Design-Build Comprehensive Quality Plan & Manual Sample: Selected Pages Sample Includes
Design-Build Comprehensive Quality Plan & Manual Sample: Selected Pages Sample Includes
Contact:
First Time Quality
410-451-8006
www.firsttimequalityplans.com
Pat
[CompanyName]
Design-Build Construction
Quality Assurance/Quality Control Plan
s
[ProjectName]
ge
[ProjectNumber]
Pa
Effective Date: [Date]
Approved
ct
_____________________________________________________
[QualityManagerName], Quality Manager
le
Se
Customer .................................................................................................................................................... 7
Project Name .............................................................................................................................................. 7
Project Number .......................................................................................................................................... 7
Project Location .......................................................................................................................................... 7
Overall Project Description ......................................................................................................................... 7
[CompanyName] Scope of Work ................................................................................................................ 7
s
Project Quality Assurance/Quality Control Plan Overview ...................................................................... 12
ge
C. Project Quality Coordination and Communication ............................................................................. 13
D. Project QC Personnel ......................................................................................................................... 17
G. Qualification of Third Party Inspection/Testing Companies and Subcontractors and Suppliers ......... 27
Page 5
[ProjectName] - [ProjectNumber]
Copyright
Questions? Call First Time Quality 410-451-8006
s
Q. Quality Assurance Surveillance .......................................................................................................... 62
ge
Project Quality Performance Surveillance ................................................................................................ 62
Project Quality Audits ............................................................................................................................... 62
Project Audit Plan ..................................................................................................................................... 63
Pa
Project Audit Requirements ..................................................................................................................... 63
Page 6
[ProjectName] - [ProjectNumber]
Copyright
Questions? Call First Time Quality 410-451-8006
J. DESIGN CONTROLS
Construction design controls are in place to assure the quality of construction designs for this project.
A design plan is used to document the design control process. The Design Plan is included as an exhibit in
this subsection.
The first control point will be of the review of design inputs. The Design Manager will assure that all
necessary information is available to perform the required design work. The Design Manager will also
assure that expectations for design outputs are well defined.
Intermediate reviews will be carried out as indicated on the design control plan. The last review is the
design output review.
A record of all reviews will be recorded on the Design Review form. A Design Review form exhibit is
included in this subsection.
The President has appointed [DesignManagerName] as the Design Manager. [DesignManagerName] will
s
control the design process with specific quality responsibilities, duties, and the authority to carry them
ge
out.
DESIGN REVIEWS Pa
DESIGN INPUT REQUIREMENTS REVIEW
The Quality Manager ensures that the information in design inputs clearly defines customer expectations
and that the necessary details are provided to set requirements for design.
ed
The Quality Manager obtains design specifications from the customer and conducts a customer design
input review to ensure that:
ct
• Customer design output requirements and specifications are complete for review milestones as
well as the completed design
Se
• Customer design requirements and specifications are compatible with the relevant regulations,
[CompanyName] quality standards, and Quality System requirements
• [CompanyName] has the capability to deliver the completed design in the time allotted
The Quality Manager identifies supplemental design specifications that supplement customer
specifications when they are needed to ensure a quality design.
Before design work begins, the Quality Manager makes sure that all design requirements are clearly
understood, all discrepancies are resolved, and all requirements are agreed upon. Once these
requirements are met, the Quality Manager approves the design input.
The Quality Manager ensures that design input documents are verified by qualified personnel. The
person responsible must verify:
Page 35
[ProjectName] - [ProjectNumber]
Copyright
Questions? Call First Time Quality 410-451-8006
• [CompanyName] has the capability to deliver the completed project in the time allotted
The Quality Manager holds review meetings with interested parties at key design milestones. The Quality
Manager identifies the key design milestones, the design output required for the review, and a list of
reviewers.
Two design reviews are required: one is an input design review and the other is the final design review.
The Quality Manager identifies other design reviews necessary to ensure a quality result. Design reviews
may be specified at the completion of design work tasks, site assessments, preliminary engineering,
preliminary design, percentage completion stages, and on a calendar schedule.
The Quality Manager identifies customer and company reviewers appropriate for each design milestone.
Reviewers may include persons that have a stake in any of the following: quality, safety, constructability,
scheduling, maintenance, purchasing, estimating, or cost control.
At each review, the Quality Manager reviews reviewer recommendations for amendments to the design
specifications. The Quality Manager submits selected design amendments for customer approval.
Customer approved design amendments are design requirements.
s
DESIGN OUTPUT REVIEWS
ge
The Quality Manager ensures that design output documents are verified by qualified personnel
independent of the person performing the work. The person responsible must verify:
Pa
• The completed design meets requirements specified by the design input
• The completed design meets approved design amendments
• Engineering calculations are correct
• Completeness of records per the Design Project Quality Assurance/Quality Control Plan including
ed
The Quality Manager prepares a project-specific design review plan that includes:
le
• A listing of company and customer stakeholders, reviews they will participate in, and how their
input will be used to amended design requirements. The project organization chart Includes
Se
interfaces between various groups and personnel for producing and reviewing the design.
• Design output deliverables, including required drawings, and engineering calculations
• Identification of who will perform design output verification activities and the criteria they will
use.
• The Quality Manager reviews the design process project plan with the customer and other
interested parties. The customer approves the plan after any discrepancies are resolved and the
plan is agreed upon. Design work may begin only after the customer approves the plan.
Page 36
[ProjectName] - [ProjectNumber]
Copyright
Questions? Call First Time Quality 410-451-8006
[CompanyName]
Design Review Form
Project ID Project Name Design Review Ref# Date
[ProjectNumber] [ProjectName]
Review milestone: Performing Department/Crew/Subcontractor and Supplier:
s
Review recommendations
ge
Item# Recommendation [CompanyName] Customer
(reference supporting documents) Acceptance/ Rejection Acceptance/ Rejection
Signature / Date: Signature / Date:
Pa
Approved
Disapproved
Approved
Disapproved
Approval not required
ed
Approved Approved
Disapproved Disapproved
Approval not required
ct
le
Approved Approved
Disapproved Disapproved
Approval not required
Se
Approved Approved
Disapproved Disapproved
Approval not required
Page 38
[ProjectName] - [ProjectNumber]
Copyright
Questions? Call First Time Quality 410-451-8006
For each type of quality-controlled material, the Quality Manager determines lot control traceability
requirements, if any, and specifies the means of lot identification. Identification methods may include
s
physical labels, tags, markings and/or attached certification documents.
ge
When lot-controlled materials are received, the Superintendent verifies that materials have the specified
lot identifications.
The Superintendent maintains lot identification at all production phases from receipt, through production,
Pa
installation, or assembly, to final completion. Acceptable methods for preserving lot identification include
physically preserving observable lot identifications, recording the lot identification on a work task quality
inspection form or other work record, or collecting the physical lot identifier as a record along with
supplemented with location.
ed
If lot-controlled materials are without lot identification, the Superintendent deems the materials as
nonconforming and segregates them and/or clearly marks them to prevent inadvertent use. The
ct
Superintendent treats the material according to the company policy for nonconformances. Only the
Quality Manager can re-identify or re-certify the materials.
le
When lot-controlled materials are received, the Operations Manager inspects the materials and verifies
that materials have the specified lot identifications. Received materials are listed on the Material
Receiving and Inspection Report form or Metals Materials Receiving and Inspection form included as an
exhibit in this subsection.
Material quality inspections and tests ensure that purchased materials meet purchase contract quantity
and quality requirements. The Superintendent inspects or ensures that a qualified inspector inspects
materials prior to use for conformance to project quality requirements.
The Superintendent ensures that each work task that uses the source-inspected materials proceed only
after the material has been accepted by the material quality inspection or test.
Page 37
[ProjectName] - [ProjectNumber]
Copyright
Questions? Call First Time Quality 410-451-8006
[CompanyName]
Controlled Materials Form
Contract ID Contract Name Preparer Date
[ProjectNumber] [ProjectName]
Contract Section/ Activity Intended Use Lot Traceability Method for identification of
s
ID Material (if description is necessary) Requirements Approved Inspection Status
ge
Pa
ed
ct
le
Se
Page 38
[ProjectName] - [ProjectNumber]
Copyright
Questions? Call First Time Quality 410-451-8006
[CompanyName]
Metals Material Receiving Inspection Report
Project ID Project Name P.O.# Supplier Receipt Date
[ProjectNumber] [ProjectName]
Type of Material Material Description Heat Number/ Condition / Damage Color Code Marking
(i.e., steel plate) (nominal dimensions) Serial Number/Markings
s
ge
Pa
ed
Receiving Inspector Approval Signature / Date Government Representative
ct Name/Approval Date
❑ Material Receiving
le
Inspection Passed
Se
Page 39
[ProjectName] - [ProjectNumber]
Copyright
Questions? Call First Time Quality 410-451-8006
[CompanyName]
Material Inspection and Receiving Report
Contract ID Contract Name Purchase Order No. Supplier Bill of Lading No. Date
[ProjectNumber] [ProjectName]
Stock/Part Quantity Conditional
Item No. No. Description Received Condition Marking Accept Use Reject
s
ge
Pa
ed
Receiving Quality Control
ACCEPTANCE
EXCEPTIONS:
Page 40
[ProjectName] - [ProjectNumber]
Copyright
Questions? Call First Time Quality 410-451-8006
Results of inspections and tests will be recorded on the Inspection and Test Form.
s
A list of controlled and calibrated test equipment is listed on the Test Equipment Calibration Plan and Log
ge
included as an exhibit in this subsection.
The Quality Manager evaluates the project requirements and determines if there are measuring devices
that require controls to assure quality results. Pa
For each type of device, the Quality Manager identifies:
Page 41
[ProjectName] - [ProjectNumber]
Copyright
Questions? Call First Time Quality 410-451-8006
[CompanyName]
Quality Inspection and Test Plan
s
ge
SPECIFICATION
SECTION ACCREDITED/ LOCATION DATE
AND APPROVED OF TEST FORWARDED
PARAGRAPH SCHEDULE LAB ON/OFF DATE TO
NUMBER ACTIVITY ID TEST REQUIRED YES /NO SAMPLED BY TESTED BY SITE/SITE COMPLETED CUSTOMER REMARKS
Pa
ed
ct
le
Se
Page 42
[ProjectName] - [ProjectNumber]
Copyright
Questions? Call First Time Quality 410-451-8006
[CompanyName]
Test Equipment Calibration Plan and Log
Project ID Project Name Preparer Date
[ProjectNumber] [ProjectName]
s
Type of measuring device and Frequency Device ID Calibration Date certificate # Next Calibration Due Date
ge
Project Start
Pa
ed
ct
le
Se
Page 43
[ProjectName] - [ProjectNumber]
Copyright
Questions? Call First Time Quality 410-451-8006
[CompanyName]
Construction
Quality Manual
s
Operating Policies of the
ge
[CompanyName] Quality System
Version: [Date]
Pa
The documents provided by [CompanyName] disclose proprietary company information that is copyright
registered. Please hold these quality documents in confidence and do not share them with other
ed
Page 1
Quality Manual
Copyright
Questions? Call First Time Quality 410-451-8006
QUALITY MANUAL
TABLE OF CONTENTS
s
2.1. Overview ............................................................................................................................................ 10
ge
2.2. [CompanyName] Project License and Qualification Requirements .................................................. 10
2.3. Project Personnel and Qualifications ................................................................................................ 10
2.4. Project Quality Assurance/Quality Control Plan ................................................................................ 11
Pa
2.5. Identification of Quality Controlled Work Tasks................................................................................ 12
2.6. Project Quality Inspection and Test Plan ........................................................................................... 12
2.7. Project Quality Communications Plan ............................................................................................... 12
2.8. Project Quality Training Plan ............................................................................................................. 12
ed
Page 2
Quality Manual
Copyright
Questions? Call First Time Quality 410-451-8006
s
6.7. Purchase Order Requirements .......................................................................................................... 26
6.8. Project Purchase Order Approvals..................................................................................................... 26
ge
7. Process Controls ................................................................................................................................. 27
Page 3
Quality Manual
Copyright
Questions? Call First Time Quality 410-451-8006
s
12.3. Document Controls .......................................................................................................................... 42
ge
12.4. Record Controls ............................................................................................................................... 43
Page 4
Quality Manual
Copyright
Questions? Call First Time Quality 410-451-8006
7. PROCESS CONTROLS
HOW WORK IS CARRIED OUT
7.1. OVERVIEW
The construction process plan defines how project work is to be done and approved for the overall
project. The construction process plan is communicated to all key personnel, subcontractors and suppliers
in a startup meeting. As the project proceeds, work task plans provide additional details of how each
individual work task is carried out. Work tasks planning meetings are used to communicate expectations
of the work task plan to key personnel responsible for carrying out the work task.
s
project work will be performed and controlled. Key personnel from [CompanyName], subcontractors and
ge
suppliers meet to review expectations for project quality results as well as quality assurance and quality
control policies and procedures including:
coordinated set of documents that collectively define quality requirements for the work task including:
Page 27
Quality Manual
Copyright
Questions? Call First Time Quality 410-451-8006
During the meeting, the Superintendent communicates the work task quality requirements and reinforces
heightened awareness for critical requirements. Topics for a work task quality plan meeting include:
s
• Conflicts that need resolution
ge
• Required quality documents and a verification of availability to personnel carrying out,
supervising, or inspecting the work task
• Record keeping requirements and the availability of necessary forms
• Review methods and sequences of installation Pa
• Special details and conditions
• Standards of workmanship
• Heightened awareness of critical quality requirements
• Quality risks
ed
The Superintendent conducts a meeting with key company, subcontractor and supplier personnel
responsible for carrying out, supervising, or inspecting the work, and interested customer representatives.
le
The meeting is held on a nominal weekly schedule. During the meeting, the Superintendent facilitates
Se
coordination among the participants, communication among the participants, and reinforces heightened
awareness for critical requirements.
The Superintendent maintains a record of the meeting event on the Daily Quality Control Report.
The Quality Manager identifies supplemental start-work requirements that apply to a specific project
when they are necessary to assure quality results.
Page 28
Quality Manual
Copyright
Questions? Call First Time Quality 410-451-8006
Work is conducted only when conditions do not adversely impact quality, comply with government
regulations, contract technical specifications, industry standards, or product installation instructions.
The Quality Manager identifies supplemental work in process requirements that apply to a specific project
when they are necessary to assure quality results.
The Quality Manager identifies supplemental protection requirements that apply to a specific project
when they are necessary to assure quality results.
s
Delivery of materials will be planned according to the work progress to minimize storage on site, where
ge
there are higher possibilities of damages and deterioration of materials.
Stored materials will be segregated to prevent cross contamination and limit losses should a delivery be
rejected. Pa
The Superintendent surveys stored materials during daily jobsite reviews and identifies any material that
have incurred damage or otherwise become defective and therefore unfit for use.
ed
project.
le
Only approved materials are used in the construction process. Only approved materials are specified in
purchase and/or subcontracts.
Se
Materials that are defective, deteriorated, damaged, or not approved are not used. The Superintendent
clearly marks such materials for non-use or otherwise holds them aside.
When customer-supplied materials are lost, damaged, or otherwise found unsuitable for use, the
Superintendent reports such findings to the customer.
When subcontractor–supplied materials are damaged or otherwise found unsuitable for use, the
Superintendent reports such findings to the subcontractor.
The Superintendent ensures that construction uses only materials specified in the contract technical
specifications, contract drawings, and approved submittals. Substitutions are made only by agreement of
the customer and documented by a change order (see section 2.1.3.6).
7.5.5.1. CONTROLLED PRODUCT USE AND INSTALLATION
[CompanyName] construction activities conform to manufacturers’ product use and installation in-
structions that apply to the construction process.
Page 29
Quality Manual
Copyright
Questions? Call First Time Quality 410-451-8006
When installing a product, the Superintendent has access to all applicable product installation
instructions.
s
When a monthly quality control report is required by the Project Quality Plan, the Superintendent records
ge
a monthly status report. The report includes:
Page 30
Quality Manual
Copyright
Questions? Call First Time Quality 410-451-8006
A nonconformance is any item that does not meet project specifications or [CompanyName] Quality
System requirements.
9.2. NONCONFORMANCES
s
prevent inadvertent cover-up.
ge
9.2.2. CONTROL THE CONTINUATION OF WORK
After the item is marked, the Superintendent determines if work can continue in the affected area:
Pa
CONTINUE WORK: When continuing work does not adversely affect quality or hide the defect, work may
continue in the affected area while the disposition of the item is resolved. The Superintendent may place
limitations on the continuation of work.
STOP WORK ORDER: When continuing work can adversely affect quality or hide the defect, work must
ed
stop in the affected area until the disposition of the item resolved. The Superintendent identifies the
limits of the affected area. The Superintendent quickly and clearly identifies the boundaries of the stop
ct
work area.
If nonconformances or observed items exist by the work task completion inspection, the Superintendent
or inspector records the nonconformances on a nonconformance report.
REPLACE: The nonconformance can be brought into conformance with the original specification
requirements by replacing the nonconforming item with a conforming item.
REPAIR: The nonconformance can be brought into conformance with the original requirements through
completion of required repair operations.
REWORK: The nonconformance can be made acceptable for its intended use, even though it is not
restored to a condition that meets all specification requirements. The Quality Manager may specify
Page 37
Quality Manual
Copyright
Questions? Call First Time Quality 410-451-8006
standards that apply to the completion of rework. Rework nonconformances must be approved by the
customer.
USE AS-IS: When the nonconforming item is satisfactory for its intended use. Any use as-is items that do
not meet all specification requirements must be approved by the customer.
Furthermore, the Superintendent ensures that previously completed work is reinspected for similar
nonconformances and corrective actions are taken to avert future occurrences (see section 9.3 Corrective
Actions).
s
9.3.1. CONTROL OF CORRECTIVE ACTIONS
ge
When a nonconformance is found, the Superintendent ensures that:
When a solution requires changes to [CompanyName] quality standards, the Quality Manager makes
modifications as necessary by making changes to:
• Material specifications
ct
• Personnel qualifications
• Subcontractor and Supplier qualifications
le
• Company standards
• Inspection processes
Se
Heightened awareness during quality inspections verifies and documents compliance with the corrective
action improvement items. A qualified Superintendent inspects corrective actions during regular quality
inspections and records observations on the quality inspection form.
The Superintendent notifies affected subcontractors and suppliers of selected preventive action training
requirements.
The Superintendent evaluates the effectiveness of the improvements. The Quality Manager reviews
improvement results recorded on quality inspection records and monthly field reviews. When the Quality
Manager determines that the improvement actions are effective, the item is no longer treated as a
preventive action.
Page 38
Quality Manual
Copyright
Questions? Call First Time Quality 410-451-8006
Questions? Call First Time Quality 410-451-8006
s
Project Subcontractor and Supplier List
ge
Training Plan
Training Log
Regulatory Codes and Industry Standards
Project Regulatory Building Codes
Pa
Controlled Materials Form
Metals Material Receiving Inspection Report
ed
[CompanyName]
QA/QC Forms
s
ge
Pa
ed
ct
le
Se
Page 1
Quality System Forms
Copyright
Questions? Call First Time Quality 410-451-8006
s
[CompanyName] Project Design Review Plan ........................................................................................ 12
ge
[CompanyName] Design Review Meeting Participant Form ................................................................... 13
[CompanyName] Design Review Form ................................................................................................... 14
[CompanyName] Subcontractor and Supplier Qualification Form .......................................................... 15
Pa
[CompanyName] Subcontractor and Supplier Certifications and Licenses.............................................. 16
[CompanyName] Project Startup Meeting Form .................................................................................... 17
[CompanyName] Work Task Quality Assurance/Quality Control Plan .................................................... 18
PREPARATORY PHASE CHECKLIST........................................................................................................... 19
ed
Page 2
Quality System Forms
Copyright
Questions? Call First Time Quality 410-451-8006
[CompanyName]
Project Submittal Form
Submittal ID# Project ID Project Name Date
[ProjectNumber] [ProjectName]
To: From: Precision Plant Services
Location:
s
Product data
Request for information
ge
Completed form or quality record
Quality system document
Other:
List of attachments:
Pa
Remarks:
ed
Submittal Prepared by: Submittal Approved by Precision Plant Services Quality Manager:
ct
Title:
Title:
Se
Signature / Date:
Signature / Date:
Customer Disposition: Customer Representative:
Approved
Name:
Conditionally approved, resubmission not required (see
comments)
Title:
Disapproved, resubmission required
Signature / Date:
Other:
Comments:
Page 10
Quality System Forms
Copyright
Questions? Call First Time Quality 410-451-8006
[CompanyName]
Change Order Form
[ProjectNumber] [ProjectName]
s
Code Enforcement Official
ge
Other:
Reason: Reason:
le
Name/Date ___________________________
Name/Date ___________________________
Page 11
Quality System Forms
Copyright
Questions? Call First Time Quality 410-451-8006
[CompanyName]
Subcontractor and Supplier Qualification Form
Company Name: Scope of Work (specification sections):
s
Review Topics Project-Related Job Credentials
ge
Licenses required: License and expiration dates:
Personnel license, certification, and training required: List each person’s credentials on the Subcontractor and
Supplier Certifications and Licenses form.
ct
Qualifications
le
Demonstrated capability to complete work to Access to codes, standards and product instructions
Company quality standards Equipment availability
Demonstrated skills and knowledge Production capacity
Demonstrated experience Staffing availability
QUALIFICATION NOTES:
Page 15
Quality System Forms
Copyright
Questions? Call First Time Quality 410-451-8006