Da13 DDR N1 13991116 143 0
Da13 DDR N1 13991116 143 0
Da13 DDR N1 13991116 143 0
Antifaom Agent AA-01 can DP, HWDP & DC Data Type KLF1600 KLF1600 KLF1600
Dispersant FR-02 sxs Size (in) Grade Nominal Weight (ppf) Power (hp) 1600 1600 1600
chemical wash, CW-01 can DC 4 3/4 47 Max Press (psi) 3200 3200 3200
Gachsaran 7- 5 1600 1385.0 Anhy + Rd. Ml + Gy.Ml+ Salt 2 78 / 39 21 200 30 400 3481 20:30
Gachsaran 1 (Cap Rock) 2482.5 2426.5 Anhy + Salt + Shale Wellhead BOP Test Record
Asmari 2556.5 2491.0 Lst + Anhy Component Top FLG (Size/ WP) BTM FLG (Size/ WP) Component Type and Size Test Pressure
Kalhur 2626.8 2566.0 Lst+ Anhy+ Shale+ Cyst+Salt Xmas Tree Annular 13 5/8"-5K 2500
Pabdeh 2860.6 2837.0 Lst + Gy.Ml THS 11" 5K 13 5/8" 3K Top Rams 13 5/8"-10K 4500
Gurpi 3311 3293.0 Lst DSA Pack off - - - - Blind Rams 13 5/8"-10K 4500
Ilam 3356.5 3332.0 Lst CHS 13 5/8" 3K 21 1/4" 2K Bottom Rams 13 5/8"-10K 4500
Sarvak 3440.5 3411.0 Lst + Cyst CHH 21 1/4" 2K - - Choke Manif. 5k 4500
Well TD 3536.5 Wear Bushing Size: 11" IN/ OUT: in Accumulator 3k Function test
To Rig OEOC 206S : 7" Fluted Swage (1 No.) To Rig Noor-2 : 5 7/8" B.Bit (517, S/N : 05515, Used, K.D)
Sent
Request
Outstanding
11. Running Casing/ Liner >>> Note: OBS. 5-20 klb Overpull F/2831 m to 2801 m During POOH.
12. Cementing >>> Note: 11.5 Hrs. Drlg time + 0.5 Hrs. W&R, Conn. Time & SCR.
13. Nipple up/ down
14. BOP Test >>>Note : Operation Crew Shortage (Night Shift Assistant Driller & 1 No. Roughneck & Camp Motorman).
15. Formation Testing
18. Perforation
19. Stimulation
21. Suspension/Abandonment
22. NPT
24.0
From To Hrs Code Morning Report
00:00 06:00 6.0 6B Cont. POOH F/2300 m to 280 m While Circ. Cross WHD W/NL-NG.
Operations Summary
Cont. Drlg 5 7/8" Hole Section F/3487 m to 3512 m (Well TD) W/NL-NG, CBU, POOH as Cond. Trip F/3512 m to 3420.5 m (7" LNR Shoe) & RIH Back to 3512 m (Btm) W/G.H.C, Spot 15 bbl
Hi-Vis Pill W/NL-NG. POOH F/3512 m to 2300 m W/Good Hole Condition While Circ. Cross WHD W/NL-NG.
Next Operations