F-NG-174 (css
(Elephant) Development Project - GOSP FES
—
Fal7aioio-01 | _ PROJECT MANAGEMENT PROCEDURE __| 20 g2/t379
PROCEDURE NO. GS-MO-Q-PR-00-014-C1
1.0 PURPOSE
2.0 SCOPE.....
3.0 DEFINITIONS AND ABBREVIATIONS.
ENGINEERING QUERIES
4.0 RESPONSIBILITIES....
5.0 PROCEDURE...
6.0 REFERENCE DOCUMENTS
7.0 DISTRIBUTION,
ATTACHMENT A01
FLOW DIAGRAM ENGINEERING QUERIES
CONTENTS
ATTACHMENT A02_ TECHNICAL QUERY SHEET...
ATTACHMENT A03_ ENGINEERING QUERY REGISTER
FELD DEVE!
[eno ASR OL COMPA TRTED——
LOPMENT PROJECT
igoment Team
Page 1 of 3
n {
1 | 21.07.08 |F Kunstoin YW. Stumpf Ah |r. Suckul Ka [Approval or Use
01 | 17.03.03 |F.Kunstein_[W.Stumpr |r. Sucku) |For Implementation
fev] ooto | Proparea | cheaed | Approved | Dasrton o Revion
PROTECTENGINEERING QUERIES
Procedure No. GS-MO-Q-PR-00-014 Page 2 of 3
(css
FERROSTAAL|
Revision C1, dated 21.07.2003 nduniaranen|
10
20
3.0
34
32
33
PURPOSE
‘The purpose of this procedure is to describes the method for resolving engineering queries,
which relate to the contents of technical documents in order to ensure that:
+ the queries are handled by qualified personnel involved in preparing the documents which
are the subject of the query
* distributed to parties concerned
* answers are prepared on schedule
‘+ results are resubmitted to the originator.
SCOPE
This procedure is to be used by the PEM for resolving engineering queries for the LASMO
project. These may originate from:
+ Site
Vendors
+ Subcontractors,
DEFINITIONS AND ABBREVIATIONS
DEFINITIONS
ABBREVIATIONS,
DCN — - Design Change Notice
EP —_-_ Engineering Partner
Le - Lead Engineer
P ~ Partner in intemal consortium
PM — Project Manager
PEM — - Project Engineering Manager
SM Site Manager
ABBREVIATIONS FOR DISCIPLINES
cs - cw
ELECT - Electrical
INS = Instrumentation and Control
LP + Layout Planning
ME = Mechanical Equipment
MP - Mechanical Piping
PE Process Engineering
GrRocrProcedure No. GS-MO-Q-PR-00-014 Page 3 of 3
ENGINEERING QUERIES MAN
Revision C1, dated 21.07.2003 fecmiion
4.0 RESPONSIBILITIES
5.0
6.0
7.0
‘The preparation, checking and approval of the subject management procedure is described in
Project Quality Management Plan GS-MO-Q-CA-00-001 section 7.0
‘The SM is responsible for the implementation of and compliance with the procedure.
PROCEDURE
The activities and responsibilities pertaining to design changes are described in the flow dia-
gram in Attachment AO1.
REFERENCE DOCUMENTS
Contractor's Project Procedures:
GS-MO-Q-0A-00-001-01 Project Quality Management Plan
GS-MO-Q-PR-00-001-01 Identification of Documents
GS-MO-Q-PR-00-004-01 Identification of Units, Equipment and Instrumentation
Contractor's Standard Procedures
MGO-Q-QA-001 Preparation, Review and Approvel of QM Documents
MGO-Q-QA.002 Identification of QM Documentation
MGO-P-VA-153 Contract Changes.
DISTRIBUTION
Originals (signed paper copies) of the procedure will be kept at DCC in Gelsenheim
Availabilty to project members as follows:
‘+ Geisenheim : Electronic files under H:\Project\Lasmo_gosp\Quality. pqm\Procedures
‘© Site Office: Issue of controlled copy documents to Site DCC.
GPR oTProcedure No. GS-MO-Q-PR-00-014
Attachment A01, Page 1 of 1
F.NC-174
‘om, (Elephant) Development Project - GOSP. frehnostaa
Semen
‘etraoi0.01 ENGINEERING QUERIES Sai
FLOW DIAGRAM
Engineering Queries
oe
Sant or
em] Bed ase ese
eS — eager
<=> eared
fa Fae (2 6 Reply son contain spprepeae
‘SoS Ose, =
ee
OPROMCT-ADT
@
Pepsin pty
H
:
To me “aeeoe
ringonte Ee see
ei caceriet
Seana
i
ranting Qaes
21.07:2008, LoMer-01-0-0002Procedure No. GS-MO-Q-PR-00-014
Attachment A02, Page 1 of 4
F-NC-174 (ew
MAN
oa) (Elephant) Development Project - GOSP
ero
eaeieor ENGINEERING QUERIES 520.03 21270
TECHNICAL QUERY SHEET
: ‘Alin T Mesrvan
Query No. : Moerra-oo ae
‘Company 1 LASMO Grand Maghreb Lid. (LGML) | LGML Contract No. : LASIFA74/t0-01
Contractor MAN Ferrostaal Industrieanlagen (MOG) | MAN Contract No. : 620002 24270
Project = LASMO-GOSP
Subject
— - al
Date | _Propared by ‘Approved by :
MAN Ferrostaal Industrieanlagen GmbH
Use LGMLEF.08
apRotectanz 2.07:2003
LGMmer-08-0.0308,Attachment A03, Page 1 of 1
Procedure No. GS-MO-Q-PR-00-014-C1
osrssno7 eme10 nau covtonioweo
yueoydde soyenuos | ictooer | on aor |g
oe 1 fidas jo a1ea banal rans jsopuen | joa | -onog | ONKNO
02242 Z0 0zs LO-OLO/PLL-4
Eye me YALSIOY ANAND ONYSINIONA pe lelddatl
ewe
Tuvsowus3| dS09 - }90[oig juowdojanog (jueydey3)
PLL-ON-A