6 Hydraulic Cylinder Unit PDF
6 Hydraulic Cylinder Unit PDF
Forr training
MAN Diesel & Turbo Author Current topic 00.00.2012 < 1 >
purposes only
Forr training
H d
Hydraulic
li Cylinder
C li d Unit.
U it
2) Components:
FIVA
Accumulators
Cylinder Lubricator
3) Highpressure Pipes
MAN Diesel & Turbo Author Current topic 00.00.2012 < 2 >
purposes only
Forr training
H d
Hydraulic
li Cylinder
C li d Unit,
U it HCU.
HCU
Accumulator
Exhaust Valve
Actuator
Fuel Oil
Pressure
booster
FIVA valve
Ball Valve
Distribution Block
Cylinder Lubricator
MAN Diesel & Turbo Author Current topic 00.00.2012 < 3 >
purposes only
Forr training Hydraulic Cylinder Unit,
HCU Di
Distribution
t ib ti Block.
Bl k
MAN Diesel & Turbo Author Current topic 00.00.2012 < 4 >
purposes only
Forr training
Hydraulic Cylinder Unit, HCU
L70ME
Distribution block
MAN Diesel & Turbo Author Current topic 00.00.2012 < 5 >
purposes only
Forr training
Hydraulic Cylinder Unit,
HCU Hydraulic Diagram.
MAN Diesel & Turbo Author Current topic 00.00.2012 < 7 >
purposes only
Forr training
Hydraulic Cylinder Unit,
Hydraulic Diagram 300 bar
bar.
MAN Diesel & Turbo Author Current topic 00.00.2012 < 8 >
purposes only
Forr training
Hydraulic Cylinder Unit,
HCU Valves.
Valves
I t ti
Instructions
Valve No.
MAN Diesel & Turbo Author Current topic 00.00.2012 < 9 >
purposes only
Forr training
Hydraulic Cylinder Unit,
HCU Cautions
CAUTION CAUTION
HCU OVERHAULING LUBRICATION OVERHAULING
0. CHECK GAUGE WORKS! 0. CHECK GAUGE WORKS!
1. CLOSE VALVE NO. 420, 531 1. CLOSE VALVE NO. 560
2. OPEN VALVE NO. 421, 405, 406 2. CHECK PRESSURE AT MEASURING
3.CHECK PRESSURE AT MEASURING POINT 565
POINT 455.
455 3 IF PRESSURE IS PRESENT,
3. PRESENT PRESS
WARNING NEVER OPEN VALVE THE PRE-LUB BOTTON AT THE HMI
420 WHEN SYSTEM PRESSURE IS PANEL.
ON
MAN Diesel & Turbo Author Current topic 00.00.2012 < 10 >
purposes only
Forr training
FIVA Valves
-20 0 20 40 60 80 100 120 140 160 180 200 220 240 260 280 300 320 340 360
MAN Diesel & Turbo Author Current topic 00.00.2012 < 12 >
purposes only
Forr training
Pilot Valve
Control
Piston
Main Spool
MAN Diesel & Turbo Author Current topic 00.00.2012 < 13 >
purposes only
Forr training
MAN Diesel & Turbo Author Current topic 00.00.2012 < 14 >
purposes only
Forr training
Accumulator
Diaphrame Working Principle.
Diaphrame, Principle
MAN Diesel & Turbo Author Current topic 00.00.2012 < 15 >
purposes only
Forr training
Accumulator
Nit
Nitrogen Ch
Check,
k SL06
SL06-469.
469
The accumulator
Th l t charge
h pressure should
h ld bbe
checked within the first week of service.
Next check should be made around 4
months
th llater,
t ffollowed
ll db
by checking
h ki every 6
months.
A minor leakage from the accumulators is
unavoidable and service experience shows
unavoidable,
that a pressure drop in the range of 2-5
bar/month is to be expected.
The charge pressure is dependent on
working servo oil pressure as well as the
accumulator temperature.
For the 200 bar HPS accumulator charging
pressures are:
95 bar +0/-5 @ 20C
105 bar +0/-5 @ 50C
MAN Diesel & Turbo Author Current topic 00.00.2012 < 16 >
purposes only
Forr training
MAN Diesel & Turbo Author Current topic 00.00.2012 < 17 >
purposes only
Forr training
Cylinder Liners.
Liners
Injection nozzle
Injection nozzle
with non-return Cylinder liner
valve
MAN Diesel & Turbo 3331050/20031212 (CBO/4100) Author Current topic 00.00.2012 < 18 >
purposes only
Forr training
ME Cylinder Lubricator.
Lubricator
Cylinder lub. Inductive proximity sensor
oil inlet for feed-back signal to
control of piston movement
Signal for
lubrication from
controller
Level sensor for
cylinder oil in lubricator
Outlets for
cylinder liner Injection plunger
lub oil
lub.
injectors
Spacer for
basic setting of
pump
stroke
Drain 200 bar system oil supply
Non-return valve Stroke oil
adjusting outlet Actuator
screw piston
Sealingring
MAN Diesel & Turbo 3331377/20041021 (2200/OZS) Author Current topic 00.00.2012 < 19 >
purposes only
Forr training
Cylinder Lubricator
Lubricator.
Distribution Block
Cylinder Lubricator
MAN Diesel & Turbo Author Current topic 00.00.2012 < 20 >
purposes only
Forr training
1
1. To create a hydrodynamic oil film separating the piston rings from the liner
The optimum is kept safely down to a feedrate of 0.60 g/kWh.
All approved cylinder oils fullfils the requirements, even at a feed rate as low as 0.60 g/kWh.
MAN Diesel & Turbo Author Current topic 00.00.2012 < 21 >
oses only
Forr training
Optimising the Cylinder Condition.
Lubrication versus Maintenance
Maintenance.
purpo
ooilstarvation
0,9
brication)
0,8
(boundarylub
Highweardueto
0,7
m/1000h)
0,6
0,4
0,3
0.10 mm/1000h
0,2
0 05 mm/1000h
0.05
0
03
0,3 04
0,4 05
0,5 06
0,6 07
0,7 08
0,8 09
0,9 1 11
1,1 12
1,2 13
1,3 14
1,4 15
1,5 16
1,6
MAN Diesel & Turbo Author Current topic 00.00.2012 < 22 >
purposes only
Forr training
H
How tto d
determine
t i ACC ffactor.
t
MAN Diesel & Turbo Author Current topic 00.00.2012 < 23 >
purposes only
Forr training
Sulphur % in relation to BN number.
SL2013 571
SL2013-571
Fuel type
yp BN
Distillate and LNG <= 40
Low Sulphur residual fuel 40 - 60
High Sulphur residual fuel Mk 6 - 8 55 - 100
High Sulphur residual fuel Mk 9 or newer 70 - 100
MAN Diesel & Turbo Author Current topic 00.00.2012 < 24 >
purposes only
Forr training
3 % S
S. BN 70 3
3%S
S. BN 40
A A
A A
A
A
A
A
A
A A
A A A
A A A
A
0.6
0 6 g/kWh A A A
0.6 g/kWh
F = 70/40 =1.75
MAN Diesel & Turbo Author Current topic 00.00.2012 < 25 >
purposes only
Forr training
ACC Dosages calculated from different Feedrate
Factors (SL2013-571,
(SL2013 571 Min Feedrate =0
=0.6
6 g/kWh)
MAN Diesel & Turbo Author Current topic 00.00.2012 < 26 >
purposes only
Forr training
MAN Diesel & Turbo Author Current topic 00.00.2012 < 27 >
purposes only
Forr training
1: ACC familiarsation.
Adjust according to piston ring and liner wear.
wear
Use oil analysis to evaluate.
.
MAN Diesel & Turbo Author Current topic 00.00.2012 < 28 >
purposes only
Forr training
CPR-CL
CPR CL
MAN Diesel & Turbo Author Current topic 00.00.2012 < 29 >
purposes only
Forr training
Piston ring wear.
SL2013 571
SL2013-571.
CPR-POP CPR-CL
MAN Diesel & Turbo Author Current topic 00.00.2012 < 30 >
purposes only
Forr training
Analysis Safe Area.
SL 2013-571.
2013 571
MAN Diesel & Turbo Author Current topic 00.00.2012 < 31 >
Graph to find the perfect Feed Rate
purposes only
Forr training
g
setting.
SL 2013-571
MAN Diesel & Turbo Author Current topic 00.00.2012 < 32 >
purposes only
Forr training
Running in SL2013-571.
Breaking in.
in
MAN Diesel & Turbo Author Current topic 00.00.2012 < 33 >
purposes only
Forr training
ACC Running in schedule.
SL 2013-571.
2013 571
MAN Diesel & Turbo Author Current topic 00.00.2012 < 34 >
purposes only
Forr training
MAN Diesel & Turbo Author Current topic 00.00.2012 < 35 >
purposes only
Forr training
Correction Tables
Tables.
Runningg with Feed Rate Factor Runningg with Feed Rate Factor
0.20g/kWhxS% (Normal Running) 0.23g/kWhxS% (Running In)
[Correction factor: 0.20/0.26=0.77] [Correction factor: 0.23/0.26=0.88]
When operating the
Lubrication from MOP
without updated software,
the system will not allow
the Feed Rate Factor to be
adjusted below
0.25g/kWhxS%.
To ensure correct lubrication
oil dossage correspondig
to Feed Rate Factor
g 0,20
settings , or
0,23g/kWhxS, the factor
has to be adjusted to
g
0.26g/kWhxS% in the
MOP and correction on the
sulphur content in the fuel
oil (S%) has to be done
according to the
Correction Tables.
MAN Diesel & Turbo Author Current topic 00.00.2012 < 36 >
purposes only
Forr training
MAN Diesel & Turbo Author Current topic 00.00.2012 < 37 >
purposes only
Forr training
MAN Diesel & Turbo Author Current topic 00.00.2012 < 38 >
purposes only
Forr training
HCUs Mounted on a Common Base Plate.
Double wall
high pressure
pipe
High pressure oil inlet
from the HPS
MAN Diesel & Turbo Author Current topic 00.00.2012 < 39 >
oses only
Forr training
MAN Diesel & Turbo Author Current topic 00.00.2012 < 40 >
purposes only
Forr training
HCU Line,
Line 300 Bar
Bar.
MAN Diesel & Turbo Author Current topic 00.00.2012 < 41 >
purposes only
Forr training
Flange
Fl
Outerpipe
Sealingrings
Screws
InnerPipe
Sealing
rings
SlideBearings
MAN Diesel & Turbo Author Current topic 00.00.2012 < 42 >
purposes only
Forr training
MAN Diesel & Turbo 2500/KNB April 2003. Author Current topic 00.00.2012 < 43 >
purposes only
Forr training
Leak Detection
1. CLOSE the valve 430 at the last but one Hydraulic Cylinder Unit.
2. OPEN the valve 431 at the last HCU to decrease the p pressure in the space
p
between the inner and outer pipe.
3. CLOSE the valve 431 at the last HCU again.
4. Check the pressure increase in the space between at pos. 435, at the last HCU
5
5. If the pressure increases to system pressure level
level, the leakage has been found
found.
6. When the leakage has been eliminated, bring all the valves to their normal
position.
MAN Diesel & Turbo Author Current topic 00.00.2012 < 44 >
purposes only
Forr training
Disclaimer
MAN Diesel & Turbo Author Current topic 00.00.2012 < 45 >
purposes only
Forr training
Learning Objectives
Objective 1
Objective 2
Objective
j 3
.
.
MAN Diesel & Turbo Author Current topic 00.00.2012 < 46 >
purposes only
Forr training
Qualification
Qualification 1
Qualification 2
Qualification 3
...
...
MAN Diesel & Turbo Author Current topic 00.00.2012 < 47 >
purposes only
Forr training
Item 1
Item 2
Item 3
.
MAN Diesel & Turbo Author Current topic 00.00.2012 < 48 >
purposes only
Forr training
Source Information
Release History
MAN Diesel & Turbo Author Current topic 00.00.2012 < 49 >