1) The document provides guidelines for loading catalyst into a reactor vessel, including cleaning the vessel, installing a bed support, marking height levels on the vessel walls, and using a "sock-loading" technique to control the free-fall of catalyst from no more than 1 meter. 2) Personnel should wear protective gear and place planks on top of loaded catalyst if they must enter the vessel. 3) Once catalyst is loaded, the bed must be leveled and a hold-down layer of inert balls installed and leveled.
Copyright
© © All Rights Reserved
Available Formats
Download as PDF, TXT or read online on Scribd
Download as pdf or txt
0% found this document useful (0 votes)
170 views3 pages

BASF R5-12 Loading Procedure

1) The document provides guidelines for loading catalyst into a reactor vessel, including cleaning the vessel, installing a bed support, marking height levels on the vessel walls, and using a "sock-loading" technique to control the free-fall of catalyst from no more than 1 meter. 2) Personnel should wear protective gear and place planks on top of loaded catalyst if they must enter the vessel. 3) Once catalyst is loaded, the bed must be leveled and a hold-down layer of inert balls installed and leveled.
Copyright
© © All Rights Reserved
Available Formats
Download as PDF, TXT or read online on Scribd
Download as pdf or txt
Download as pdf or txt
You are on page 1/ 3

BASF Catalysts

Technical Bulletin
BASF Catalyst R5-12
Sock-Loading Procedure

The following guidelines are recommended for filling the reactor vessel with catalyst:

1. Before the catalyst charging begins, the vessel should be cleaned, leak-tested and
inspected. The inside walls and internals must be clean. The condition of the vessel
should be noted with respect to corrosion and wall thickness.

2. A suitable bed support must be installed before catalyst loading begins. See page 2 for
a typical bed support design.

3. Before charging catalyst to the vessel, it is recommended to mark the inside wall of the
vessel, e.g. with chalk or soap, at the targeted heights for the layers of support material
and catalyst respectively. This will facilitate the leveling of the bed, and help ensure
that the correct quantities of support materials and catalyst have been loaded.

4. The catalyst can be charged directly from drums or bags, or from a loading hopper.
The catalyst must not be allowed to free-fall more than 1 meter. The free-fall can be
controlled by loading through a funnel with hose attached ("sock-loading" technique).

5. If personnel must be inside the vessel during the filling operation or after catalyst has
been loaded, planks should be placed on top of the catalyst for standing on. Treading
directly on the catalyst should be avoided, to prevent attrition of the catalyst and form-
ation of fines in the bed.

6. Once all catalyst has been loaded into the vessel, the bed must be leveled carefully.

7. Finally, the hold-down layer of inert balls (see page 3) must be put in and leveled.

Important Note! Personal protective gear including gloves,


safety glasses and dust mask must be worn by all personnel
involved in the catalyst loading operation.

Chemical Intermediates - 1- BASF


BASF Catalysts
Technical Bulletin
BASF Catalyst R5-12
Sock-Loading Procedure

Bed support and hold-down illustration

Figure 1

Inert support balls,


Norton Denstone or
equivalent (see Fig. 2)

Catalyst R5-12

Inert support balls,


Norton Denstone or
equivalent (see Fig. 3)

Chemical Intermediates - 2- BASF


BASF Catalysts
Technical Bulletin
BASF Catalyst R5-12
Sock-Loading Procedure

Bed support and hold-down illustration (continued)

Figure 2. Bed hold-down detail

150 mm of 25mm balls

TOP OF CATALYST
floating screen (optional)

Figure 3. Bed support detail

floating screen (optional)


CATALYST

75 mm of 6mm balls

75 mm of 12mm balls

Bottom head filled with


25mm balls, up to 50-75 mm
above the tangent line

Johnson Vee-wire screen with solid top plate


and 0.5mm slot opening, sized to provide at
least the same open area as the exit nozzle.