Well Integrity Report Rev. 01: AAB Ex. Oil Producer, Gas

This well integrity report provides information on initial well readings, annulus bleed down details, a 24-hour build up test, and sign off. It documents the field, well type, date, status, and H2S levels. Initial and final readings are given for wellhead flow pressure, downhole static pressure, and annulus pressures. The annulus used for bleed down is identified along with pressures bled to and time. Hourly readings over 24 hours show wellhead pressure and annulus pressures during the build up test. Space is provided for comments and approval signatures.
Copyright
© © All Rights Reserved
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
Download as xls, pdf, or txt
0% found this document useful (0 votes)
175 views1 page

Well Integrity Report Rev. 01: AAB Ex. Oil Producer, Gas

This well integrity report provides information on initial well readings, annulus bleed down details, a 24-hour build up test, and sign off. It documents the field, well type, date, status, and H2S levels. Initial and final readings are given for wellhead flow pressure, downhole static pressure, and annulus pressures. The annulus used for bleed down is identified along with pressures bled to and time. Hourly readings over 24 hours show wellhead pressure and annulus pressures during the build up test. Space is provided for comments and approval signatures.
Copyright
© © All Rights Reserved
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
Download as xls, pdf, or txt
Download as xls, pdf, or txt
You are on page 1/ 1

Company's Logo

Well Integrity Report Rev. 01


Well Work Type

Field/Platform Well Type Date Status (SI, producing…) H2S Level (ppm) & Date

AAB Ex. Oil Producer, Gas….

Time WHFP, Psig WDSP, Psig WHSIP, Psig A-annulus press., Psig B-annulus press., Psig
Initial Readings

Final Readings

Bleed Down Information (A or B Annulus)

Annulus A or B (Verify by ☑) A B
Initial Pressure, Psig
Pressure bled down to, Psig
HP instrument connection size, in
Time recoreded to bled off, min
Return fluid type
Remarks (if any)

Build up Information for minimum 24 hours (if possible)

After (Hour) WHP, Psig Annulus-A press., Psig Annulus-B press., Psig Remarks After (Hour) WHP, Psig Annulus-A press., Psig Annulus-B press., Psig Remarks
0.5 12
1 14
2 16
4 18
6 20
8 22
10 24

Comments:

Name Signature

Checked by:

Approved by: