0% found this document useful (0 votes)
513 views

Block Programming Lead Lag

1. A pump lead-lag control composite was created in Tridium Niagara AX with control points in a "PumpControl" folder and lead-lag logic in a "LeadLag" folder. 2. Lead-lag logic from the "KitControl" palette was connected to the points using wire links. 3. The "LeadLag" folder was converted to a composite with input and output slots added and reordered, and the points were linked to the composite. 4. Testing verified normal and failure operations by changing point values and verifying output responses. An extra credit task was to find a "bug" in the lead-lag operation.

Uploaded by

Bruce Nguyễn
Copyright
© © All Rights Reserved
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
513 views

Block Programming Lead Lag

1. A pump lead-lag control composite was created in Tridium Niagara AX with control points in a "PumpControl" folder and lead-lag logic in a "LeadLag" folder. 2. Lead-lag logic from the "KitControl" palette was connected to the points using wire links. 3. The "LeadLag" folder was converted to a composite with input and output slots added and reordered, and the points were linked to the composite. 4. Testing verified normal and failure operations by changing point values and verifying output responses. An extra credit task was to find a "bug" in the lead-lag operation.

Uploaded by

Bruce Nguyễn
Copyright
© © All Rights Reserved
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 2

Create a Control Composite (Tridium Niagara AX)

Goal: Create a Pump Lead-Lag Control Composite.

1. Create Control Points


1. Create a folder called 'PumpControl' (R.C. > New)
2. In the 'PumpControl' wire sheets add the Boolean Writable points (R.C. > New).
3. Create a folder called 'LeadLag'.

4. Set the Facets of the points.

2. Create Logic
1. Copy all the (8) points and paste them in the 'LeadLag' folder..
2. From the 'KitControl' palette add all the Lead-Lag logic to the wiresheet. Set the BooleanDelay time.
3. Connect all the logic with wire links.
Note: having internal writable points is not required, just makes for convenient logic checkout.

tridiumtech88@gmail.com
Creating a Control Composite Cont.)

3. Composite Editor
1. Return to the 'Pump Control' folder.
2. Right click the 'LeadLag' folder and select 'Composite'.

3. Open the main folder node in Composite Editor.


4. Open the appropriate point or control object.
5. Select the appropriate slot.
6. Click "+ Add".
7. Rename the Slot (use suffix "_in" for inputs and "_out" for outputs).

8. Reorder the slot positions in the final composite object (outputs on top). (R.C. the folder > 'Reorder').
9. Connect the links from the points to the new LeadLag composite.
Note: composite input slots will have link hubs on the right and output slots will have hubs on the left (dont delete the hubs).

4. Testing
1) Preset the inputs: Enable = 'Disable', Toggle = 'OUT1_Lead, Status1 = OFF, Status2 = ON.
2) Set the Enable = 'Enable'.
3) Set the Status1 = 'Running'.
4) Verify the Outputs: OUT1=ON, OUT2=OFF, Fail1=Normal, Fail2=Normal.
5) Set Status1 = 'OFF'. Verify after 10 sec: OUT1=ON, OUT2=ON, Fail1=Alarm, Fail2=Normal
6) Set Status1 = 'Running'. Should be back to normal operation.
7) Switch the Toggle to OUT2_Lead. Modify Status1 = 'OFF' & Status2 = 'Runnning'.
8) Verify the Outputs: OUT1=OFF, OUT2=ON, Fail1=Normal, Fail2=Normal.
9) Test Fail2.

Extra Credit
There is a 'bug' in the Lead-Lag operation (hint: 'double-trouble').