0% found this document useful (0 votes)
393 views1 page

OPTIMA Test Procedure PDF

1. The document provides step-by-step instructions for performing a urine test using the Uriscan OptimaII Urine Analyzer, including calibrating the instrument, running quality control tests, collecting and preparing a urine sample strip, running the test, and interpreting results. 2. Calibration and quality control testing should be performed periodically and when test results are in doubt to ensure proper instrument function. 3. To run a urine test, a strip is dipped in urine and placed in the instrument, which then analyzes the strip over 11/2 minutes and prints out the results.
Copyright
© © All Rights Reserved
Available Formats
Download as PDF, TXT or read online on Scribd
Download as pdf or txt
0% found this document useful (0 votes)
393 views1 page

OPTIMA Test Procedure PDF

1. The document provides step-by-step instructions for performing a urine test using the Uriscan OptimaII Urine Analyzer, including calibrating the instrument, running quality control tests, collecting and preparing a urine sample strip, running the test, and interpreting results. 2. Calibration and quality control testing should be performed periodically and when test results are in doubt to ensure proper instrument function. 3. To run a urine test, a strip is dipped in urine and placed in the instrument, which then analyzes the strip over 11/2 minutes and prints out the results.
Copyright
© © All Rights Reserved
Available Formats
Download as PDF, TXT or read online on Scribd
Download as pdf or txt
Download as pdf or txt
You are on page 1/ 1

TEST PROCEDURE

URISCAN OPTIMAII URINE ANALYZER

Calibration should be performed when: Press “Measure”


Measure icon on the Press mode select button on
1. Changing an item/product touch LCD to start test. the measure menu
lot number. for “Routine Test Mode”.
2. The test results are in doubt or
different results are obtained
than expected using quality
control materials.
Refer to section 5.4 of the Operator’s
Manual for complete calibration
procedures. If any error codes are
displayed during calibration,
calibration see
Section 6.7 of the Operator’s Manual
for sources of error, and retry calibration.

Remove excess liquid by


gently blotting the strip
against a paper towel.
Remove one strip Verify all pads have been
from the strip saturated. If not, repeat
container. Dip the strip into the step 4.
tube until all pads
are wet (<1 second).

Place the strip on the platform as The instrument will show a When the test is done, the
shown, with the top of the strip progress bar for about 1½ printer will print the results.
touching the guide near the top of minutes while the test is taking
the platform. A little bit of the strip place.
will hang over the bottom end of the
platform. Then press “START”.

For Technical Service:


Performance check using control Clean guide plate area daily
solutions should be conducted: oor more
o e often
o te if sediment
sed e t iss
1. Every 30 days; seen, using soft gauze and
2. Upon opening a new bottle of strips; distilled water.
3. When training instrument operator;
4. Whenever test results are in doubt.
If performance check falls outside of the
expected values, see Section 6.5 of the
Operator’s Manual for sources of error.
Retry performance check after addressing
source of error as described in Section 6.5.