0% found this document useful (0 votes)
199 views5 pages

Gap I Sap SD:-: Manoj Tony 8763427833

This document discusses SAP SD training provided by Manoj Tony, including online and classroom options. It provides examples of gaps in standard SAP configurations and solutions using alternate methods like Bills of Materials. It also outlines how to prevent future and past date posting in invoices by developing new routines to compare the billing date and system date.

Uploaded by

Rahul
Copyright
© © All Rights Reserved
Available Formats
Download as PDF, TXT or read online on Scribd
Download as pdf or txt
0% found this document useful (0 votes)
199 views5 pages

Gap I Sap SD:-: Manoj Tony 8763427833

This document discusses SAP SD training provided by Manoj Tony, including online and classroom options. It provides examples of gaps in standard SAP configurations and solutions using alternate methods like Bills of Materials. It also outlines how to prevent future and past date posting in invoices by developing new routines to compare the billing date and system date.

Uploaded by

Rahul
Copyright
© © All Rights Reserved
Available Formats
Download as PDF, TXT or read online on Scribd
Download as pdf or txt
Download as pdf or txt
You are on page 1/ 5

SAP SD , GTS, GST & LE BY

MANOJ TONY
+91 87634 27833 / +91 72177 08599
sapsd.delhi@gmail.com ONLINE & CLASS ROOM TRAINING

GAP I SAP SD:-


If client requirement is not fulfilled by standard configuration or If there is no any solution by standard
configuration then we will treat it as gap in sap.

Example of GAP-

1.1 MULTIPLE FREE GOODS IN SAP:- In standard Free goods we can’t


determine multiple goods as free. So we give alternate solution through
BOM.

BOM HEADER PRICING

Step-1

Item Category Determination

Main Item Sub-Item

OR OR

ERLA NORM

…….. ………..

……… TAQ

TAQ TAE

Step- 2

Go to main material and maintain ITEM Category group as ERLA

Step -3 Maintain Pricing condition record.

Your seriousness is my success… Manoj Tony… 8763427833 Page 1


SAP SD , GTS, GST & LE BY
MANOJ TONY
+91 87634 27833 / +91 72177 08599
sapsd.delhi@gmail.com ONLINE & CLASS ROOM TRAINING

Step-4

Create BOM (T-Code to create BOM is CS01)

Enter

Save it.

Your seriousness is my success… Manoj Tony… 8763427833 Page 2


SAP SD , GTS, GST & LE BY
MANOJ TONY
+91 87634 27833 / +91 72177 08599
sapsd.delhi@gmail.com ONLINE & CLASS ROOM TRAINING

Now create a sales order and check price.

Main Item:-

Your seriousness is my success… Manoj Tony… 8763427833 Page 3


SAP SD , GTS, GST & LE BY
MANOJ TONY
+91 87634 27833 / +91 72177 08599
sapsd.delhi@gmail.com ONLINE & CLASS ROOM TRAINING

Sub-item

*In BOM we can determine price for all item and give 100% for all sub-item.

Your seriousness is my success… Manoj Tony… 8763427833 Page 4


SAP SD , GTS, GST & LE BY
MANOJ TONY
+91 87634 27833 / +91 72177 08599
sapsd.delhi@gmail.com ONLINE & CLASS ROOM TRAINING

FUTURE DATE POSTING:- Client requirement is system should not allow to


create invoice in Future Date.

For this requirement we need to develop new routine.

VBRK/VBRP  001 / 006 / 007 are standard routine.

Take XVBRK –FKDAT (billing date)

Take XVBRK-ERDAT (SYSTEM DATE)

If XVBRK-FKDAT is greater than XVBRK-ERDAT

Give error message. “Future date posting not allowed”

PAST DATE POSTING:- Client requirement is system should not allow to


create invoice in Future Date.

Take XVBRK –FKDAT (billing date)

Take XVBRK-ERDAT (SYSTEM DATE)

If XVBRK-FKDAT is less than XVBRK-ERDAT

Give error message. “Future date posting not allowed

Your seriousness is my success… Manoj Tony… 8763427833 Page 5

You might also like