100% found this document useful (1 vote)
582 views8 pages

Trainee's Record Book

This document appears to be a trainee's record book for an electrical installation and maintenance training program. It contains information about the trainee such as their name and photo, as well as details about the training program such as the duration, trainer, and location. The document outlines the vision, mission, and house rules of the training center. It also lists the required competencies that the trainee will learn, including performing rough-in activities, installing protective devices, and installing wiring devices. The trainee will record their tasks, accomplishments, and reflections in the book to document their progress and learning throughout the program.

Uploaded by

Rico Esponilla
Copyright
© © All Rights Reserved
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
Download as docx, pdf, or txt
100% found this document useful (1 vote)
582 views8 pages

Trainee's Record Book

This document appears to be a trainee's record book for an electrical installation and maintenance training program. It contains information about the trainee such as their name and photo, as well as details about the training program such as the duration, trainer, and location. The document outlines the vision, mission, and house rules of the training center. It also lists the required competencies that the trainee will learn, including performing rough-in activities, installing protective devices, and installing wiring devices. The trainee will record their tasks, accomplishments, and reflections in the book to document their progress and learning throughout the program.

Uploaded by

Rico Esponilla
Copyright
© © All Rights Reserved
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
Download as docx, pdf, or txt
Download as docx, pdf, or txt
You are on page 1/ 8

Allen, Northern Samar

I.D. Picture
(passport size)

TRAINEE’S RECORD BOOK


NAME:
TESDA-BCAT
Magallanes St., Sabang ll, Allen Northern Samar QUALIFICATION: ELECTRICAL INSTALATION AND
MAINTENANCE NC II
E-mail Address:

NORMAL 196 HOURS


DURATION:

TRAINER: ABERTANO RICHARD PUASO


CABACANG

YEAR: 2019

TECHNICAL EDUCATION AND SKILLS DEVELOPMENT AUTHORITY


Region VIII
BALICUATRO COLLEGE OF ARTS AND TRADES
EIM NCII-arpc Page 1
VISION……..

Balicuatro College of Arts and Trades is a leading


technology institution that envisions to develop
wholesome, and world-class productive workforce imbued
with positive work values.

MISSION……..
Balicuatro College of Arts and Trades offers and
delivers relevant competency based training program to
equip trainees for local and overseas employment.

EIM NCII-arpc Page 2


HOUSE RULES AND REGULATIONS
INSTRUCTIONS: 1. Entrance gate of the Training Center shall be opened at exactly
6:00 o’clock in the morning and closed at 9:00 o’clock in the
evening from Monday to Friday.
This Trainee’s Record Book (TRB), is intended to serve as record
2. Attendance is a must in Flag Ceremony every Monday morning
of all accomplishment / task / activities while undergoing training and Flag Retreat every Friday afternoon.
in ELECTRICAL INSTALLATION AND MAINTENANCE (EIM) NC II. 3. Schedule of training in Electrical Installation and Maintenance
This will eventually become evidence that can be submitted for NCII from Monday to Friday at 8:00am to 12:00am in morning
portfolio assessment and for whatever purpose it will serve you. It session and 1:00pm to 5:00pm in afternoon session.
is therefore important that all its contents are viably entered by 4. Wearing ID’s is a MUST at all times.
5. Observe proper uniform Mon, Tues, Thu and Fri. Washday for
both the trainees and instructor. This Trainee’s Record Book
Wednesday.
(TRB), contains as the required competencies in your chosen 6. Smoking is not allowed inside the workplace premises.
qualification. All you have to do is to fill in the column “TASK 7. Vandalism (writing on tables, chairs, and walls) is strictly
REQUIRED” and “DATE ACCOMPLISHED” with all the activities in prohibited.
8. Detaching and destroying any part of the building is strictly
accordance with the training program and to be taken up in the
prohibited.
school and with the guidance of the Instructor. The Instructor will 9. Alcoholic beverage, prohibited drugs, and deadly weapon are
likewise his/her remarks on the “Instructor Remarks” column strictly prohibited inside the training center or workplace
regarding the outcome of the task accomplished by the trainees. premises.
10. Gambling or any forms of money games is strictly prohibited.
Be sure that the trainee will presently accomplish the task and
11. Proper used of Tools and Materials.
confirmed by the Instructor. It is great importance that content 12. Proper haircut shall be enforced.
should be written legibly on ink. Avoid any corrections or erasures 13. Wearing of earing and pierce are not allowed for male trainee
and maintain the cleanliness of this record. while inside the workplace.
14. No horse playing while in the demonstration of task.
15. Observe maintenance of the Tools and Materials and workplace.

Thank you,

EIM NCII-arpc Page 3


Unit of Competency:
Perform roughing-in activities, wiring and
cabling works for single phase distribution, power, lighting
and auxiliary systems.

Learning Task/Activity Date Trainee’s Trainer’s Trainer’s


Outcome Required Accompl Signature Signature Remark
ished

EIM NCII-arpc Page 4


Unit of Competency:
Install electrical protective devices for
distribution, power, lighting, auxiliary, lightning protection
and grounding systems.

Learning Task/Activity Date Trainee’s Trainer’s Trainer’s


Outcome Required Accompl Signature Signature Remark
ished

EIM NCII-arpc Page 5


Unit of Competency: Trainee’s Reflection of the Program
Install wiring devices of floor and wall mounted
outlets, lighting fixtures/switches, and auxiliary outlets. The trainee’s reflection of the session should be true and
unbiased in expressing his/her learning experiences during industry
immersion period.
Learning Task/Activity Date Trainee’s Trainer’s Trainer’s
Outcome Required Accompl Signature Signature Remark
ished ___________________________________________________________________________________
___________________________________________________________________________________
___________________________________________________________________________________
___________________________________________________________________________________
___________________________________________________________________________________
___________________________________________________________________________________
___________________________________________________________.

EIM NCII-arpc Page 6


EIM NCII-arpc Page 7
EIM NCII-arpc Page 8

You might also like