(See QW-201.1, Section IX, ASME Boiler and Pressure Vessel Code)
Company Name INDUSTRIAL CADRE FOR OPERATION AND By: Arslan Waheed
MAINTENANCE
Welding Procedure Specification No. 11-A-01-2016 Date 08.02.2016 Supporting PQR No.(s) 11-A/B-169-2002
:
Revision No. 0 Date 08.02.2016
Welding Process(es) GTAW Type (s) Manual
(At the option of the Mfgr., sketches may be attached to illustrate joint FIG D (LAP JOINT) FIG E (TEE JOINT)
design, weld layers and bead sequence, e.g., for notch toughness proc-
dures, for multiple process procedures etc.)
OR
Chem. Analysis and Mech. Prop. N/A
to Chem. Analysis and Mech. Prop. N/A
Thickness Range: 1.5mm - 11.08mm
Base Metal: Groove ALL Fillet ALL
Other
Maximum Pass Thickness 1/2 inch (13 mm) (Yes) (No)
TECHNIQUE (QW-410)
String or Weave Bead String or Weave
Orifice or Gas Cup Size 5,6
Initial and Interpass Cleaning (Brushing, Grinding, etc.) Brushing or Grinding
Method of Back Gouging Grinding/Gouging
Oscillation N/A
Contact Tube to Work Distance N/A
Multiple or Single Pass (per side) Multiple
Multiple or Single Electrodes Multiple
Travel Speed (Range) ---
Peening N/A
Other No Single Pass To Exceed 1/2" In Thickness Pulsed Power Supply not permitted
Flux is not to be added to the face of the joint
Filler Metal Current
Other
(e.g., Remarks, Com-
Weld Travel
Type and Amperage Voltage ments, Hot Wire
Layer(s) or Process Classification Diameter. Speed
Polarity Range Range Addition, Technique,
Pass (es) Range
Torch Angle, Etc.)