Short Circuit Study
Short Circuit Study
Description: Stage I
Complete a short-circuit study for 5 bus test system described in the Appendix I. The system Z
matrices are given. Consider two types of faults:
• Single-phase-ground (A phase), fault resistance Rf = 0.10 p.u.
• Three-phase-ground fault, fault resistance Rf = 0 p.u.
Assuming that the fault occurs at each non-source system bus (one at a time), calculate:
• Fault current (all phases)
• All bus voltages (all phases)
• All branch currents (all phases)
Stage II
Develop a computer software for completing a short-circuit study for IEEE-14 bus system described
in the Appendix II. The system data are attached. Either Z-bus or Y-bus method can be used.
Consider two types of faults:
• Single-phase-ground (A phase), fault resistance Rf=0 p.u.
• Three-phase-ground fault, fault resistance Rf=0 p.u.
Assuming that the fault occurs at each non-source system bus (one at a time), calculate:
• Fault current (all phases)
• All bus voltages (all phases)
• All branch currents (all phases)
***Note: Express all results in polar form. The results in rectangular form will not be acceptable.
Programming
Consideration: - Matlab 5.3., MathWorks should be used for programming.
- Procedural style of programming should be used (do not write spaghetti code).
Plagiarism: First page in the report should contain signed and dated statement that confirms that all the work in the
report is completed solely by the respective individual.
Extra Credit: 5 pts. for completing the stage two of the project using both Z-bus and Y-bus method.
Note that the method of building Z-bus or Y-bus matrices is important. Inversion of Y-bus matrix
obtained by Y-bus method should yield the same Z-bus matrix as obtained by Z-bus method.
1 2 3
3 4
4 5 5
1 2
The system sequence matrices are also given (all impedances are in p.u.):
j 0.1274 j 0.1061 j 0.0981
Z 1 = j 0.1061 j 0.1345 j 0.1151 Positive-Sequence matrix
j 0.0981 j 0.1151 j 0.1215
Notes:
Assume that pre-fault voltage is flat, Vf = 1. All given impedances are in p.u.
Buses 4 and 5 are source buses and they have been eliminated from the system matrices.
ELEN 666
Computer Program for Short-Circuit Studies
Appendix II
INPUT DATA FOR THE IEEE 14-BUS TEST SYSTEM
BUS BUS
12 18 13
LINE 19
LINE
BUS
10 14
LINE 11
LINE
BUS BUS
BUS
9 11 10
LINE
6 17
LINE
16
LINE
15
LINE BUS
8
LINE
9
BUS
5
BUS BUS
13 7 8
LINE
7
2
LINE
LINE 12
LINE
BUS
1 5 14
LINE BUS LINE
4 4
LINE
6
1 LINE
LINE
3
LINE
BUS BUS
2 3