Da13 DDR N1 13991122 149 0
Da13 DDR N1 13991122 149 0
Da13 DDR N1 13991122 149 0
Antifaom Agent AA-01 can DP, HWDP & DC Data Type KLF1600 KLF1600 KLF1600
Dispersant FR-02 sxs Size (in) Grade Nominal Weight (ppf) Power (hp) 1600 1600 1600
chemical wash, CW-01 can DC 4 3/4 47 Max Press (psi) 3200 3200 3200
Gachsaran 1 (Cap Rock) 2482.5 2426.5 Anhy + Salt + Shale Wellhead BOP Test Record
Asmari 2556.5 2491.0 Lst + Anhy Component Top FLG (Size/ WP) BTM FLG (Size/ WP) Component Type and Size Test Pressure
Kalhur 2626.8 2566.0 Lst+ Anhy+ Shale+ Cyst+Salt Xmas Tree Annular 13 5/8"-5K 2500
Pabdeh 2860.6 2837.0 Lst + Gy.Ml THS 11" 5K 13 5/8" 3K Top Rams 13 5/8"-10K 4500
Gurpi 3311 3293.0 Lst DSA Pack off - - - - Blind Rams 13 5/8"-10K 4500
Ilam 3356.5 3332.0 Lst CHS 13 5/8" 3K 21 1/4" 2K Bottom Rams 13 5/8"-10K 4500
Sarvak 3440.5 3411.0 Lst + Cyst CHH 21 1/4" 2K - - Choke Manif. 5k 4500
Well TD 3536.5 Wear Bushing Size: 11" IN/ OUT: IN Accumulator 3k Function test
Received
5" Liner Program + 5" liner 18#, L-80, WSP-4T (as required) + HGR Man + Casing crew & running equip+ 5" Liner HGR, 18#, L-80, VFJ & Acc.+ 4 1/8" Bit & Mill
Request
5" XOS, VFJ Pin * WSP-4T Box (2Jts) + 5" LDC, 18#,L-80, WSP-4T (3Jts) + 5" XOS, WSP-4T Pin * VFJ Box (2Jts) + 5" XOS, WSP-4T Pin * 3 1/2" IF Box
Outstanding
9. Deviation Survey
12. Cementing
14. BOP Test >>>Note : Operation Crew Shortage (Night Shift Derrickman & Camp Motorman).
15. Formation Testing >>>Note : Released Homai Logging Crew at 13:00 O'clock.
16. Directional Drilling >>>Note : Rec. 1No. MDCO pump truck & CMT crew at 14:00 O'clock.
17. Well Completion
18. Perforation
19. Stimulation
21. Suspension/Abandonment
24.0
From To Hrs Code Morning Report
00:00 06:00 6.0 22N Cont. soft W&R F/2800m to 2907m (RIH F/2802m to 2813m normally) W/NL-NG.
Operations Summary
POOH with TLC#1 string from 2698m to surface. RIH W/5 3/4" Used Taper Mill (1/8" UG) to 2795m. Soft W&R F/2795m to 2800m.
Next Operations