0% found this document useful (0 votes)
124 views5 pages

National Irrigation Administration: Enrico T. Castro

This document contains three notices from the National Irrigation Administration (NIA) to construction companies regarding delays or negative slippages in their projects. The first notice is to Enrico Castro and Marcos Castro, informing them that their respective projects have incurred a 4.29% negative slippage, falling under the "Early Warning Stage". They are directed to submit a biweekly catch-up plan. The second notice is to Loreta Ignacio, informing her that her project has a 5% negative slippage, in the "Early Warning Stage", and directing her to submit a biweekly catch-up plan. The third notice is to Noli Venzon, informing him that his project has

Uploaded by

Jeline Reyes
Copyright
© © All Rights Reserved
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
Download as docx, pdf, or txt
0% found this document useful (0 votes)
124 views5 pages

National Irrigation Administration: Enrico T. Castro

This document contains three notices from the National Irrigation Administration (NIA) to construction companies regarding delays or negative slippages in their projects. The first notice is to Enrico Castro and Marcos Castro, informing them that their respective projects have incurred a 4.29% negative slippage, falling under the "Early Warning Stage". They are directed to submit a biweekly catch-up plan. The second notice is to Loreta Ignacio, informing her that her project has a 5% negative slippage, in the "Early Warning Stage", and directing her to submit a biweekly catch-up plan. The third notice is to Noli Venzon, informing him that his project has

Uploaded by

Jeline Reyes
Copyright
© © All Rights Reserved
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
Download as docx, pdf, or txt
Download as docx, pdf, or txt
You are on page 1/ 5

Republika ng Pilipinas

National Irrigation
Administration
(PambansangPangasiwaan ng Patubig
Region Office No. III
Office Address: Jefmin, Concepcion, Tarlac
Telephone Nos.: (045) 491-4323 Telefax No. (045) 491-4323
Email Address: niatarzam.imo@gmail.com TIN No. 206-008-273-000

June 15, 2020

ENRICO T. CASTRO
General Manager
E.T. Castro Construction and Supplies
Dau, Mabalacat City, Pampanga

SUBJECT : Notice for the Negative Slippage


1st Warning (Early Warning Stage)

Dear Mr. Castro;

This refers to your contract NIAR3-TARZAM-2020-51-STA.CRUZ CIP located in San Jose,


Tarlac. Please be informed that as of June 15, 2020 you have incurred a negative slippage
of (-) 4. 29 %, which now falls under the “Early Warning Stage” pursuant to NIA
Memorandum Circular No. 40, Series of 2017 – Administrative Action on Contract with
Negative Slippages in accordance with the Revised IRR of R.A. 9184.

Based on the approved PERT/CPM Network, the planned accomplishment is_4.29%


while your actual accomplishment is only 0.00%.

In view hereof, you are hereby directed to submit a detailed “catch-up” program on
fortnightly (two weeks) basis to eliminate the slippage.

In the action program being required, specify therein the additional input resources such
as money, manpower, materials, equipment and management to cope up and meet the
desired result accordingly.

Your immediate compliance on this matter is hereby sought.

Very truly yours,

JAIME A. MANANGHAYA
Acting Manager, TARZAM IMO
Republika ng Pilipinas

National Irrigation
Administration
(PambansangPangasiwaan ng Patubig
Region Office No. III
Office Address: Jefmin, Concepcion, Tarlac
Telephone Nos.: (045) 491-4323 Telefax No. (045) 491-4323
Email Address: niatarzam.imo@gmail.com TIN No. 206-008-273-000

June 15, 2020

MARCOS T. CASTRO
General Manager
EXPE Construction and Trading
Dau, Mabalacat City, Pampanga

SUBJECT : Notice for the Negative Slippage


1st Warning (Early Warning Stage)

Dear Mr. Castro;

This refers to your contract NIAR3-TARZAM-2020-50-BOTBOTONES CIP located in


Santa Ignacia, Tarlac. Please be informed that as of June 15, 2020 you have incurred a
negative slippage of (-) 4. 29 %, which now falls under the “Early Warning Stage”
pursuant to NIA Memorandum Circular No. 40, Series of 2017 – Administrative Action on
Contract with Negative Slippages in accordance with the Revised IRR of R.A. 9184.

Based on the approved PERT/CPM Network, the planned accomplishment is_4.29%


while your actual accomplishment is only 0.00%.

In view hereof, you are hereby directed to submit a detailed “catch-up” program on
fortnightly (two weeks) basis to eliminate the slippage.

In the action program being required, specify therein the additional input resources such
as money, manpower, materials, equipment and management to cope up and meet the
desired result accordingly.

Your immediate compliance on this matter is hereby sought.

Very truly yours,

JAIME A. MANANGHAYA
Acting Manager, TARZAM IMO

June 05, 2019


Republika ng Pilipinas

National Irrigation
Administration
(PambansangPangasiwaan ng Patubig
Region Office No. III
Office Address: Jefmin, Concepcion, Tarlac
Telephone Nos.: (045) 491-4323 Telefax No. (045) 491-4323
Email Address: niatarzam.imo@gmail.com TIN No. 206-008-273-000

MA. LORETA U. IGNACIO


General Manager
Three k Builders
Urdaneta City, Pangasinan

SUBJECT : Notice for the Negative Slippage


1st Warning (Early Warning Stage)

Dear Ms. Ignacio;

This refers to your contract NAR3-TARZAM-2020-19-BALUTU-2 CIS located in


Concepcion, Tarlac. Please be informed that as of May 31,2019 you have incurred a
negative slippage of (-) 5%, which now falls under the “Early Warning Stage” pursuant
to NIA Memorandum Circular No. 40, Series of 2017 – Administrative Action on Contract
with Negative Slippages in accordance with the Revised IRR of R.A. 9184.

Based on the approved PERT/CPM Network, the planned accomplishment is_5.00%


while your actual accomplishment is only 0.00%.

In view hereof, you are hereby directed to submit a detailed “catch-up” program on
fortnightly (two weeks) basis to eliminate the slippage.

In the action program being required, specify therein the additional input resources such
as money, manpower, materials, equipment and management to cope up and meet the
desired result accordingly.

Your immediate compliance on this matter is hereby sought.

Very truly yours,

JAIME A. MANANGHAYA
Acting Division Manager

22, 2019

NOLI A. VENZON
General Manager
E.R. Venzon Construction
Sta. Cruz, Lubao, Pampanga

SUBJECT : Notice for the Negative Slippage


Final Warning (ICU Stage)

Dear Mr. Venzon;


Republika ng Pilipinas

National Irrigation
Administration
(PambansangPangasiwaan ng Patubig
Region Office No. III
Office Address: Jefmin, Concepcion, Tarlac
Telephone Nos.: (045) 491-4323 Telefax No. (045) 491-4323
Email Address: niatarzam.imo@gmail.com TIN No. 206-008-273-000

This refers to your contract PAMBAT-RRECIS-CIS-2018-BAT-ABU ABO -25M -27 ABU


ABO CIS located in Balanga, Bataan. Please be informed that as of May 15, 2019, you
have incurred a negative slippage of (-)13.00% which now falls under the “ICU Stage”
pursuant to NIA Memorandum Circular No. 40, Series of 2017 –Administrative Action on
Contract with Negative Slippages in accordance with the Revised IRR of R.A. 9184.

Based on the approved PERT/CPM Network, the planned accomplishment is 18.00%


while your actual accomplishment is only 5.00%.

In view hereof, you are hereby directed to submit a more detailed program of activities
with weekly physical targets, together with additional input resources to accelerate your
work accomplishment and reduce the slippage over a defined time period.

On-site supervision shall likewise be intensified and evaluation of project performance


shall be done at least once a week.

Your immediate compliance on this matter is hereby sought.

Very truly yours,

ISABELITO V. BITANGCOL
Acting Division Manager

June 20, 2019

NOLI A. VENZON
General Manager
E.R. Venzon Construction
Sta. Cruz, Lubao, Pampanga

SUBJECT : Notice for the Negative Slippage


(Terminal Stage)

Dear Mr. Venzon;

This refers to your contract PAMBAT-RRECIS-CIS-2018-BAT-ABU ABO -25M -27 ABU


ABO CIS located in Balanga, Bataan. Please be informed that as of June 15, 2019, you
have an actual accomplishment of 5.00% versus the planned accomplishment of
21.00% thus, you have incurred a negative slippage of -16.00% due to your fault caused
by limited equipment, materials, manpower which now falls under the “Terminal
Stage”.

Pursuant to Section III. A.2 of Annex I of R.A. 9184 and NIA Memo randum Circular No.
40, Series of 2017 – Administrative Action on Contract with Negative Slippages in
accordance with the Revised IRR of R.A. 9184, the implementing office shall initiate the
termination of contract.

In view hereof, you are hereby directed to “show cause” within seven (7) calendar days
from receipt hereof why your contract should not be terminated, pursuant to Section
IV.3 of Annex I of the Revised IRR of R.A. 9184.
Republika ng Pilipinas

National Irrigation
Administration
(PambansangPangasiwaan ng Patubig
Region Office No. III
Office Address: Jefmin, Concepcion, Tarlac
Telephone Nos.: (045) 491-4323 Telefax No. (045) 491-4323
Email Address: niatarzam.imo@gmail.com TIN No. 206-008-273-000

Your immediate compliance on this matter is hereby sought.

Very truly yours,

ISABELITO V. BITANGCOL
Acting Division Manager