0% found this document useful (0 votes)
25 views

Risks Type Probability Impact

Your task is to create a table of risks for laboratory work 10 that names each risk, its type, probability of occurring, and impact level. The table should include specific risks to your project, with examples provided of risks related to estimates, users, reuse, end users, deadlines, funding, requirements, technology, training, experience, and turnover. Each team member should explain the risks and ways to avoid them when presenting the lab.

Uploaded by

Naski Kuafni
Copyright
© © All Rights Reserved
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
25 views

Risks Type Probability Impact

Your task is to create a table of risks for laboratory work 10 that names each risk, its type, probability of occurring, and impact level. The table should include specific risks to your project, with examples provided of risks related to estimates, users, reuse, end users, deadlines, funding, requirements, technology, training, experience, and turnover. Each team member should explain the risks and ways to avoid them when presenting the lab.

Uploaded by

Naski Kuafni
Copyright
© © All Rights Reserved
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 1

Lab 10

Your task for laboratory work 10 is to create table of risks.


Note that your table should name of the risk, type of the risk, probability of rising,
and the level of its impact to the plan. While defensing this lab, every team
member should explain about risks and possible ways to avoid them.
Example given:
Risks Type Probability Impact
Size estimate may be PR 60% 2
significantly low
Larger no of users than PR 30% 3
planned
Less reuse than planned PR 70% 2
End users resist system BR 50% 3
Delivery deadline will BR 40% 2
betightened
Funding will be lost BR 50% 1
Customer will change PR 80% 2
requirements
Technology will not meet TR 30% 1
expectations
Lock of training on tools TR 80% 3
Staff inexperienced SR 30% 2
Staff turnover will be high SR 60% 2

In this table there are only examples. Each of your projects include specific risks

You might also like