IEC 61850 Communication System Design: Technology and Solutions
IEC 61850 Communication System Design: Technology and Solutions
IEC 61850
Communication System
Design
© ABB University Switzerland
UTA-BTS / F1 (22)
ABB
Contents
l Process bus
© ABB University Switzerland
ABB
Stack properties
r IEC 61850-8-1 maps the application layer onto
l Electrical or optical physical layer
l Ethernet as link layer
l MMS/TCP/IP for vertical data (monitoring, supervision,
commands)
– Networking, routing (IP)
– Secure end-end transport (TCP)
l GOOSE (GSSE) for real time event data
PTU-BTS / CHP143-S_11_CommArch.ppt / F3 (22)
ABB
Performance classes – binary data, RMS values
Message P1 (ms) P2/3 (ms) Remarks
type Distribution Transmission
demanding function
as trips
• IEC 60834: trip command between protection functions need maximal 20 ms
© ABB University Switzerland
ABB
© ABB University Switzerland
PTU-BTS / CHP143-S_11_CommArch.ppt / F5 (22)
Performance classes – raw analog data
ABB
Performance classes - measurement
PTU-BTS / CHP143-S_11_CommArch.ppt / F6 (22)
© ABB University Switzerland
ABB
Performance issues - experiences
r 10 MB/s with Hub is not sufficient (and does no longer exist)
l Collisions reduce the usable bandwidth to 2 MB/s
l 10 MB/s with switch might be acceptable for vertical transfer +
GOOSE for interlocking (P1)
r For sampled values >= 100 MB/s + Switch is a must.
l Accurate time synch needs HW support also in switches
l Even with this data transfer across several bays needs careful
analysis and communication system design
l Protection redundancy is best solved by completely separate
PTU-BTS / CHP143-S_11_CommArch.ppt / F7 (22)
l
switches should be used.
l Experience: with switches (and optical cables in noisy environment)
not more than 2 consecutive GOOSE messages are lost.
ABB
Data Integrity Classes
ABB
Time synch accuracy classes
PTU-BTS / CHP143-S_11_CommArch.ppt / F9 (22)
ABB
System architectures – tree topology example
• Distances between
NCC NCC
buildings
• Network load
300m
SteadyState: 0.1 Mbit/s optical
Burst: 29 Mbit/s
PTU-BTS / CHP143-S_11_CommArch.ppt / F10 (22)
electrical
1 2 11
110 IEDs
ABB
System architectures – ring topology example
• Distances between
buildings NCC NCC
• Network load
electrical
SteadyState: 0.3 Mbit/s
Burst: 81 Mbit/s
8 ports Switch 8 ports Switch
Steady State:1.3Mbit/s
300m Steady State:1.3Mbit/s Burst: 322 Mbit/s
Burst: 322 Mbit/s optical
PTU-BTS / CHP143-S_11_CommArch.ppt / F11 (22)
Burst: 3 Mbit/s
electrical
1 2 11
Control Control Control Control Control Control Control Control Control
IED IED IED
200m IED IED IED
200m
.. IED IED IED
© ABB University Switzerland
.....
110 IEDs
ABB
Architecture comparison
Criteria Tree Ring Remark
ABB
•In a switch yard with functional redundancy the communication architecture
should follow this redundancy.
Architecture recommendations
availability
r For big systems a worst case response time and throughput
analysis is recommended
ABB
Base Topology on Process bus level
IEC 61850-9
serial unidirectional point-to-point
PTU-BTS / CHP143-S_11_CommArch.ppt / F14 (22)
or bidirectional Bus-Connection
Ethernet
Controller
Proprietary
Merging Unit
© ABB University Switzerland
Interfaces
ABB
IEC61850-Approach: Logical Nodes and Devices
Line
protection
IEC 61850-9
Logical Device
“Merging Unit”
LNPCTR
LN PCTR
LN TVTR
PTU-BTS / CHP143-S_11_CommArch.ppt / F15 (22)
LNPCTR
LN PCTR
LN TCTR
© ABB University Switzerland
ABB
System architecture with 61850-9 Links
NCC Operator Engineering
Router
IEC61850-8
LAN-Switch Station bus
PTU-BTS / CHP143-S_11_CommArch.ppt / F16 (22)
IEC61850-9 IEC61850-9
© ABB University Switzerland
Links Links
ABB
IEC61850-9: Extension to Bus system
IEC 61850-8/9 Bus
Line
protection
Logical Device
“Breaker IED”
LNPCTR
PCTR
PTU-BTS / CHP143-S_11_CommArch.ppt / F17 (22)
LN
LN TVTR Logical Device
“Breaker IED”
LNPCTR
LN PCTR LNPCTR
PCTR
LN TCTR LN
LN XCBR
© ABB University Switzerland
ABB
System architecture with 61850-9 Busses
NCC Operator Engineering
Router
IEC61850-8
LAN-Switch Station bus
PTU-BTS / CHP143-S_11_CommArch.ppt / F18 (22)
IEC61850-9 IEC61850-9
Bus Bus
© ABB University Switzerland
ABB
Ctrl. & Prot. & Metering with IEC 61850-9
Feldschrank LAN Switch
von Merging Units in anderen Feldern
Steuergerät
„Typ IEC“
IEC61850-9
Schutzrelais
„Typ IEC“
PTU-BTS / CHP143-S_11_CommArch.ppt / F19 (22)
U-/I-Sensor
Merging Unit Schutzrelais
„Ctrl. & Prot.“ „Typ IEC“
PISA
© ABB University Switzerland
ABB-Interface
ABB
System architecture with 61850-9 Bus redundancy
NCC Operator Engineering
Router
IEC61850-8
LAN-Switch Station bus
PTU-BTS / CHP143-S_11_CommArch.ppt / F20 (22)
IEC61850-9 Busses
© ABB University Switzerland
Steuergerät
„Typ IEC“
PISA
PISA
Merging Unit
„Ctrl. & Prot.“ Schutzrelais
„Typ IEC“
PTU-BTS / CHP143-S_11_CommArch.ppt / F21 (22)
U-/I-Sensor
Merging Unit Schutzrelais
„Ctrl. & Prot.“ „Typ IEC“
PISA
© ABB University Switzerland
ABB-Interface
ABB
Flat communication architecture
NCC Operator Engineering
Router Problems:
• Performance
• Availability
IEC61850-8
LAN-Switch Station bus
PTU-BTS / CHP143-S_11_CommArch.ppt / F22 (22)
Router
IEC61850-8
LAN-Switch Station bus
PTU-BTS / CHP143-S_11_CommArch.ppt / F23 (22)
IEC61850-9
Bus
© ABB University Switzerland