Tutorial 09-Quality and Process PDF
Tutorial 09-Quality and Process PDF
Problem 1: Use Pareto analysis to investigate the following data collected on a printed-circuit-board
assembly line:
(a) Prepare a graph of the data and (b) What conclusions do you reach?
Problem 2: A list of 16 issues that led to incorrect formulations in Mary’s jam manufacturing plant is provided
below:
List of Issues
1. Incorrect measurement 9. Variability
2. Antiquated scales 10. Equipment in disrepair
3. Lack of clear instructions 11. Technician calculation off
4. Damaged raw material 12. Jars mislabelled
5. Operator misreads display 13. Temperature controls off
6. Inadequate clean-up 14. Incorrect weights
7. Incorrect maintenance 15. Priority miscommunication
8. Inadequate flow controls 16. Inadequate instructions
Create a fish-bone diagram and categorize each of these issues correctly, using the “four Ms” method.
Problem 3: A recent Gallop poll of 519 adults who flew in the past year (published in The Economist, June
16, 2007, p. 6) found the following their number 1 complaints about flying: cramped seats (45), cost (16),
dislike or fear of flying (57), security measures (119), poor service (12), connecting flight problems (8),
overcrowded planes (42), late planes/waits (57), food (7), lost luggage (7), and other (51).
Abstracted from Heizer, J., and Render, B,. Operations Management, 8e, 2006. Pearson. 1
Problem 4: What type of process strategy must be more effective for making each of the following
products?
i. Beer
ii. Wedding invitations
iii. Automobiles
iv. Paper
v. Big Macs
vi. Motorcycles
Problem 5: Discuss on a probable Service Blueprint for service at a University enrollment office. The three
levels of interaction is a mandatory requirement for developing a service blueprint, while the other
categories are subjective.
Problem 6: Identify specifically service based firms that compete on each of the four processes
1. Process Focus
2. Repetitive
3. Product Focus
4. Mass Customization.
Problem 7: Meile Machine Shop, Inc., has a 1-year contract for the production of 200,000 gear housings
for a new off-road vehicle. Owner Larry Meile hopes the contract will be extended and the volume
increased next year. Meile has developed costs for three alternatives. They are general purpose equipment
(GPE), flexible manufacturing system (FMS), and expensive, but efficient, dedicated machine (DM). The
cost data follow:
General- Flexible Dedicated
purpose Manufacturing Machine
Equipment System (DM)
(GPE) (FMS)
Annual contracted units 200,000 200,000 200,000
Annual fixed cost $100,000 $200,000 $500,000
Per unit variable cost $15 $14 $13
Abstracted from Heizer, J., and Render, B,. Operations Management, 8e, 2006. Pearson. 2