Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 1
1. Name the two types of pressure transmitters installed on the light and heavy filtering skids.
2. Differentiate between the two types of pressure transmitters mentioned above.
3. List 2 preventive maintenance tasks that can be carried out on the pressure transmitters. 4. With the aid of illustrations, describe the calibration and setup procedures carried out on the pressure transmitters mentioned above. 5. With the aid of illustrations, explain the calibration procedure of the flow control valve installed at the heavy oil filtering skid. 6. State 2 preventive maintenance tasks that can be carried out on the flow control valve mentioned above. 7. Explain the operation of the oval gear flow meter installed at the heavy oil filtering skid 8. Mention the type of output signal picked up from the flow meter mentioned above# 9. Name 2 accessories used with the oval gear flow meter installed at the heavy oil filtering skid. 10. List the configuration steps needed to operate the temperature transmitter installed at the light oil filtering skid. 11. List the configuration steps needed to operate the level switch at the vanadium inhibitor. 12. Outline the setup procedures needed to operate the flow meter installed at the vanadium inhibitor. 13. State 2 preventive measures carried out on the level switch mentioned above. 14. State 2 preventive maintenance procedures carried out on the flow meter installed at the vanadium inhibitor. 15. Outline the configuration procedures carried out on the flow meter installed at the water injection skid. 16. Mention 2 preventive maintenance procedures carried out on the flow meter mentioned above.