Project No. Electrical Maximum Demand Existing Conditions
Project No. Electrical Maximum Demand Existing Conditions
Existing Conditions
Office 14
Car Park 12
Accommodation 120
Total 146
Safety Factor 110%
Car Park
20 m2 400 8000 VA
11.5942029 Amps per Phase
Calculation - Maximum Demand assessed by AS 3000 - Table C1 - Single and Multiple Domestic Electrical Installations
4 4 4 12
A Indoor Lighting 12 Residence 6Amps 18.0 0.8 22.5 3 7.5 7.5 7.5 7.5 7.5 7.5 22.5
B(ii) Socket-outlets 12 Residence NA; unless the installation includes one or more 15A socket outlets other than those provided for by groups C, D, E, F, G, and L
B(iii) Socket-outlets 12 Residence NA; unless the installation includes one or more 20A socket outlets other than those provided for by groups C, D, E, F, G, and L
E Instantaneous water heaters 12 Residence No allowance included, gas 0.0 0.0 0.0 0.0
F Storage water heaters 12 Residence No allowance included 0.0 0.0 0.0 0.0
G Spa and swimming pool heaters 12 Residence No allowance included 0.0 0.0 0.0 0.0
Loading not associated with individual units - connected to each phase (communal lighting, laundry loadings, lifts, motors, etc)
H Communal lighting 12 Residence Allowance 1000W 1000 4.3 0.8 5.4 3 1.8 1.8 1.8 1.8 1.8 1.8 5.4
L Motors 12 Residence NA