API 510 Data Sheets
API 510 Data Sheets
)
API
510
Scope
(Alteration,
Inspection,
Repair,
Rerate)
AIRR
JUIC
API
520
Repair
Organization
(
ASME
stamp
holder,
authorized
by
Jurisdiction,
Owner,
Contractor)
A JOC
TIE
How
to
determine
Corrosion
Rate
for
New
Service
or
Change
in
Service
(Same
or
Similar
Service,
Owner's
Experience,
Published
Data,
or
Inspect
in
1000
hrs)
SOPI
API 579
API 580
API 660
API 2201
ASME Section V
Alternative
evaluation
for
pits
and
LTA's
ASME Section IX
ASNT SNT-TC-1A
-15 to +30%
0.35%
20%
70%
Center portion of head when evaluating a LTA using the spherical formula
80%
Less than 0F
Welding
-
Base
metal
temp
when
pre-heat
to
60F
is
recommended?
0-32 F
Corrosion - CUI affects Carbon Steel & low alloy (temp range)?
10-350 F
25F
40-125 F
140F
140-400 F
Corrosion
-
temperature
when
high
strength
caustic
causes
serious
corrosion
in
CS
and
300
SS
+/200F
212-250 F
Welding
-
minimum
pre-heat
temperature,
when
pre-heat
is
substituted
for
PWHT
300F
Welding
-
minimum
pre-heat
temperature,
when
a
local
PWHT
is
used
in
lieu
of
a
full
encirclement
PWHT
300F
500F
650-1100 F
Inspection
-
if
vessel
operating
temp
is
above
this
consult
a
Corrosion
Specialist
when
developing
an
inspection
plan
Corrosion - if operating temp is above this, check for Creep in Cat Reformer equipment
1000F
1100F
Testing - minimum base metal temp during hydro testing vessels < or = 2" thick
MDMT + 10F
Testing - minimum base metal temp during hydrotesting vessels > 2" thick
MDMT + 30F
Manufacturer Recommend
API 510 Data Sheets (misc. other)
Define
-
repair
(key
words)
Restore - suitable
Physical change
Probability consequence
Top
Defect
Define - A flaw that may or may not exceed the acceptance criteria
Imperfection
RT-1, RT-2
RT-3
Type 1
Design
-
weld
type
-
butt
single
welded
with
backing
Type 2
Type 3
Lethal
MAWP
HT
UM
UV
NDE- number of CML's to obtain thickness readings during inspection (key word)
Representative
NDE- number of Nozzles to obtain thickness readings during inspection (key word)
Representative
B
NDE
-
lead
letter
used
during
RT
to
indicate
film-side
IQI
NDE - hole size that must be visible in RT when using a hole-type IQI
2T
Ir 192, Co 60
Upright
Performance
Essential
3 to 1
6G
GMAW - SC
2T
WPS
PQR
WPQ
Document that must be prepared and maintained for each vessel and relief device
Inspection plan
Manual that must be prepared and maintained by each Owner/User that uses API 510
Two documents that are needed by each repair organization that repairs relief devices
Design pressures within scope of ASME Section VIII & API 510
Design pressures of non-fired boilers (waste heat boilers) that require Full RT
1.5 x P test
Preferred
range
of
pressure
gauge
used
during
a
test
2.0 x P test
4.0 x P test
Low-chromes
300 SS
300 SS
Common
material
with
an
endurance
limit
(fatigue
cracking
cannot
occur
below
this
stress
level)
Carbon steel
Stainless steel
P1 & P3
P-numbers
of
base
metal
that
should
be
examined
for
delayed
cracking
after
repairs
to
SS
cladding
0"
3 light beads/bands
1/8"
Maximum
distance
beyond
the
area
to
be
examined
to
clean
a
part
when
performing
a
MT
examination?
1"
Maximum
distance
beyond
the
area
to
be
examined
to
clean
a
part
when
performing
a
PT
examination?
1"
1"
> 1 1/2"
> 1 1/2"
2"
Distance
beyond
weld
that
preheat
must
be
maintained
when
performing
preheat
in
lieu
of
PWHT?
< 6"
Minimum
length
to
RT/UT
when
qualifying
a
welder
with
test
coupon
or
1st
production
weld?
6"
Minimum length of RT/UT when qualifying a welding operator with a test coupon?
6"
6"
6-24"
7 in. squared
3'
3'
5'
50'
1/2 t-min