1. Introduction 4
2. Objectives 7
6. Contact Person 13
2. Due Diligence 19
A. The Site 19
B. Transportation Plan 20
C. Zoning and Regulatory Approval Process 22
D. Real Estate Taxes and PILOT 23
E. Soils and Geology 24
F. Wetlands 24
G. Economic Demographics 24
H. Existing Lease Obligations 24
I. Blue Laws and Sunday Closing 25
1. Submission Requirements 26
2. Proposal Content 27
2
APPENDICES
A. DOCUMENTS
Note: The above Documents are available for ordering on-line (See Section A6)
2. Drawings
Original Arena Drawings (GRAD/DCOP. T1-T3 and A1-A83)
Environmental Constraints Composite (1994)
Site Plan- Meadowlands Sports Complex
Arena Floor Plans (DVL Engineers. A1-A5)
Route 120 Relocation (L. Berger & Associates. 1”: 3,000”)
Arena-Honeywell Energy Project (dlb Associates. P5, M4)
3. Site Documents
Soil Boring Logs for New Pedestrian Bridge (1989. B1-B19)
Note: The above Maps, Drawings and Site Documentation are available for
Viewing and ordering on-line (See Section A6)
3
INTRODUCTION SECTION A1
The Meadowlands is served by one of the nation’s largest road networks, with easy
access provided to Manhattan via the Lincoln and Holland tunnels and the George
Washington Bridge. The Complex enjoys direct links to the New Jersey Turnpike,
the Garden State Parkway, and Interstate Routes 78, 80 and 95.
Development that is the subject of this RFP is proposed for the Continental Airlines
Arena site located east of Route 120. The outer bounds of the Arena site encompass
approximately 104 acres. The Continental Airlines Arena, associated parking for
approximately 4,000 cars, and associated upland area occupy approximately 62
acres of the Arena site. A small wetland occupies approximately eight (8) acres of
the Arena site. Unimproved upland, isolated wetlands, and a connector roadway
that provides direct connections to the western spur of the New Jersey Turnpike,
Routes 3 and 120, occupy the remaining 34 acres of the Arena site. (See Sections
B2A and B2B for a description of the Arena site and site conditions).
Presently, the Continental Airlines Arena improves the Arena site, which is home to
the New Jersey Nets and New Jersey Devils professional basketball and hockey
franchises, respectively. Other events, including the circus, concerts, and other
professional sporting events, are held at the Arena throughout the year.
The Authority has engaged in negotiations with the owner of these franchise teams
to relocate them into a newly constructed Arena to be built in the City of Newark,
New Jersey by the start of their respective 2005 seasons. Should these negotiations
and efforts prove successful, upon relocating to a new Arena, it is anticipated that
the teams’ existing lease agreements will terminate and the Authority will agree not
to conduct any events or other activity at the existing Arena in competition with the
Newark Arena.
4
diligence and pre-construction planning and permitting prior to this target
construction date.
The Authority envisions creating a multi-use destination at the Arena site that
capitalizes on existing uses at the Meadowlands and expands the product mix in a
manner that is complementary to those uses, without materially competing with
existing business in the Meadowlands District. It is the Authority’s desire to select a
Master Developer to organize a cohesive plan for the Arena site that will connect to
and integrate new development with the remainder of the Complex and existing
facilities, particularly through uses that complement the Meadowlands Racetrack
and are compatible with the operation of Giants Stadium.
The Authority is receptive to some or all of the following uses on the Arena site:
dining, entertainment, retail, hotel, office, exposition facilities, recreation, parking
and transportation centers, but will look to the development community and the
marketplace to propose innovative uses that maximize the potential of the Arena
site, best achieve the strategic goals of the Authority, are consistent with the
Authority’s public purpose as set forth in its enabling legislation, and promote
smart growth and sound economic development in the region.
The Authority is receptive to concepts that incorporate reuse of the Arena, provided
the anticipated non-compete agreement with the proposed Newark facility is
respected.
The Authority seeks to improve public access to the Arena site through
improvements to the existing infrastructure and the provision of mass transit to the
site. To achieve these objectives, the Authority envisions that development on the
Arena site will proceed in phases, with each phase responsive to the timing and
delivery of major transportation improvements and services to the site. (See Section
B2B for a description of the Transportation Plan for the Complex.)
5
The Authority will continue to promote events at Giants Stadium and the
Meadowlands Racetrack as well as on the grounds of the Meadowlands Sports
Complex, and the resident franchise tenants will continue to enjoy certain leasehold
rights under current lease agreements. Proposals submitted in response to this RFP
must be compatible with existing uses at the Complex, and should not compete with
or otherwise result in conflicts with these continuing uses. (See Section B2H for a
summary of existing lease obligations.)
6
OBJECTIVES SECTION A2
In developing a Concept Plan for the Arena site in response to this RFP,
respondents should be guided by the following strategic planning objectives of the
Authority:
• Expand and improve the product mix at the Meadowlands Sports Complex
and at Authority facilities in a manner that supports, enhances and
complements existing uses;
• Achieve greater integration of the Arena site and venues with the region and
the surrounding communities;
• Improve public access to and from the Meadowlands Sports Complex and
provide regional benefits through improvements to the existing
infrastructure and the provision of mass transit to and from the Arena site
and within the region;
• Produce new economic activity that benefits the region and supports
surrounding communities.
7
THE EVALUATION PROCESS SECTION A3
Firms that believe they have the qualifications to be the Master Developer of the
Arena site should submit a Proposal to the Authority that conforms with the
Submission Requirements set forth in Section C of this RFP.
The Authority will follow the following schedule in its evaluation process:
Phase I:
Phase II:
The Authority will consult with and be guided in the evaluation process by a
Stakeholders Advisory Group comprised of legislative leaders, business interests,
local mayors, representatives of the local community, and environmental interests.
All communication between the Authority and potential respondents concerning the
RFP will be via a website. (See Section A6)
8
THE SELECTION PROCESS SECTION A4
The Authority’s Selection Committee will evaluate and rank proposals based upon
the following selection criteria, the oral presentation, and other information deemed
pertinent by the Authority:
• The comprehensiveness of the respondent’s vision for this project and the
degree to which that vision supports, enhances and complements existing
uses and conditions at the Meadowlands Sports Complex and the region, and
meets the public purpose of the Authority.
• The compatibility of the developer’s concept with existing uses at the Arena
site and in the region.
• The economic impact of the proposal on the region and the surrounding
communities, as demonstrated by the submission of a thorough Economic
Impact Analysis of the proposed project as part of the response package. (See
Section C2, section 8)
Because of the nature of the review process, the Authority’s ranking process is a
subjective one and the Authority’s decisions on ranking of proposals shall be in the
sole discretion of the Authority.
The Authority will seek to negotiate a Development Agreement with the firm or
firms receiving the highest ranking, which agreement will address the provisions
listed in Section A5, typical development agreement concepts, and other matters
specific to the firm’s proposal.
9
If the Authority and the top-ranked firm do not finalize a Development Agreement
within a time period deemed reasonable by the Authority, the Authority will seek to
negotiate a Development Agreement with the firm ranked next on the list. It is
expected that this process will continue until a Development Agreement is signed;
however, the Authority retains the right to suspend or terminate this process at any
time.
10
PROPOSED CONTRACT ARRANGEMENT SECTION A5
• The Authority continues to own the land. The Authority will consider a
range of options proposed by the Master Developer that achieve the strategic
goals of the Authority and ensure that the Authority has sufficient right and
power to carry out the public purposes set forth in the Authority’s enabling
legislation.
• The Master Developer manages the design and construction of the project.
• The Master Developer arranges all project financing with no risk attributed
to the Authority. The Authority will assist in this process to the extent
necessary.
• Subject to the Tort Claims Act and the New Jersey Contractual Liability Act,
the Authority will only make representations and warranties as to the
environmental condition of the Arena site to a non-residential standard.
• The uses permitted under the lease, or other arrangement with the Master
Developer, shall be consistent with the public purpose for which the
Authority was formed, and shall not conflict with the rights of the franchise
sports tenants, or other parties with whom the Authority has contracted,
including but not limited to the manner in which such lease agreements
11
relate to the right to use of the venues and related facilities, parking
requirements, and the free flow of traffic into and out of the Meadowlands
Sports Complex. (See Section B1 and B2H for a summary of the relevant
terms of the lease agreements.)
• The Authority’s only investment in the project is the land. The Authority will
not assume debt.
• The Authority receives land lease fees and participates in the profits of the
project, as set forth in Section C3- Financial Cash Flows from Real Estate
Pro-Forma.
• The Authority will have final approval over project design and schedule, the
uses allowed at the project, and acceptance of major tenants. The Authority’s
approval in these areas will not be unreasonably withheld.
12
CONTACT PERSON SECTION A6
All potential respondents are directed to register at the website as soon as possible to
access all support materials referenced in this RFP and to ensure receipt of all
future Addenda to the RFP. To register, respondents are directed to:
http://www.bidset.com/sql/login.asp Respondents will be required to enter their e-
mail address. The initial access password is: T187-95
All Maps, Drawings and Site Documentation referenced in Section B of the RFP
and listed in the Appendix are available for viewing on this website, and may be
ordered on-line for overnight delivery. Copies of all Documents referenced in
Section B of the RFP and listed in the Appendix may also be ordered on-line for
overnight delivery, but are not available for viewing on-line. Respondents will be
responsible for the cost of these materials.
All questions concerning this Request for Proposal must be submitted in writing via
the website. All responses to questions will be issued to all potential respondents as
Addenda to the RFP via the website.
If you are unable to access the website or experience difficulties receiving materials
or Addenda, please contact Barbara P. Lampen, Vice President, Strategic Planning
and Development at: MeadowlandsArenaRFP@njsea.com
13
THE PROJECT CONCEPT PLAN SECTION B1
A Site Survey Base Map and CAD CD are included in the pocket part of this
Proposal. The Site Survey Base Map illustrates the Arena site with Route 120 in its
current location. One of the several plan layers included on the CD can be overlaid
to illustrate the Arena site with Route 120 in its relocated position. Additional layers
include utility locations, acreages, and location of wetlands. This Site Survey Base
Map should be used in developing the Concept Plan(s).
The Authority is receptive to some or all of the following uses on the Arena site:
dining, entertainment, retail, hotel, office, exposition facilities, recreation, parking
and transportation centers, but will look to the development community and the
marketplace to determine which uses maximize the potential of the Arena site, best
achieve the strategic goals of the Authority, meet its public purpose as set forth in
the enabling legislation, and promote sound economic development in the region.
The Authority understands that the types and densities of land uses developed at the
Arena site will influence the type of mass transit service to the Complex, if any, that
could be provided economically. Accordingly, the Authority will place a high
premium on Concept Plans that affirmatively encourage the delivery of mass transit
service through the appropriate mix of land use types and densities. Respondents
should evaluate the types and densities of land uses proposed for the Arena site to
determine if the proposed Concept Plan will support some type of mass transit
service and when that service might be delivered, and reflect that determination in
the phasing of the overall Concept Plan. (See Appendix I for Mass Transit Service
Delivery Parameters.)
14
Timing and Schedule of Site Availability
The Authority has engaged in negotiations with the owners of New Jersey Nets and
the New Jersey Devils to relocate them into a newly constructed arena to be built in
the City of Newark, New Jersey by the start of their respective 2005 seasons.
The Authority anticipates that any Concept Plan for the Arena site will initially
direct development to the Arena Site, with or without the relocation of Route 120.
The Authority invites respondents to develop Concept Plans incorporating later
phases of development on the remainder of the Sports Complex Site, with the
assumption that structured parking and the use of the backstretch area at the
Meadowlands Racetrack may be considered in the Plan. Accommodation of mass
transit at the Complex should be incorporated in this phasing.
The Meadowlands Sports Complex is divided into two sections, the East Site and the
West Site, by the north/south leg of New Jersey Route 120. Continental Airlines
Arena, with parking for 4,000 cars, improves the approximately 104-acre East Site.
Giants Stadium and the Meadowlands Racetrack, with parking for approximately
25,000 cars, improve the approximately 580-acre West Site.
The New York Football Giants and the New York Jets maintain leasehold interests
in Giants Stadium, through 2026 and 2008 respectively, for 16 home football games
and any playoff and championship games played in Giants Stadium between August
and January of each year. (See Appendix II for 2001 Event Schedule).
On NFL home game days, the Giants and the Jets enjoy certain rights to the use of
the Complex. These include:
• Surface parking for 24,000 cars and 400 buses. The Authority accommodates
this requirement by providing not less than 4,000 parking spaces on the
Continental Airlines Arena site. While these 4,000 spaces currently exist as
surface parking, the Authority may make them available as either surface or
deck parking;
15
• Parking shall be available three hours prior to a football game and three
hours after a football game; and
The Meadowlands hosts harness racing’s richest and most prestigious race, the $1.2
million Hambletonian Trot. The track also hosts the $1 million Meadowlands Pace
and Breeders Crown series during its harness meet. The track hosts six graded
thoroughbred stake events each season, highlighted by the $500,000 Meadowlands
Cup.
The Authority will continue to promote sporting events and concerts at Giants
Stadium as well as other activities at the Meadowlands Racetrack and generally on
the Meadowlands grounds, such as the annual Meadowlands Fair. (See Appendix II-
Event Schedule)
At times when sporting events, concerts and other activities may be conducted, the
Authority utilizes the existing parking areas of the Continental Airlines Arena site
to accommodate parking demand and to meet the Authority’s contractual
requirements. This practice will continue notwithstanding a change of the use of the
Arena site, although parking may be made available as either surface or deck
parking.
The Meadowlands Sports Complex is divided into two sections by the north/south
leg of New Jersey Route 120. Prior analyses undertaken by the New Jersey
Department of Transportation (NJDOT) and the Authority have investigated the
16
feasibility of relocating Route 120 from its current location to a new location east of
the Arena (See Section B2B for detailed cost and project information.)
Under the relocation project, following the opening of the road, the roadbed of the
existing Route 120 would be transferred to the Authority in return for the
Authority’s conveyance to the NJDOT of Authority-owned property east of the
Arena that is required for construction of the road. The vacated roadbed of Route
120 would be available for development by the Master Developer. (See enclosed Site
Plan CD)
The NJDOT is willing to enter into a public private partnership with a selected
Master Developer for construction of the Route 120 project under the
Transportation Demonstration Act or similar authorization (See Appendix III).
Through this process, the NJDOT will seek to allocate costs of these improvements
among the Master Developer, the Authority, and NJDOT.
All respondents to this RFP should expect that the existing site condition at
commencement of development on the Arena site would be Route 120 in its current
location.
The Authority has also developed concept plans for on-site, transitional, and
regional roadway improvements needed to maintain and enhance traffic flow
conditions into and around the Meadowlands Sports Complex if Route 120 were not
relocated. These improvements are estimate to cost approximately $35 million, in
1998 dollars, and could be implemented in a three to five year timeframe. (See
Appendix IV for a summary of the proposed improvements). Again, the Master
Developer and the Authority would likely be asked by NJDOT to fund portions of
the cost of these improvements.
17
Regional Economic Impact
The Authority will look favorably on proposals that promote sound economic
growth in the region and in the surrounding communities. In evaluating the
economic impact of a proposal, the Authority will be guided by the economic impact
analysis provided in Section C4 of the Proposal, particularly the analyses related to
direct and indirect spending and full-time, part-time and construction employment
resulting from the project proposal.
18
DUE DILIGENCE SECTION B2__________
All Documents, and Maps, Drawings and Site Documentation listed in the
Appendices section of this RFP and/or referenced here in Section B may be viewed
and ordered on-line. (See Section A6 for details)
The western spur of the New Jersey Turnpike bounds the Arena site on the
southeast, and Route 3 bounds the Arena site on the southwest. Paterson Plank
Road forms the northeast boundary of the Arena site, and Berry’s Creek, a
tributary of the Hackensack River, forms the northwest boundary.
The Meadowlands Sports Complex is divided into two sections, the East Site and the
West Site, by the north/south leg of New Jersey Route 120.
Giants Stadium and the Meadowlands Racetrack improve the approximately 580-
acre West Site. Parking for approximately 25,000 automobiles on the West Site
occupies approximately 130 acres.
Giants Stadium is the home field for the New York Football Giants and the New
York Jets. The seating capacity for a football game is approximately 78,000. The
Giants hold leasehold rights for football games in the Stadium through 2028, and
the Jets through 2008 (See Section B2H for a summary of lease terms).
The Meadowlands Racetrack provides complete facilities for both daytime and
nighttime thoroughbred and harness racing. The six-level grandstand is enclosed
and climate controlled. With its twin outdoor ramps for standees, the grandstand
can accommodate 35,000 people.
The backstretch area contains 12 barns with stables for 1,320 horses, five (5) two-
story dormitory buildings with rooms for 500, and various administration buildings.
19
Road were demolished in 1974 when the New Jersey Turnpike Authority
constructed the ramps and connector roads to provide access to the Arena site.
The outer bounds of the Arena site encompass approximately 104 acres. The
Continental Airlines Arena, parking for approximately 4,000 cars, and associated
upland area occupies approximately 62 acres of the Arena site. A small wetland
occupies approximately eight (8) acres of the Arena site. Unimproved upland,
isolated wetlands, and a connector roadway that provides direct connections to the
western spur of the New Jersey Turnpike, Routes 3 and 120, occupies the remaining
34 acres of the Arena site. (See Site Survey Base Map enclosed in this RFP.)
Finished elevations on the Arena site range from 9 to 14 feet in parking areas and
roadways. The 100- year flood stage is 8.6 feet above MSL.
A gravity storm water collection system, separated from the sanitary sewerage
system, collects site drainage into one drainage line running under Route 120 and
into a system of storm water lagoons on the West Site. (See Original Arena
Drawings-Site Work for detail on the site drainage system).
A sanitary sewer line connects the Arena to an existing 15-inch line that connects to
the main trunk line north of Giants Stadium. This trunk line flows to the Bergen
County Sewerage Treatment Plant. There is currently sufficient capacity at the
treatment plant to support development on the Arena site. Hook-up fees are
estimated to be $1,750 plus a $25,000 meter deposit and Bond. Treatment cost is
$1,500 per million gallons of flow.
Potable water is supplied by United Water Resources through extensions from the
existing water mains in Route 120.
The Route 120 relocation project involves the design, engineering and construction
of approximately 6,500 feet of highway and approximately seven new
20
interconnecting bridge structures. Under this relocation project, following the
opening of the road, the roadbed of the existing Route 120 would be transferred to
the Authority in return for conveyance to the NJDOT of Authority-owned property
east of the Arena that is required for construction of the road. The vacated roadbed
of existing Route 120 would be available for development by the Master Developer.
(See enclosed Site Plan.)
Regional benefits of the relocation project include improved safety conditions and
network-wide traffic flow conditions at existing interchanges at Routes 120 and 3,
and improved regional traffic flow and distribution at Routes 3, 120, 17 and the
16W Turnpike interchange. Benefits to the Authority include achieving site
continuity and an opportunity for future development at the Meadowlands Sports
Complex to be more closely integrated.
The Project has advanced to 70% design development, and would be constructed
under three (3) contracts. Contract 1, surcharge of wetlands east of the Arena, has
been completed. Contract 2, construction of Route 3 connections, and Contract 3,
construction of the new Route 120 roadbed and connections to the Turnpike, have
not been advanced. It is anticipated construction would take 4 to 6 years to
complete. The total cost of the relocation project is approximately $150 million in
2002 dollars.
The Authority has evaluated the departure of vehicles from the Meadowlands
Sports Complex after a major event at the Sports Complex under a variety of
development alternatives for the Complex, including the relocation of Route 120. A
mathematical model has been developed to predict departure times from an event
under current conditions and under certain development scenarios. A comparison
of results indicates that, if Route 120 were relocated, egress from the Complex
would be as good or better as that under existing conditions. (See Appendix V for
additional information on the Route 120 relocation project and the traffic departure
analysis.)
The Authority has also analyzed the impact of certain development scenarios at the
Meadowlands Sports Complex and on the Arena site to determine on-site,
transitional, and regional network improvements needed to maintain and enhance
traffic flow conditions into and around the Complex if Route 120 were not relocated.
While analysis of these proposed network improvements has not advanced beyond
21
the concept development phase with the NJDOT, the improvements are estimated to
cost approximately $35 million, in 1998 dollars, and could be implemented in a three
(3) to five (5) year timeframe. (See Appendix IV).
In 1996, NJ Transit, Bergen County, N.J., and Rockland County, N.Y. initiated the
West Shore Region Study to examine mobility issues in Bergen County, NJ and
Rockland County, NY. A selected preferred build alternative emerging from this
analysis is West Shore commuter rail service via the Meadowlands Sports Complex.
West Shore Corridor commuter rail service via the Meadowlands Sports Complex
would provide commuter rail service to and from stations along the West Shore line
between West Nyack and the Secaucus Transfer Station and Hoboken. The soon to
open Secaucus Transfer Station will integrate NJ Transit’s rail system at a central
location, improving both intra-state and trans-Hudson travel and access. The
Transfer Station will ultimately tie together most of the NJ Transit rail network
with the Northeast Corridor, providing the Complex with access to the Northeast
Corridor rail system, the Hudson River waterfront, and Newark Airport via the
airport’s monorail extension.
The Meadowlands segment of the West Shore line is capable of being implemented
as a stand-alone project, or as a first phase of the West Shore line. As a stand-alone
project, the line would consist of a 2-mile spur off the existing Bergen County line
terminating in a four track Meadowlands Sports Complex Rail Station with two
high-level island platforms. This stand-alone project could be implemented within a
five (5) to seven (7) year timeframe at a cost of $160 million, in 1997 dollars. (See
Appendix VII for additional information on the rail spur project.)
22
has that responsibility. (See Appendix IX for background information on the
Hackensack Meadowlands District and surrounding land uses).
The Authority’s statute includes two exceptions to the above exemption. The first is
that all projects shall conform to the Barrier-Free Sub-Code promulgated as part of
the State Uniform Construction Code. The second requires the Authority to consult
with the Meadowlands Commission before making any determination as to the
location, type and character of any Authority project at the Meadowlands.
In order to comply with this second exception, as well as with Section 23 of the
Authority statute, which addresses consultation with both the Meadowlands
Commission and the State Department of Environmental Protection (DEP) for the
purposes of maintaining the environmental balance of the Meadowlands, the
Authority is required to present its project proposal to the Meadowlands
Commission and the DEP at a public hearing. To satisfy these provisions,
consultation would likely take place through a public hearing co-chaired by the
DEP and the Meadowlands Commission, after public notice of the time and place
thereof, to discuss environmental concerns impacted by the project.
All interested persons are to be heard at that time as well. The Meadowlands
Commission and the DEP are required to give consideration to the presentation and
determine that the site selection maintains the aforementioned environmental
balance. The details of the hearing would then be set forth in a Report.
Pursuant to its enabling statute, the Authority contributes payments in lieu of taxes
to the Borough of East Rutherford and allocates a portion of these payments to each
of its facilities, including the subject Arena site. Upon selection of and
redevelopment by a Master Developer of the Arena site, the Authority will, in
consultation with the selected Master Developer, reassess and reallocate the amount
of payments in lieu of taxes being paid to the Borough of East Rutherford so that
each facility will contribute its fair share of these payments. For calendar year 2002,
the amount being paid to the Borough of East Rutherford is $3.754 million, of which
30% is being allocated by the Authority to the Arena site. No representation is being
made as to the amount to be paid to the Borough of East Rutherford or the
percentage thereof to be allocated to the Arena site following its redevelopment. The
23
allocation to the Arena site is subject to readjustment, based upon the successful
redevelopment of the Arena site.
B2F- Wetlands
This wetland was previously filled as part of the scope of work for the relocation of
Route 120. The surcharge area will eventually provide the roadbed for the
relocation of Route 120, if this project is undertaken. (See Site Survey Base Map,
Route 120 relocation overlay, for the location of the surcharge area).
See Appendix XII for relevant portions of the Stadium Lease Agreements.
24
B2I- County Blue Laws/Sunday Closing
Bergen County, in which the Meadowlands Sports Complex is located, has opted by
referendum to enforce New Jersey’s Sunday Closing Law, or “Blue Laws” which
make it unlawful to sell at retail, wholesale or auction certain proscribed categories
of goods on Sundays. These categories generally include: clothing and wearing
apparel, building and lumber supply materials, home business and office furniture
or furnishings, and home business or office appliances. The Sunday Closing Law
prohibiting the sale of the described items on Sundays is applicable within the
Meadowlands Sports Complex except that such items may be sold if ancillary to the
conduct of any event, which is within the Authority’s core mission.
25
SUBMISSION REQUIREMENTS SECTION C1
Firms wishing to be considered for this assignment should submit 20 copies of their
Proposal to:
Submissions must arrive at the above address by no later than 5:00 p.m. on
Monday, September 16, 2002. The Authority reserves the option to reject Proposals
received after this deadline.
26
PROPOSAL CONTENT SECTION C2
Section 9 Contingencies
The Executive Summary should highlight the key points in the remainder of the
Proposal. Firms should articulate the reasons the Authority should select their team
for the project. Firms are encouraged to discuss previous successful projects similar
in scope and complexity. Disclosure of financial results, occupancy, rental rates, and
other pertinent information is strongly encouraged.
Firms should present their Concept Plan for the Arena site in written text and
graphic form. Firms should articulate their vision for the project, addressing how it
conforms to the Authority’s strategic planning goals and complements existing uses
at the Meadowlands Sports Complex. The Project Concept Plan should address the
issues set forth above in Section B1.
All project components should be clearly defined, including the approximate size of
each use, and a comparative analysis of each use as a percentage of the whole.
27
Section 3- Qualifications of the Developer
We recognize that firms often form teams on assignments of this nature. The
qualifications statement however should be limited to the firm or firms seeking to be
the lead developer(s) on this project. The Authority will not entertain Proposals
offered through a broker, and will not pay any brokerage fees.
The firms’ qualification statement should be concise and contain only information
that is pertinent to this type of project. Your qualifications statement must be
organized into the following sections:
Firm Profile: Provide a brief history of the firm and its ownership
structure.
Key Personnel: Describe the strength and depth of your firm. Provide
resumes of key personnel assigned to the project. The
Authority encourages diversity in the make-up of the
Project Team.
Financial
Resources: Provide information that will support the financial
stability of your organization. Financial statements,
lines of credit, and bank references should be
referenced.
28
Development
Experience: Demonstrate, by reference to specific projects, that your
firm has experience developing large, multi-use
projects.
Comparable
Projects: Provide specific information on three projects that you
feel demonstrate your qualifications to be the Master
Developer for this project. Provide the following
information for each: project size, cost and location;
responsibility during and after development; partners;
method of financing (debt and equity); project team;
evidence of success; financial performance and returns
on investment, equity and gross revenue.
Please provide a summary of project costs in the form provided in Attachment II.
Please do not deviate from this format.
Please provide a summary of the projected financial results of the project in the
form provided in Attachment III A and Attachment III B. Please do not deviate
from this format. Failure to respond in the required format will result in the
response being deemed non-compliant.
Please provide a summary of the expected return to the Authority in the form
provided in Attachment IV. Please do not deviate from this format. Failure to
respond in the required format will result in the response being deemed non -
compliant.
The Authority will look favorably on proposals that promote sound economic
growth in the region and in the surrounding communities. Please provide a
summary of the expected economic impact of the proposed project in the form used
in the NJSEA 1998 Economic Impact Study, which is attached here as Appendix
XIII. The Authority is particularly interested in the analysis related to direct and
29
indirect spending, and full-time, part-time and construction employment resulting
from the project proposal.
Section 9- Contingencies
Please identify any contingencies that might impact the ability of your firm to
perform. Please discuss any problems the developer may foresee with any aspect of
the project.
30
FORM OF REAL ESTATE PRO-FORMA SECTION C3
31
FORM OF ECONOMIC IMPACT ANALYSIS SECTION C4
32
33