Bhel, Bawana Power Project: Session: 2014-2015

The document provides information about a 1500 MW combined cycle power plant project by BHEL in Bawana, Delhi. It discusses that the plant generates power using gas turbines and steam turbines. It then explains the basic structure and working of a combined cycle power plant. It describes the key components of the plant including the gas turbine, heat recovery steam generator (HRSG), steam turbine, electric generator, circuit breakers, and transformers. It provides details on the design and advantages of these components.

Uploaded by

Venu Yadav
Copyright
© © All Rights Reserved
Available Formats
Download as PDF, TXT or read online on Scribd
Download as pdf or txt
0% found this document useful (0 votes)
42 views20 pages

Bhel, Bawana Power Project: Session: 2014-2015

The document provides information about a 1500 MW combined cycle power plant project by BHEL in Bawana, Delhi. It discusses that the plant generates power using gas turbines and steam turbines. It then explains the basic structure and working of a combined cycle power plant. It describes the key components of the plant including the gas turbine, heat recovery steam generator (HRSG), steam turbine, electric generator, circuit breakers, and transformers. It provides details on the design and advantages of these components.

Uploaded by

Venu Yadav
Copyright
© © All Rights Reserved
Available Formats
Download as PDF, TXT or read online on Scribd
Download as pdf or txt
Download as pdf or txt
You are on page 1/ 20

PROJECT TRANING REPORT

ON
BHEL, BAWANA POWER PROJECT
Session: 2014-2015

AJMER INSTITUTE OF TECHNOLOGY, AJMER


SUBMITTED TO :- SUBMITTED BY :-
Mr. MOHAN RAMANANI TANUJ JHANKAL
H.O.D., Elec. Deptt. B.Tech. IV Yr.(Electrical &
Electronics Engg.)
Roll no. : 11EATEX027
INRODUCTION TO ORGANISATION :-

• BHEL, is the largest engineering and


manufacturing enterprise in India .
• More than 65% of the electrical power in
India is contributed by BHEL
• BHEL manufactures almost all high
technology products required.
ABOUT THE PROJECT :-

• This is a COMBINED CYCLE POWER PLANT to


generate 1500 MW of electrical power.
• The gas turbines and steam turbines are the
source of generation of power of rated capacity.
• It is the highest rated combined cycle power
project i.e. of 1500 MW.
• plant is laced with all the latest power
generation techniques.
The basic structure of the plant
COMBINED CYCLE
DESIGN PRINCIPLE OF COMBINED CYCLE

• Working principle of
a combined cycle
power plant
(Legend: 1-Electric
generators, 2-
Steamturbine, 3-
Condenser, 4-Pump,
5-Boiler/heatexchanger,
6-Gas turbine)
GAS TURBINE
• Also called as Combustion turbine .
• The gas turbine assembly contains six major
sections.
• Air inlet System
• Compressor
• Fuel Handling System
• Combustion System
• Turbine
• Exhaust System
• Lubricating System
BRAYTON CYCLE
Advantages of Gas Turbine Engines:-
• Smaller in size.
• Fewer moving parts .
• Greater reliability .
• Waste heat is dissipated almost entirely in the
exhaust.
• Low lubrication oil cost consumption.
• High operating speeds.
Disadvantages of Gas Turbine
Engines:-
• Cost is very high.
• Less efficient at ideal speed.
• Less responsive to change in power demand.
HRSG
• A HRSG is heat recovery steam generator.
• An energy recovery heat exchanger.
• The common applications for an HRSG:
a) In a combined-cycle power station.
b) In diesel engine combined cycle power plants.
c) In cogeneration plants.
Modular HRSG
• HRSGs consist of four major components: the economizer,
evaporator, Super heater and water Pre heater.
STEAM TURBINE
• A steam turbine is a device that extracts thermal
energy from pressurized steam and uses it to
do mechanical work on a rotating output shaft.
• It is used to drive an electrical generator.
• The of ST includes:-
a) condensing
b) non-condensing
c) reheat, extraction .
BUSDUCT
• It is used to carry voltage and current from
transformer to other component like
generator and switchgear.
ELECTRIC GENERATOR
• It converts mechanical energy to electrical
energy.
• In this plant synchronous generators are used.
• The main parts of a generator are:
a) Mechanical parts :
 Rotor
 Stator
b) Electrical parts :
 Armature
 Field
CIRCUIT BREAKERS
• A circuit breaker is an automatically operated
electrical switch.
• It is designed to protect an electrical circuit from
damage.
• Once a fault is detected, contacts within the
circuit breaker will open.
• Some mechanically-stored energy is used to
separate the contacts.
• Although some of the energy required may be
obtained from the fault current.
Static Starter
• Static power converter is designed to provide
an optimal match to the power.
• Static starter is an adjustable speed ac drive
system.
• Specifically designed to start a gas turbine-
generator set.
• Provides optimum starting conditions for the
gas turbine.
TRANSFORMER
• A device that transfers electrical energy from
one circuit to another.
• The transformer is based on two principles:
– An electric current can produce a magnetic
field (electromagnetism).
– Electromagnetic induction .
Field Installation Transformer
THANK YOU
If you have any questions I am here to answer
them.

You might also like