Assignment 1 Front Sheet: Qualification BTEC Level 5 HND Diploma in Computing
Assignment 1 Front Sheet: Qualification BTEC Level 5 HND Diploma in Computing
Unit number and title Unit 06: Managing a Successful Computing Project
Student declaration
I certify that the assignment submission is entirely my own work and I fully understand the consequences of plagiarism. I understand that
making a false declaration is a form of malpractice.
Grading grid
P1 P2 P3 P4 M1 M2 D1
Summative Feedback: Resubmission Feedback:
With more than 7 billion connected IoT devices today, experts are expecting this number to
grow to 10 billion by 2020 and 22 billion by 2025. Oracle has a network of device partners.
Today, the IoT has become a part of our lives, it affects our behavior, changes the way we
work, and affects the way we improve our health.
IoT technology is increasingly being applied widely and even in the healthcare field and it is
increasingly being developed with many practical applications and success in treatment.
IoT helps scientists and doctors monitor the health of users or support treatment with the
best and simplest results for patients.
Iot helps us create a system that tracks, records notes, and synthesizes the best treatments
and creates a database that can be easily stored and shared in medicine.
Figure 3: IoT for Healthcare.
The development of IoT in medicine has helped doctors reduce the burden of data
classification (patient name, address, contact information, medical condition, medical history ...) it
reduces time time to wait and get work done quickly.
1.2 SCENARIO
As a member of Research and Development department, you have been assigned a mini-project
to find out do digital technologies improve life or distract from it and to explore the efficacy of products
and features specifically designed to improve health and wellbeing.
You need to do primary research (both qualitative and quantitative research) and secondary
research to find out that impact and conduct a report for your research. Even it’s a mini-project, you
must apply project management (PM) techniques such as project charter with aims, objectives, cost etc.
As for time management, you need to produce WBS and Gantt chart with reasonable tasks and time. A
project logbook is required to provide evidence of the project development process and ongoing
reflection for every week. This logbook will be needed later for your reflection and evaluation in
Assignment 2. As part of QA (quality assurance) policy, in the report you also need to critically evaluate
the PM process and appropriate research methodologies applied.
Your report must have an introduction stating the project aims and objectives. This must be
followed by a copy of your project management plan. Your plan should show the milestones when you
will review with your tutor your ongoing progress so far. You will submit your logbook which shows how
you have carried out the project.
2 PROJECT MANAGEMENT PLAN:
Project Name: Project to develop software to support medical examination and treatment.
Impact of project: It will make it easier for you to take care of your own health or for a family member.
2. Project Team
Team Members: Phan Trinh Trong Research and 0987 236 xxx Trongphan2405@gmali.com
Development
Future medical
instrument
Chau Nguyen Research and 0976 445 xxx Bkhoa2708@gmail.com
Bach Khoa Development
Future medical
instrument
Le Ngoc Tan Research and 0976 357 xxx Toanle789@gmail.com
Toan Development
Future medical
instrument
Nguyen Van Research and 0976 889 xxx Thangnguyen0304@gmail.com
Thang Development
Future medical
instrument
Hoang Xuan Loc Research and 0976 778 xxx Xuanloc18@gmail.com
Development
Future medical
instrument
3. Stakeholders
Project Purpose / Business Justification Describe the business need this project addresses
Using software associated with reputable hospitals and doctors to assist in health care in the simplest and most accessible
way for everyone.
• The software is subject to legal requirements and ensures that it does not violate
business and medical laws.
• Affiliated hospitals and physicians must be clearly contracted and regulated and
responsible for their own diagnosis and treatment.
The software is always updated and supported by users
Deliverables
• The software must be designed to be simple, easy to use and compatible with the widest
range of devices.
• Supports multiple languages and interpreters.
• The software runs smoothly and does not require high device configuration.
• Patient information must be kept confidential and encrypted.
• Medical expenses must be declared transparently on the software and have a medical
history
Scope
• This project will focus on supporting the simplest possible medical examination and
treatment, helping to save money and time for patients.
• This software is subject to the law and is responsible for the law
Project Milestones :
• Inception phase (Project concept planning, stakeholder identification, team member
selection):
• Start: August 28th, 2020 – Accomplish 1st Oct 2020 (Status: Done).
• Planning phase (Financial Management Plan, Stakeholder Management Plan, Monitoring
and Control Plan, Risk Management Plan, Resource Use Plan (people, equipment) , tools),
Quality Assurance Plan, Test and Release Plan, Project Termination Plan):
• Start: Otc 4th 2020 – Accomplish Dec 3th 2020 (Status: Done).
• Construction phase:
• Start: Dec 5th 2020 – Accomplish April 11th 2021 (Status: Doing).
• Delivery & maintenance phase:
• Start: April 12th 2021 – End May 12th 2021 (Status:Pending).
Major Known Risks (including significant Assumptions) Identify obstacles that may cause the project to fail.
Constraints List any conditions that may limit the project team’s options with respect to resources, personnel, or schedule (e.g., predetermined
budget or project end date, limit on number of staff that may be assigned to the project).
• Declare fully information the budget items paid during the project's operation.
• The employees are arranged to work according to their expertise.
• Stakeholders create favorable conditions to speed up the project.
External Dependencies
• Customer.
• Investors
• Members of the project
5. Communication Strategy
6. Sign-off
Project Manager
7. Notes
The problems we identified in the hospitals and the wishes of each patient:
Through the above problems we will create a software on the phone to link with the hospitals
and doctors to solve the above mentioned problems.
It will help users feel better when they get medical examination and treatment and save time
and money.
The problems we identified in the hospitals and the wishes of each patient:
Not only that, the application develops an AI system that can remember data and create
reminders for each software user.
• The investor and related parties must always work together for the development of the
project. The project will be completed when the software and processes related to the
project are completed
• The application is optimized for performance and performance and has a stable server with
Hotbackup
• Based on the customer evaluation, the project scope can be further modified or internally
trimmed to suit the most essential requirements of the customer.
Work
Phase Unit Cost/month Total
duration(month)
Staff Leader and 8 6000$ 48000$
IT Manager
Staff Research and 4 2500$ 10000$
Development
Staff Maketing manager 2 2000$ 4000$
Staff Manager evaluate 1 1500$ 1500$
and test
Staff Analyst 1 1000$ 1000$
Total cost 64500$
Team Members: Phan Trinh Trong Research and 0987 236 xxx Trongphan2405@gmali.com
Development
Future medical
instrument
Chau Nguyen Research and 0976 445 xxx Bkhoa2708@gmail.com
Bach Khoa Development
Future medical
instrument
Le Ngoc Tan Research and 0976 357 xxx Toanle789@gmail.com
Toan Development
Future medical
instrument
Nguyen Van Research and 0976 889 xxx Thangnguyen0304@gmail.c
Thang Development om
Future medical
instrument
Hoang Xuan Loc Research and 0976 778 xxx Xuanloc18@gmail.com
Development
Future medical
instrument
• Internal communication: the development department in the project will have meetings
each week to review the work has been done to review the progress of the department
and make plans for future work.
• Information management: At the end of the month will be based on the review reports of
each week to analyze progress and bring information to stakeholders to follow up the
project.
• Project marketing: the manager will be responsible for introducing users to the most
detailed information about the project's products and outlining the benefits of the
product and supporting the customer.
Project Schedule:
Inception Phase and Planning:
Project Planning
Recruitment of members and investors
Briefly introduce the project to team members
Organize meetings between members and investors
Create specific schedules and tasks
Set specific financial
Establish communication process
Project Objective and Aim
Project Scope management
7-Aug 26-Sep 15-Nov 4-Jan 23-Feb 14-Apr
Research AI technology
Create Algorithms
Product information
25-Mar 30-Mar 4-Apr 9-Apr 14-Apr 19-Apr 24-Apr 29-Apr 4-May 9-May 14-May 19-May
Finding risk
Giving solution
Solving risk
Testing
Delivery
Maintenance
• User: We will provide the steps used in the software and ask questions before the
user's questions.
• Company: Through the process of using, we want to receive feedback from users
about their feelings after using the software. So, we will take user opinion surveys
and user reviews of the app.
In the process of collecting user information over time using the Life healty software
application, we choose to interview directly with users who make appointments and go to the
hospital according to the appointment so we can have The most practical answer to our software.
We use the user sue survey creation section on Google to make surveys as fast as possible.
Through the above survey, we received many positive comments for the software, 95 percent
of people rated that the software was very good to use, the remaining few reflected on the
application can not be used on their equipment. Through the above comments, we will increasingly
improve the quality of our products and we will create more surveys to improve product quality.