The following guidelines are recommended for filling the reactor vessel with catalyst:
1. Before the catalyst charging begins, the vessel should be cleaned, leak-tested and
inspected. The inside walls and internals must be clean. The condition of the vessel
should be noted with respect to corrosion and wall thickness.
2. A suitable bed support must be installed before catalyst loading begins. See page 2 for
a typical bed support design.
3. Before charging catalyst to the vessel, it is recommended to mark the inside wall of the
vessel, e.g. with chalk or soap, at the targeted heights for the layers of support material
and catalyst respectively. This will facilitate the leveling of the bed, and help ensure
that the correct quantities of support materials and catalyst have been loaded.
4. The catalyst can be charged directly from drums or bags, or from a loading hopper.
The catalyst must not be allowed to free-fall more than 1 meter. The free-fall can be
controlled by loading through a funnel with hose attached ("sock-loading" technique).
5. If personnel must be inside the vessel during the filling operation or after catalyst has
been loaded, planks should be placed on top of the catalyst for standing on. Treading
directly on the catalyst should be avoided, to prevent attrition of the catalyst and form-
ation of fines in the bed.
6. Once all catalyst has been loaded into the vessel, the bed must be leveled carefully.
7. Finally, the hold-down layer of inert balls (see page 3) must be put in and leveled.
Figure 1
Catalyst R5-12
TOP OF CATALYST
floating screen (optional)
75 mm of 6mm balls
75 mm of 12mm balls