M60es54 Na549y QC Man 001
M60es54 Na549y QC Man 001
Revision History
01
05/Jan/2015 Initial Release CP MD KM
N/A
02
22/Nov/2017 Revision -3300 CP KM JD
Shear/Seal Hydraulic Volumes and Wellbore Ratio; Re-format
totsales@nov.com nov.com/tot i
M60ES54-NA549Y-QC-MAN-001
Rev 02
Table of Contents
1 Introduction ................................................................................................................................................ 1
2 Features ...................................................................................................................................................... 1
3 Certification ................................................................................................................................................ 1
4 Operation.................................................................................................................................................... 2
5 Recommended Maintenance Program ........................................................................................................ 3
6 Testing ........................................................................................................................................................ 4
7 Specifications .............................................................................................................................................. 5
8 M60ES54-NA569Y-QC .................................................................................................................................6
9 M60ES56-ACT15XL ...................................................................................................................................... 7
10 M60ES56-ACT7 ......................................................................................................................................... 11
11 *EQ15-0001X* .......................................................................................................................................... 15
12 ES5R-*S**L ............................................................................................................................................... 19
13 ES5R-*T**L ............................................................................................................................................... 21
14 ES5R-0G**L ............................................................................................................................................... 23
15 M60HS-QCMA4-ES56 ................................................................................................................................ 25
totsales@nov.com nov.com/tot ii
M60ES54-NA549Y-QC-MAN-001
Rev 02
1 Introduction
The 5.12" 10K ES Dual Combi BOP is designed for coiled tubing and snubbing operations. The ES is the lightest in the
industry, yet retains all the field-proven designs you have come to expect from Texas Oil Tools.
The compact size allows easier handling along with easier maintenance. All actuators feature power hydraulic ram
change, low bonnet bolt torque requirement, and a pressure balance piston for shear operations (no booster required).
Internally ported hydraulics (no external plumbing) eliminates the making and breaking of oil seals when changing or
servicing rams; thus removing the possibility of environmental pollution.
2 Features
3 Certification
Testing - All BOPs are hydrostatic and function tested per API 6A.
H2S Service - Materials in contact with pressured well fluids conform to NACE Specification MR-01-75 for H2S Service.
North Sea Service - In addition to the NACE Specifications and API requirements additional Charpy Impact and NDE are
carried out. A Design Review and Certificate of Compliance by DNV, Lloyds, or Bureau Veritas are furnished with the
Data Book.
Arctic Service – In addition to the NACE specifications, meets the API 6A, with Charpy Impacts.
4 Operation
Ram Open and Close - Before opening the rams be sure the lock screws are backed fully out (turn counter clockwise).
If lock screws do not turn out easily after a closed and locked wellbore pressure test apply 1,500 to 2,200 psi hydraulic
pressure to the "CLOSE" hydraulic port to relieve the load from the end of the tail rod.
To open the rams apply 1,500 psi hydraulic pressure to the body port marked "OPEN". Close the rams by applying
1,500 to 2,200 psi hydraulic pressure to the body port marked "CLOSE".
Bonnet Open and Close - Remove the bonnet bolts (15, 16).
To open the bonnets apply 500 to 1,500 psi hydraulic pressure to the body port marked "CLOSE" (ram close). To close
the bonnets apply 1,500 psi operating pressure to the body port marked "OPEN" (ram open). After closing the bonnets
maintain the 1,500 psi hydraulic pressure to keep the bonnet pulled tightly against the body as the bonnet bolts are
reinstalled.
Remove the bonnet bolts and open the bonnets as described above. Maintain hydraulic pressure until the bonnets
have fully retracted and the rams have fully extended making them accessible. Vent all hydraulic pressure to zero to
prevent personal injury in the event that the bonnet is closed prematurely during the ram change procedure.
Remove the ram by lifting up and over the ram change rod. NOTE: Do not scratch ram change rods.
Front and rear seals may be replaced without fully removing the rams. Lift the ram up until it clears the ram guide rod
and rotate slightly to gain access to the front seal.
Inspect Bonnet Seal - For scratches and deformation, inspect O-rings and O-ring grooves.
Check cutting edges of the shear or shear seal inserts. If the blade is chipped then the cutting action of the insert may
be impaired and therefore it should be discarded.
Check the teeth of the slip inserts. If the slip teeth are blunt or dulled then the gripping action of the ram may be
impaired and therefore the slips should be discarded.
Always store and operate the BOP with the equalizing valve closed.
After 20 Jobs or 12 Months Maximum - Completely disassemble the equalizing valve, replace all seals and worn parts.
Completely disassemble and inspect the bonnet assemblies. Replace all seals and worn parts.
Inspect all threads, connections, bushings and fittings. Replace and repair as required.
100 percent internal and external visual inspection to take place after one year performed service, 200
cycles.
This includes dimensional inspection and Non-Destructive Examination performed on every worn part.
This includes complete strip down of Actuator and replacement of all seals and O-rings associated with the
Actuator.
100 percent visual inspection to take place after 25 pressure tests, or 175 cycles. This includes dimensional
inspection and Non-Destructive Examination performed on Ram Bodies and Ram Blades.
This includes the replacement of all rubber components.
Every 5 Years
Perform major survey of equipment to include complete strip down. All load bearing and pressure
containing parts are to be inspected and Non-Destructive Examination performed.
Replace all seals and O-rings.
Full factory acceptance test program to be completed after 5 year rebuild.
Markings, scratches and scoring on the Ram Bodies, Ram Blades or ram bores to be hand redressed with light Emory
(scotch-brite) type media to remove any sharp edges caused by wear and use.
WARNING:
Signs of pitting (corrosion damage) in sealing areas of Ram Body to be treated with
CAUTION. If excessive, the Ram Body is to be replaced, Replace all worn Ram Bodies.
The above services are to be performed by qualified personnel, with complete knowledge of high pressure well
equipment and are aware of the risks and hazards associated with maintaining and operating this type of
equipment.
6 Testing
Function Test Bonnets - All actuators should be pressure tested to 3,000 psi working pressure in both the ram open
and ram close positions. A minimum hold time of 15 minutes is required without leakage.
Check the manual lock system when in the ram closed position.
Function Tests Shear Seal Ram and Blind Seal Tests - The shear seal rams and the blind rams seal should be closed
using 1,500 psi hydraulic pressure and pressure tested separately to 10,000 psi from below. The test medium should
be water with a rust inhibitor.
Function Test Slip Ram with Pipe Ram Seal Test - The slip rams should be closed around a suitable diameter test bar,
using 1,500 psi hydraulic pressure. The pipe rams should then be closed using 1,500 psi hydraulic pressure and pressure
tested to 10,000 psi from below. A minimum hold time of 15 minutes is required without leakage. The test medium
should be water with a rust inhibitor.
7 Specifications
Weight
Hydraulic Volumes
Shear/Seal (M60ES56-ACT15XL)
Open (per set)................................................................................................................................................ 671 cu. in.
Close (per set) ................................................................................................................................................. 648 cu. in.
Pipe/Slip (M60ES56-ACT7)
Open (per set)................................................................................................................................................. 246 cu. in.
Close (per set) ..................................................................................................................................................246 cu. in.
Hydraulics/Wellbore Ratio
Tightening Torques
Bonnet Bolts ................................................................................................................................................... 500 ft. lbs.
End Flanges 10ksi ............................................................................................................................................ 401 ft. lbs.
Side Outlet 10ksi ............................................................................................................................................. 118 ft. lbs.
Tightening Torques
M60ES56-ACT15XL-ASM-001 Shear/Seal Actuator Qty Torque
Item 16: Bonnet Bolt 4 500 ft.lbs.
Item 17: SHCS 4 300 ft.lbs
Item 18: SHCS 6 700 ft.lbs.
Item 19: Guide Stud 1 50 ft.lbs.
Item 20: SHCS 8 300 ft.lbs.
Item 22: Plug 4 15 ft.lbs.
M60ES56-ACT7 Pipe/Slip Actuator Qty Torque
Item 16: SHCS 2002-3756B 4 160 ft.lbs.
Item 17: SHCS 2002-3757B 6 335 ft.lbs.
Item 19: SHCS 7935-1409G 8 160 ft.lbs.
Item 18: Guide Stud 1 50 ft.lbs.
8 M60ES54-NA569Y-QC
5.12 10K ES DUAL COMBI QCMA
Reference drawing M60ES54-NA549Y-QC-ART-001
M60ES54-NA549Y-QC-ART-001
9 M60ES56-ACT15XL
SHEAR/SEAL ACTUATOR 8.5” PISTON
Reference drawing M60ES56-ACT15XL-ASM-001
Disassembly - Open the bonnets. See bonnet open and close, section 4.0; vent all hydraulic pressure to zero. Remove
the rams and remove set screw (21), rod head (15) and guide (14). Remove the bonnet seals (1-10). Remove socket
head cap screws (20). Remove socket head cap screw (28) and remove slide (25) from slidelock cap (11). Remove
retainer (29) from lock screw (30) and remove lock screw (30) from slide (25). Remove buttonhead screw (26) and
remove leaf spring (27) from slide (25). Remove socket head cap screws (20). Remove retainer seal (3) and seals (1-
7). Remove pressure balance chamber (10) from endcap (5).
Remove socket head cap screws (17&18). Remove end cap (5). Remove O-rings (1-2) and (1-4). Remove retainer ring
(1-12), retainer seal (23), Seals (1-11) & (1-9) and bushing (24). Remove change cylinders (9) and main cylinder (6) from
bonnet (4). Remove piston (13) and T-seal (1-5) from bonnet (4). NOTE: Do not remove piston from rod.
Support weight of bonnet (4) and remove ram change rod (7) and (8) from body with Allen wrench. NOTE: Do not
scratch surfaces of ram change rods. Note specific location of change rods as they have differing thread sizes. Remove
O-rings (1-1) from body.
Remove T-seals (1-6) from ram change rods (7) and (8). Remove O-rings (1-2) and (1-4). Remove retainer ring (1-8),
retainer seals (3) and seals (1-7) from bonnet (4). Remove ram guide rod (19) from bonnet. Remove bushings (2) and
seals (1-7) from bonnet (4). Clean and inspect all parts for wear before reassembly.
Assembly - Typical reverse order of disassembly - pay careful attention to ram change rod surface - do not scratch.
M60ES56-ACT15XL
SHEAR/SEAL ACTUATOR 8.5” PISTON
Reference drawing M60ES56-ACT15XL-ASM-001
M60ES56-SK15*
SEAL KIT F/ SHEAR/SEAL ACTUATOR W/BOOSTER
Reference drawing M60ES56-ACT15XL-ASM-001
M60ES56-ACT15XL-ASM-001
10 M60ES56-ACT7
PIPE/SLIP ACTUATOR
Reference drawing M60ES56-ACT7-ASM-001
Disassembly - Open the bonnets. See bonnet open and close, section 4.0; vent all hydraulic pressure to zero.
Remove the rams and remove set screw (21), rod head (13) and guide (12). Remove the bonnet seal (1-10) and (1-
11). Remove nut (26) and handwheel (25) from the lock screw (23). Remove socket head cap screws (16) and (17).
Remove end cap (5). Use caution not to drop indicator rod (14). Remove O-rings (1-2) and (1-4). Remove retainer ring
(1-9),seal (1-8), and retainer (3). Remove socket head cap screws (19). Remove lockscrew cap (24). Remove and
inspect lock screw (23). Remove change cylinders (9) and main cylinder (6) from bonnet (4). Remove seal retainer (20)
and seal (1-7). Remove piston (11) and T-seal (1-5) from bonnet (4). NOTE: Do not remove piston from rod.
Support weight of bonnet (4) and remove ram change rod (7) and (8) from body with Allen wrench. NOTE: Do not
scratch surfaces of ram change rods. Note specific location of change rods as they have differing thread sizes. Remove
O-rings (1-1) from body.
Remove T-seals (1-6) from ram change rods (7) and (8). Remove O-rings (1-2) and (1-4). Remove retainer ring (1-9),
seals (1-8) and retainers (3) from bonnet (4). Remove bushings (2) and seals (1-8) from bonnet (4). Remove O-rings (1-
1) from body. Clean and inspect all parts for wear before reassembly.
Assembly - Typical reverse order of disassembly - pay careful attention to ram change rod surface - do not scratch.
Install seals (1-8) and retainer (3) and retainer ring (1-9), into end cap (5). Install seals (1-8), retainers (2), retainer rings
(1-9), and O-rings (1-2) and (1-4), into bonnet (4). Insert ram change rods (7) and (8) through bonnet (4). NOTE: Do
not scratch surfaces of ram change rods. Install O-rings (1-1) into body. Support weight of bonnet (4) and thread ram
change rod (7) and (8) into body with Allen wrench. NOTE: Ram change rods have different threads (7) = 1.250-8UNC,
(8) = 1.125-8UNC.
Install T-seal (1-8) onto piston (11). Install piston (11) into bonnet (4); install guide (12), rod head (13) and secure set
screw (21). Install main cylinder (6) and change cylinders (9). Install seals (1-8) retainers (3) and O-rings (1-2) and (1-
4) into end cap (5). Thread lock screw (23) into cap (5) and attach with socket head cap screw (19). Install end cap
(5) onto main cylinder (6) and ram change cylinders (9); secure with socket head cap screws (16) and (17). Install
handwheel (25) and secure with nut (26). Install the bonnet seal (1-10) and O-rings (1-11). Actuator can now be
tested and functioned per 4.0 Operation.
M60ES56-ACT7
PIPE/SLIP ACTUATOR
Reference drawing M60ES56-ACT7-ASM-001
ES56-SK07*
SEAL KIT F/ PIPE/SLIP ACTUATOR
Reference drawing M60ES56-ACT7-ASM-001
M60ES56-ACT7B-ASM-001
11 *EQ15-0001X*
EQUALIZING VALVE 15K NACE
Reference Drawing EQ15-0001
EQ15-0001
H2S/NORTH SEA SERVICE 15K
Reference Drawing EQ15-0001
EVA6-S001
SEAL KIT H2S/NORTH SEA SERVICE 15K
Reference Drawing EQ15-0001
M60EQ15-0001XB
H2S/NORTH SEA SERVICE 15K
Reference Drawing EQ15-0001
EVA6-S001B
SEAL KIT H2S/NORTH SEA SERVICE 15K
Reference Drawing EQ15-0001
12 ES5R-*S**L
SHEAR/SEAL RAM
Reference Drawing ES5R-VS00-ART-001
Disassembly - Remove socket head cap screw (4) and blade assembly (5 or 6) by pushing assembly out the side of the
ram body (1 or 2). Remove blade retainer (7) from blade assembly. Remove rear seal (3). Clean and inspect all parts
before replacement.
Assembly - Place blade retainer (7) into blade assembly (5 or 6) while holding blade retainer (7) in position in the blade
assembly (5 or 6). Slide both into position in the ram body (1 or 2). Secure in place with socket head cap screw (4).
Install rear seal (3) to fit flush with surface of ram body (1 or 2).
ES5R-*S**L
SHEAR/SEAL RAM
Reference Drawing ES5R-VS00-ART-001
ES5R-VS**L
SHEAR/SEAL RAM
ES5R-VS00-ART-001
13 ES5R-*T**L
PIPE/SLIP RAM
Reference Drawing ES5R-VT00-ART-001
Disassembly - Remove front seal (3) and retainer bar (5). Remove compression pin (7) and slip insert (2) by pushing
compression pin toward front of ram. Remove O-ring (6) and rear seal (4). Clean and inspect all parts - replace as
needed.
Remove set screws (9 & 10). Remove rocker (8). Clean and inspect all parts - replace as needed.
Assembly - Install rear seal (4) to fit flush with surface of ram body (1). While holding the retainer bar (5) in position in
the front seal (3), slide both into position in the ram body (1). Place O-ring (6) onto compression pin (7). Slide
compression pin into slot on rear of slip insert (2). Install compression and slip insert assembly into body.
ES5R-*T**L
PIPE/SLIP RAM
Reference Drawing ES5R-VT00-ART-001
ES5R-VT**L
PIPE/SLIP RAM
ES5R-VT00-ART-001
14 ES5R-0G**L
SLIP RAM ASSEMBLY
Reference Drawing ES5R-0G00-ART-001
DISASSEMBLY:
Changing Slip Inserts - Remove the pin (3), it is not threaded and can be driven out using a 1/4" punch. Remove the
slip insert (2) from ram body (401). Clean all parts and replace components as necessary.
ASSEMBLY:
Install slip insert (2) and pin (3) into ram body (1). NOTE: the pin is a clearance fit in the ram and guide and therefore
does not require to be driven in.
ES5R-0G00L
SLIP RAM ASSEMBLY
Reference ES5R-0G00L-ART-001
ES5R-0G**ALX
SLIP RAM ASSEMBLY
ES5R-0G00-ART-001
15 M60HS-QCMA4-ES56
MULTICOUPLER F/5.12 10K ES56 DUAL
M60HS-QCMA4-ES56-ASM-001
M60HS-QCMA4-ES56-ASM-001