawings for
particulars. If Dead Man guying is directed without a drawing the Landscape Contractor is to notify the
Landscape Architect.
f. Climber Wires
Climber wire for training climbing plants against walls shall be approved lightweight PVC coated wire mesh,
fixed at 600mm intervals to GI screw eyes. Maximum mesh coverage shall be 12 Months0mm high x 2400mm
wide. The climbing plants shall be trained through the wire mesh with the shoots directed upwards and tied.
After planting of all plants are to be thoroughly watered using enough water to soak the ground all around the
rootball. After the water has percolated away leaving the surface relatively dry the soil is to be lightly
cultivated to give an even soil tilth.
D. MULCHING
After completion of planting, watering and light cultivation operations, a 50mm deep layer of approved
mulch shall be spread over all planting areas except turf and groundcover beds. Mulching is to be done within
2 days of completing planting and watering in. The cost of mulching is cleared to be included in the unit rates
for planting.
E. FERTILIZING
After planting and before the commencement of maintenance operations all planting areas will be fertilized at
three month intervals. Planting beds and pits shall be fertilized with an approved slow release fertilizer at the
rate of :
Turf areas shall receive area 46.0.0 at a rate of 1kg/100m2. All fertilized areas are to be watered immediately
after fertilizer application
F. DISEASE CONTROL
The Landscape Contractor shall take all necessary precautions to prevent or eradicate any outbreak of disease
or insect attack.
G. PLANTING INTO TURF AREAS
Page 56 of 60
Landscaping Plantation Works in Mahindra World City, Jaipur
Where planting is to be carried out in areas of turf, the turf shall be carefully cut to the size of the tree or shrub
pit, rolled and stored for re-use, being kept moist and in shade. After planting, turf shall be relaid around the
base of the plant. The Landscape Contractor shall replace any turf, which is damaged during planting
operations. Trees in turf areas shall receive a 15cm high plastic trunk collar to protect the trunk from damage
during turf cutting.
H. PROTECTION OF PLANTED AREAS
The Landscape Contractor shall be responsible for protecting all planted areas. If it is necessary for the
Landscape Contractor to erect temporary protective fencing, the Landscape Contractor shall be responsible for
keeping the fencing in position and in good repair until the end of the maintenance period. Fencing proposals
shall be submitted to the Landscape Architect for approval.
i. After planting and prior to the onset of the maintenance period, the Landscape Contractor shall be
responsible for carrying out all necessary measures to ensure that the plant material thrives and
becomes established and that the landscape areas are kept in a clean and tidy condition.
ii. The Landscape Contractor shall allow for carrying out the following maintenance operations when
necessary prior to the onset of the maintenance period, all as specified in section 7 of this specification.
Replacement of dead/missing plants
Grass cutting
Watering
Cultivation and loosening of soil
Weeding
Pruning and clipping
Firming up and adjustment stakes and ties
Eradication of pest or insect attack
Top drawing and mulching
Fertilizing
iii. The Landscape Contractor shall be responsible for replacing any plants which fail to survive as a result
of inadequate maintenance operations, poor workmanship or poor quality of plant material prior to
completion
iv. The Certificate of completion will not be issued until all plans scheduled on the Drawings and Schedule
of Works are installed in a healthy condition in the manner specified.
Page 57 of 60
Landscaping Plantation Works in Mahindra World City, Jaipur
SECTION:6
SPECIFICATION OF PLANTING MATERIALS & BILL
OF QUANTITIES
Page 58 of 60
MahindraWorldCityJaipur
BILLOFQUANTITIESFORPLANTATIONWORKINLIGHTENGINEERINGZONE
No.of
SNO ABBREVIATIONS Description/NameoftheShrubs Plantsin1 Unit PhaseI PhaseII TotalQuantity RateinRs. AmountinRs
Sq.mtArea Quantity Quantity
TOTALAREAINLE(Sq.mt) 153565.43 113775.77
I.SHRUBS PLANTATION
A SOIL PREPARATION Soil Preparation for Shrubs should ideally be CUM 21473.46 15939.45 37415.00
prepared with existing soil+Upto 25-50 mm thk
layer of decomposed farmyard manure mixed
thoroughly with ,sulphur,gypsum,Reagent or any
other additive as required
B MANURING 25-50 mm thk on planting beds prior to mixing CUM 3578.91 2656.58 6240.00
with soil
C PLANTING TotalAreainSq.mt&TotalQtyinNosofPlants
1 ALOVER ALOE VERA 3 SQmt 50.00 43.00 93.00
0.5m overall ht @1m c/c
2 AGAAME AGAVE AMERICANA 3 SQmt 76.00 32.00 108.00
1m ht @4m c/c
3 AGAATT AGAVE ATTENUATA 3 SQmt 25.00 15.00 40.00
0.8m ht @2m c/c
4 ACOCAL ACORUS CALAMUS 3 SQmt 851.20 786.00 1640.00
0.6m O.H @0.6m SPC
5 BOUPIN BOUGAINVILLEA SPECTABILIS PINK 5 SQmt 170.00 170.00
0.6m overall ht @0.6m SPC
6 BOURED BOUGAINVILLEA SPECTABILIS RED 5 SQmt 10660.00 9843.00 20503.00
0.6m overall ht @0.6m SPC
7 BOUWHI BOUGAINVILLEA SPECTABILIS WHITE 5 SQmt 5973.50 5222.50 11196.00
0.6m overall ht @0.6m SPC
8 CLEINE CLERODENDRON INERME 12 SQmt 4904.00 3614.00 8518.00
0.6m overall ht @0.6m SPC
9 CARCAR CARRISSA CARANDUS 6 SQmt 1981.00 1509.00 3490.00
0.6m overall ht @0.6m SPC
10 CAEPULYEL CAESALPINIA PULICHERRIMA YELLOW 3 SQmt 2466.00 1957.00 4423.00
0.6m overall ht @0.6m SPC
11 CAEPULORA CAESALPINIA PULICHERRIMA ORANGE 3 SQmt
0.6m overall ht @0.6m SPC
12 CALPOR CALLIANDRA PORTORICENS 3 SQmt
0.6m overall ht @0.6m SPC
13 CALBRI CALLIANDRA BRIVIPES 3 SQmt 2297.00 2297.00
0.6m overall ht @0.6m SPC
14 CALHAE CALLIANDRA HAEMATOCEPHALUS 5 SQmt
0.6m overall ht @0.6m SPC
15 CYPALT CYPERUS ALTERNIFOLIUS 3 SQmt 578.00 552.00 1130.00
0.6m overall ht @0.6m SPC
16 EUPMIL EUPHORBIA MILLI 12 SQmt 1684.00 945.00 2629.00
0.45m O.H @0.3m SPC
17 EUPTIR EUPHORBIA TIRUCALLI 6 SQmt 5819.00 4592.00 10411.00
0.6m O.H @0.45m SPC
18 EUPNER EUPHORBIA NERIIFOLIA 12 SQmt 2630.00 540.00 3170.00
0.6m O.H @0.45m SPC
19 EUPTRIRUB EUPHORBIA TRIGONA RUBRA 6 SQmt 7240.00 4187.00 11427.00
0.6m O.H @0.45m SPC
20 EUPANT EUPHORBIA ANTIQUARUM 3 SQmt
0.6m overall ht @0.6m SPC
MahindraWorldCityJaipur
BILLOFQUANTITIESFORPLANTATIONWORKINLIGHTENGINEERINGZONE
No.of
SNO ABBREVIATIONS Description/NameoftheShrubs Plantsin1 Unit PhaseI PhaseII TotalQuantity RateinRs. AmountinRs
Sq.mtArea Quantity Quantity
TOTALAREAINLE(Sq.mt) 153565.43 113775.77
21 HOLSAN HOLMCKIOLDIA SANGUINEA 3 SQmt 1688.00 1688.00
0.6m O.H @0.6m SPC
22 JATPAN JATROPA PANDURIFOLIA 3 SQmt 480.00 480.00
0.6m O.H @0.6m SPC
23 KALBLO KALANCHOE BLOSSFELDIANA 12 SQmt
0.45m O.H @0.3m SPC
24 LAWINE LAWSONIA INERMIS 3 SQmt 1004.00 841.00 1845.00
0.6m O.H @0.6m SPC
25 NERRED NERIUM OLEANDER RED 3 SQmt 1845.00 2034.00 3879.00
0.6m O.H @0.6m SPC
26 NERDWF 3 SQmt
27 NERPIN NERIUM OLEANDER PINK 3 SQmt 6216.00 5348.00 11564.00
0.6m O.H @0.6m SPC
28 NERWHI 3 SQmt
29 PENRUERED PENNISETUM REUPELLI RED 6 SQmt 4873.00 4816.00 9689.00
0.45m O.H @0.45m SPC
30 PENRUEGREEN PENNISETUM REUPELLI GREEN 6 SQmt 4303.50 4175.00 8480.00
0.45m O.H @0.45m SPC
31 PIDTIT PEDILIANTHUS TITHYMALOIDES 12 SQmt
0.45m O.H @0.3m SPC
32 SANTRI SANSEIVERA TRIFASCIATA 6 SQmt 1910.00 1850.00 3760.00
0.45m O.H @0.3m SPC
33 THEPER THEVETIA PERUVIANA 3 SQmt 1744.00 1744.00
1m O.H @0.6m SPC
34 VERELO VERNONIA ELEGANS 3 SQmt
0.6m O.H @0.6m SPC
35 YUCGLO YUCCA GLORIOSA 3 SQmt 110.00 230.00 340.00
0.8m O.H @2m c/c
TotalofPartI
II .PRIMARY & SECONDARY TREES
A Soil Preparation Soil Preparation for Tree Pit Size - CUM 570.00
1000mmX1000mmX1500mm ; Soil Preparation &
Mix has 1/3rd local excavated soil+1/3rd imported
garden soil+1/3rd decomposed farmyard
manure,Gypsum,Reagent or any other additived
as required
No.of
SNO ABBREVIATIONS Description/NameoftheShrubs Plantsin1 Unit PhaseI PhaseII TotalQuantity RateinRs. AmountinRs
Sq.mtArea Quantity Quantity
TOTALAREAINLE(Sq.mt) 153565.43 113775.77
TotalofPartII
III .LAWN PLANTATION
1 SOIL PREPARATION Soil Preparation for Shrubs should ideally be CUM 24596.17 18193.28 42790.00
prepared with existing soil+Upto 25 mm thk layer
of decomposed farmyard manure mixed
thoroughly with ,sulphur,gypsum,Reagent or any
other additive as required-
2 MANURING 25-50 mm thk on planting beds prior to mixing CUM 2049.68 1516.11 3570.00
with soil
3 LAWN PLANTATION WITH Thelawnshallbeplantedwithsmoothsurface SQmt 81987.23 60644.27 142640.00
SELECTION-1 formationusingrollerafterpropergrading
TotalofPartIII
IV .ROCKS
1 ROCKS Boulders & Rocks in form of Blocks- Nos. 50.00 75.00 125.00
Transportation from Quarry and placing on the
desired location-Size of Rock/Boulders : 1-1.2
Mtr high and circumference approx-8-12 mtrs
TotalofPartIV
TOTALofPart(I+II+III+IV)
NOTE:
1.WaterShallbeSuppliedbyMWCJwithin1to2KMLeadfromtheSite,TheTenderertobeprovideallmanpower&EquipmentforWateringthePlants
2.CostofPlantingMaterials&Planting30%ofTotalValueTobeprocessedforpaymentafter1monthofPlantingatsite
3.CostofMaintenance70%ofTotalValuefor12MonthsMaintenancestartfromthedateofcertification
4.PeriodofCompletion3Months+12monthsmaintenancepaybaleasperabove
MahindraWorldCityJaipur
BILLOFQUANTITIESFORPLANTATIONWORKINHANDICRAFTZONE
No.of
SNO ABBREVIATIONS Description/NameoftheShrubs Plantsin1 Unit PhaseI PhaseII TotalQuantity RateinRs. AmountinRs
Sq.mtArea Quantity Quantity
TOTALAREAINHC(Sq.mt) 200611.00 26518.00
I.SHRUBS PLANTATION
A SOIL PREPARATION Soil Preparation for Shrubs should ideally be CUM 14682.00 6701.40 21390.00
prepared with existing soil+Upto 25-50 mm thk
layer of decomposed farmyard manure mixed
thoroughly with ,sulphur,gypsum,Reagent or any
other additive as required
B MANURING 25-50 mm thk on planting beds prior to mixing CUM 2615.13 1116.90 3740.00
with soil
C PLANTING TotalAreainSq.mt&TotalQtyinNosofPlants
1 ALOVER ALOE VERA 3 SQmt
0.5m overall ht @1m c/c
2 AGAAME AGAVE AMERICANA 3 SQmt 32.00 32.00
1m ht @4m c/c
3 AGAATT AGAVE ATTENUATA 3 SQmt 48.00 48.00
0.8m ht @2m c/c
4 ACOCAL ACORUS CALAMUS 3 SQmt 721.00 841.00 1562.00
0.6m O.H @0.6m SPC
5 BOUPIN BOUGAINVILLEA SPECTABILIS PINK 5 SQmt 1434.00 1434.00
0.6m overall ht @0.6m SPC
6 BOURED BOUGAINVILLEA SPECTABILIS RED 5 SQmt
0.6m overall ht @0.6m SPC
7 BOUWHI BOUGAINVILLEA SPECTABILIS WHITE 5 SQmt 3625.00 2013.00 5638.00
0.6m overall ht @0.6m SPC
8 CLEINE CLERODENDRON INERME 12 SQmt 7091.00 7091.00
0.6m overall ht @0.6m SPC
9 CARCAR CARRISSA CARANDUS 6 SQmt 755.00 755.00
0.6m overall ht @0.6m SPC
10 CAEPULYEL CAESALPINIA PULICHERRIMA YELLOW 3 SQmt 2268.00 2268.00
0.6m overall ht @0.6m SPC
11 CAEPULORA CAESALPINIA PULICHERRIMA ORANGE 3 SQmt
0.6m overall ht @0.6m SPC
12 CALPOR CALLIANDRA PORTORICENS 3 SQmt
0.6m overall ht @0.6m SPC
13 CALBRI CALLIANDRA BRIVIPES 3 SQmt 8314.00 8314.00
0.6m overall ht @0.6m SPC
14 CALHAE CALLIANDRA HAEMATOCEPHALUS 5 SQmt 7207.00 7207.00
0.6m overall ht @0.6m SPC
15 CYPALT CYPERUS ALTERNIFOLIUS 3 SQmt 526.00 552.00 1078.00
0.6m overall ht @0.6m SPC
16 EUPMIL EUPHORBIA MILLI 12 SQmt
0.45m O.H @0.3m SPC
17 EUPTIR EUPHORBIA TIRUCALLI 6 SQmt 3426.00 3426.00
0.6m O.H @0.45m SPC
18 EUPNER EUPHORBIA NERIIFOLIA 12 SQmt
0.6m O.H @0.45m SPC
19 EUPTRIRUB EUPHORBIA TRIGONA RUBRA 6 SQmt
0.6m O.H @0.45m SPC
20 EUPANT EUPHORBIA ANTIQUARUM 3 SQmt 2996.00 2996.00
0.6m overall ht @0.6m SPC
MahindraWorldCityJaipur
BILLOFQUANTITIESFORPLANTATIONWORKINHANDICRAFTZONE
No.of
SNO ABBREVIATIONS Description/NameoftheShrubs Plantsin1 Unit PhaseI PhaseII TotalQuantity RateinRs. AmountinRs
Sq.mtArea Quantity Quantity
TOTALAREAINHC(Sq.mt) 200611.00 26518.00
21 HOLSAN HOLMCKIOLDIA SANGUINEA 3 SQmt
0.6m O.H @0.6m SPC
22 JATPAN JATROPA PANDURIFOLIA 3 SQmt 2621.00 2621.00
0.6m O.H @0.6m SPC
23 KALBLO KALANCHOE BLOSSFELDIANA 12 SQmt 1431.00 1431.00
0.45m O.H @0.3m SPC
24 LAWINE LAWSONIA INERMIS 3 SQmt
0.6m O.H @0.6m SPC
25 NERRED NERIUM OLEANDER RED 3 SQmt 2177.00 1272.00 3449.00
0.6m O.H @0.6m SPC
26 NERDWF 3 SQmt
27 NERPIN NERIUM OLEANDER PINK 3 SQmt 3528.00 1848.00 5376.00
0.6m O.H @0.6m SPC
28 NERWHI 3 SQmt
29 PENRUERED PENNISETUM REUPELLI RED 6 SQmt 2878.00 838.00 3716.00
0.45m O.H @0.45m SPC
30 PENRUEGREEN PENNISETUM REUPELLI GREEN 6 SQmt 2858.00 1553.00 4411.00
0.45m O.H @0.45m SPC
31 PIDTIT PEDILIANTHUS TITHYMALOIDES 12 SQmt 948.00 948.00
0.45m O.H @0.3m SPC
32 SANTRI SANSEIVERA TRIFASCIATA 6 SQmt 1070.00 1292.00 2362.00
0.45m O.H @0.3m SPC
33 THEPER THEVETIA PERUVIANA 3 SQmt 8523.00 8523.00
1m O.H @0.6m SPC
34 VERELO VERNONIA ELEGANS 3 SQmt
0.6m O.H @0.6m SPC
35 YUCGLO YUCCA GLORIOSA 3 SQmt 120.00 120.00
0.8m O.H @2m c/c
TotalofPartI
II .PRIMARY & SECONDARY TREES
A Soil Preparation Soil Preparation for Tree Pit Size - CUM 570.00
1000mmX1000mmX1500mm ; Soil Preparation &
Mix has 1/3rd local excavated soil+1/3rd imported
garden soil+1/3rd decomposed farmyard
manure,Gypsum,Reagent or any other additived
as required
No.of
SNO ABBREVIATIONS Description/NameoftheShrubs Plantsin1 Unit PhaseI PhaseII TotalQuantity RateinRs. AmountinRs
Sq.mtArea Quantity Quantity
TOTALAREAINHC(Sq.mt) 200611.00 26518.00
TotalofPartII
III .LAWN PLANTATION
1 SOIL PREPARATION Soil Preparation for Shrubs should ideally be CUM 40804.20 40805.00
prepared with existing soil+Upto 25 mm thk layer
of decomposed farmyard manure mixed
thoroughly with ,sulphur,gypsum,Reagent or any
other additive as required-
2 MANURING 25-50 mm thk on planting beds prior to mixing CUM 3400.35 3410.00
with soil
3 LAWN PLANTATION WITH Thelawnshallbeplantedwithsmoothsurface SQmt 136014.00 16309.00 152323.00
SELECTION-1 formationusingrollerafterpropergrading
TotalofPartIII
IV .ROCKS
1 ROCKS Boulders & Rocks in form of Blocks- Nos. 60.00 60.00 120.00
Transportation from Quarry and placing on the
desired location-Size of Rock/Boulders : 1-1.2
Mtr high and circumference approx-8-12 mtrs
TotalofPartIV
TOTALofPart(I+II+III+IV)
NOTE:
1.WaterShallbeSuppliedbyMWCJwithin1to2KMLeadfromtheSite,TheTenderertobeprovideallmanpower&EquipmentforWateringthePlants
2.CostofPlantingMaterials&Planting30%ofTotalValueTobeprocessedforpaymentafter1monthofPlantingatsite
3.CostofMaintenance70%ofTotalValuefor12MonthsMaintenancestartfromthedateofcertification
4.PeriodofCompletion3Months+12monthsmaintenancepaybaleasperabove
MahindraWorldCityJaipur
BILLOFQUANTITIESFORPLANTATIONWORKINUNNOTIFIEDAREA
No.of
SNO ABBREVIATIONS Description/NameoftheShrubs Plantsin1 Unit PhaseI PhaseII TotalQuantity RateinRs. AmountinRs
Sq.mtArea Quantity Quantity
TOTALAREAINHC(Sq.mt) 200611.00 26518.00
I.SHRUBS PLANTATION
A SOIL PREPARATION Soil Preparation for Shrubs should ideally be CUM 6384.90 2638.05 9025.00
prepared with existing soil+Upto 25-50 mm thk
layer of decomposed farmyard manure mixed
thoroughly with ,sulphur,gypsum,Reagent or any
other additive as required
B MANURING 25-50 mm thk on planting beds prior to mixing CUM 1064.15 439.68 1510.00
with soil
C PLANTING TotalAreainSq.mt&TotalQtyinNosofPlants
1 ALOVER ALOE VERA 3 SQmt
0.5m overall ht @1m c/c
2 AGAAME AGAVE AMERICANA 3 SQmt 24.00 24.00
1m ht @4m c/c
3 AGAATT AGAVE ATTENUATA 3 SQmt 20.00 20.00
0.8m ht @2m c/c
4 ACOCAL ACORUS CALAMUS 3 SQmt 786.00 786.00
0.6m O.H @0.6m SPC
5 BOUPIN BOUGAINVILLEA SPECTABILIS PINK 5 SQmt
0.6m overall ht @0.6m SPC
6 BOURED BOUGAINVILLEA SPECTABILIS RED 5 SQmt
0.6m overall ht @0.6m SPC
7 BOUWHI BOUGAINVILLEA SPECTABILIS WHITE 5 SQmt 1700.00 2012.50 3715.00
0.6m overall ht @0.6m SPC
8 CLEINE CLERODENDRON INERME 12 SQmt 7487.00 7487.00
0.6m overall ht @0.6m SPC
9 CARCAR CARRISSA CARANDUS 6 SQmt 1200.00 1200.00
0.6m overall ht @0.6m SPC
10 CAEPULYEL CAESALPINIA PULICHERRIMA YELLOW 3 SQmt 934.00 934.00
0.6m overall ht @0.6m SPC
11 CAEPULORA CAESALPINIA PULICHERRIMA ORANGE 3 SQmt
0.6m overall ht @0.6m SPC
12 CALPOR CALLIANDRA PORTORICENS 3 SQmt
0.6m overall ht @0.6m SPC
13 CALBRI CALLIANDRA BRIVIPES 3 SQmt
0.6m overall ht @0.6m SPC
14 CALHAE CALLIANDRA HAEMATOCEPHALUS 5 SQmt 1788.00 1788.00
0.6m overall ht @0.6m SPC
15 CYPALT CYPERUS ALTERNIFOLIUS 3 SQmt 552.00 552.00
0.6m overall ht @0.6m SPC
16 EUPMIL EUPHORBIA MILLI 12 SQmt
0.45m O.H @0.3m SPC
17 EUPTIR EUPHORBIA TIRUCALLI 6 SQmt
0.6m O.H @0.45m SPC
18 EUPNER EUPHORBIA NERIIFOLIA 12 SQmt
0.6m O.H @0.45m SPC
19 EUPTRIRUB EUPHORBIA TRIGONA RUBRA 6 SQmt
0.6m O.H @0.45m SPC
20 EUPANT EUPHORBIA ANTIQUARUM 3 SQmt 1712.00 1712.00
0.6m overall ht @0.6m SPC
MahindraWorldCityJaipur
BILLOFQUANTITIESFORPLANTATIONWORKINUNNOTIFIEDAREA
No.of
SNO ABBREVIATIONS Description/NameoftheShrubs Plantsin1 Unit PhaseI PhaseII TotalQuantity RateinRs. AmountinRs
Sq.mtArea Quantity Quantity
TOTALAREAINHC(Sq.mt) 200611.00 26518.00
21 HOLSAN HOLMCKIOLDIA SANGUINEA 3 SQmt
0.6m O.H @0.6m SPC
22 JATPAN JATROPA PANDURIFOLIA 3 SQmt
0.6m O.H @0.6m SPC
23 KALBLO KALANCHOE BLOSSFELDIANA 12 SQmt
0.45m O.H @0.3m SPC
24 LAWINE LAWSONIA INERMIS 3 SQmt
0.6m O.H @0.6m SPC
25 NERRED NERIUM OLEANDER RED 3 SQmt 360.00 1272.00 1632.00
0.6m O.H @0.6m SPC
26 NERDWF 3 SQmt
27 NERPIN NERIUM OLEANDER PINK 3 SQmt 1848.00 1848.00
0.6m O.H @0.6m SPC
28 NERWHI 3 SQmt
29 PENRUERED PENNISETUM REUPELLI RED 6 SQmt 2769.00 790.00 3559.00
0.45m O.H @0.45m SPC
30 PENRUEGREEN PENNISETUM REUPELLI GREEN 6 SQmt 2769.00 1533.00 4302.00
0.45m O.H @0.45m SPC
31 PIDTIT PEDILIANTHUS TITHYMALOIDES 12 SQmt 520.00 520.00
0.45m O.H @0.3m SPC
32 SANTRI SANSEIVERA TRIFASCIATA 6 SQmt
0.45m O.H @0.3m SPC
33 THEPER THEVETIA PERUVIANA 3 SQmt
1m O.H @0.6m SPC
34 VERELO VERNONIA ELEGANS 3 SQmt
0.6m O.H @0.6m SPC
35 YUCGLO YUCCA GLORIOSA 3 SQmt
0.8m O.H @2m c/c
TotalofPartI
II .LAWN PLANTATION
1 SOIL PREPARATION Soil Preparation for Shrubs should ideally be CUM 14624.10 7348.35 40805.00
prepared with existing soil+Upto 25 mm thk layer
of decomposed farmyard manure mixed
thoroughly with ,sulphur,gypsum,Reagent or any
other additive as required-
2 MANURING 25-50 mm thk on planting beds prior to mixing CUM 1218.68 612.36 3410.00
with soil
3 LAWN PLANTATION WITH Thelawnshallbeplantedwithsmoothsurface SQmt 48747.00 24494.50 73420.00
SELECTION-1 formationusingrollerafterpropergrading
TotalofPartII
III .ROCKS
1 ROCKS Boulders & Rocks in form of Blocks- Nos. 20.00 20.00
Transportation from Quarry and placing on the
desired location-Size of Rock/Boulders : 1-1.2
Mtr high and circumference approx-8-12 mtrs
TotalofPartIII
MahindraWorldCityJaipur
BILLOFQUANTITIESFORPLANTATIONWORKINUNNOTIFIEDAREA
No.of
SNO ABBREVIATIONS Description/NameoftheShrubs Plantsin1 Unit PhaseI PhaseII TotalQuantity RateinRs. AmountinRs
Sq.mtArea Quantity Quantity
TOTALAREAINHC(Sq.mt) 200611.00 26518.00
TOTALofPart(I+II+III)
NOTE:
1.WaterShallbeSuppliedbyMWCJwithin1to2KMLeadfromtheSite,TheTenderertobeprovideallmanpower&EquipmentforWateringthePlants
2.CostofPlantingMaterials&Planting30%ofTotalValueTobeprocessedforpaymentafter1monthofPlantingatsite
3.CostofMaintenance70%ofTotalValuefor12MonthsMaintenancestartfromthedateofcertification
4.PeriodofCompletion3Months+12monthsmaintenancepaybaleasperabove
Landscaping Plantation Works in Mahindra World City, Jaipur
SECTION: 7
LANDSCAPE DRAWINGS
Page 59 of 60