C4-Interier Composite Beam Perpendicular
C4-Interier Composite Beam Perpendicular
Input Data
Shear studs Formed steel deck
Wt. of Composite deck = 360 kg/m2
Live load = 100 kg/m2
Installations = 0 kg/m2 t
s
t
eff.
Fy = 3450 kg/cm 2 t
tf
Long. Stud Spacing = 60.00 cm
Span = 13.20 m
STEEL BEAM
Spacing of beams = 2.55 m d
w
fc` = 400 kg/cm2
Es = 2100000 kg/cm2
t
bf
Steel section
h= 44.98 cm Web area = 32.53 cm2
tw = 0.76 cm As = 65.75 cm2
btf = 15.24 cm Ys = 22.49 cm (from bot. of steel
ttf = 1.09 cm Is = 20968.53 cm4
bbf = 15.24 cm Ss top = 932.35 cm3
tbf = 1.09 cm Ss bot. = 932.35 cm3
Concrete deck
Total slab thickness over steel , t s = 13 cm
Effective slab thickness , t eff. = 11 cm
c.g. of effective concrete deck , yc = 7.5 cm (from top of steel)
Dimensions of formed deck & studs
w
hr = 2.36 in. r
Hs = 5.12 in.
Hs £(hr+3) Take Hs = 5.12 in. H
s h
wr = 5.00 in. r
Nr = 1.00 studs/row
Nr £ 3 Take Nr = 1.00 studs/row
Ec = 302276 kg/cm2
n (short term) = 6.95 n (long term) = 20.84
Effective slab width
1) Span/4 = 3.30 m
2) Spacing = 2.55 m
3) 12 ts+btf = 1.47 m
B eff. = 1.47 m
Design
Total Dead Load = 969.61 kg/m`
M DL. = 21.12 m.t.
M Inst. = 0.00 m.t.
M LL. = 5.55 m.t.
ys
f
bottom
B
eff.
f
1c
t
y s f
c 2c
f
3s
ytrans.
f 4s
Vh = 0.85*fc`*Ac/2
= 275338.80 kg
Vh = As* Fy/2
= 113420.82 kg
Vh min. = 113420.82 kg (I4 - 2) gverns
Vh/4 = 28355.21 kg Limit of Composite Action
Input Data
Shear studs Formed steel deck
t t
s eff.
t
tf
STEEL BEAM
d
w
t
bf
References
ACI (8.5.1)
(I4 - 2)
Table I4.1
Table I4.2
(I5 - 1)
(I2 - 1)