Software Update Without Using New Functions
Software Update Without Using New Functions
Preface 2
Introduction 3
SIMATIC
Overview of the update tasks 4
PCS 7
Software update without utilization Preparing for the software
5
update
of new functions
Installation of PCS 7 and
settings on the ES and OS 6
Service Manual
Adaptations in the PCS 7
project on the ES 7
Downloading to target
systems 8
05/2017
A5E36200133-AA
Legal information
Warning notice system
This manual contains notices you have to observe in order to ensure your personal safety, as well as to prevent
damage to property. The notices referring to your personal safety are highlighted in the manual by a safety alert
symbol, notices referring only to property damage have no safety alert symbol. These notices shown below are
graded according to the degree of danger.
DANGER
indicates that death or severe personal injury will result if proper precautions are not taken.
WARNING
indicates that death or severe personal injury may result if proper precautions are not taken.
CAUTION
indicates that minor personal injury can result if proper precautions are not taken.
NOTICE
indicates that property damage can result if proper precautions are not taken.
If more than one degree of danger is present, the warning notice representing the highest degree of danger will be
used. A notice warning of injury to persons with a safety alert symbol may also include a warning relating to property
damage.
Qualified Personnel
The product/system described in this documentation may be operated only by personnel qualified for the specific
task in accordance with the relevant documentation, in particular its warning notices and safety instructions. Qualified
personnel are those who, based on their training and experience, are capable of identifying risks and avoiding
potential hazards when working with these products/systems.
Proper use of Siemens products
Note the following:
WARNING
Siemens products may only be used for the applications described in the catalog and in the relevant technical
documentation. If products and components from other manufacturers are used, these must be recommended or
approved by Siemens. Proper transport, storage, installation, assembly, commissioning, operation and
maintenance are required to ensure that the products operate safely and without any problems. The permissible
ambient conditions must be complied with. The information in the relevant documentation must be observed.
Trademarks
All names identified by ® are registered trademarks of Siemens AG. The remaining trademarks in this publication
may be trademarks whose use by third parties for their own purposes could violate the rights of the owner.
Disclaimer of Liability
We have reviewed the contents of this publication to ensure consistency with the hardware and software described.
Since variance cannot be precluded entirely, we cannot guarantee full consistency. However, the information in
this publication is reviewed regularly and any necessary corrections are included in subsequent editions.
1 Security information......................................................................................................................................7
2 Preface.........................................................................................................................................................9
3 Introduction.................................................................................................................................................13
3.1 Defining a strategy for the software update...........................................................................13
3.2 General requirements............................................................................................................15
3.3 Important Information for Software Update without Utilization of New Functions..................17
3.4 Information on Products from the PCS 7-Add On Catalog.....................................................20
3.5 Licensing with the Automation License Manager...................................................................21
4 Overview of the update tasks.....................................................................................................................23
4.1 Information about software update procedure.......................................................................23
4.2 Overview of the procedure.....................................................................................................24
5 Preparing for the software update..............................................................................................................27
5.1 Overview of the migration of CAS to the Process Historian...................................................27
5.1.1 How to Detach Attached Archive Segments on the Central Archive Server..........................27
5.1.2 Migration of CAS to the Process Historian.............................................................................28
5.2 Preparatory tasks...................................................................................................................30
5.2.1 Overview of preparations.......................................................................................................30
5.2.2 Exchanging data via OPC A&E..............................................................................................30
5.2.3 How to Back Up PCS 7 Project Data.....................................................................................30
5.2.4 How to Back Up User Created Libraries................................................................................33
5.2.5 Operator and Display Texts in Blocks....................................................................................34
5.2.6 How to export operator and display texts...............................................................................34
5.2.7 Backing up pictures for user-defined status displays.............................................................35
5.2.8 Backing Up the License Keys and Authorizations..................................................................35
6 Installation of PCS 7 and settings on the ES and OS.................................................................................37
6.1 Overview of Installation and Settings on the ES and OS.......................................................37
6.2 How to Update PCS 7............................................................................................................38
6.3 How to enable encrypted communication between the PC stations......................................40
6.4 Installation of Additional PCS 7 Libraries...............................................................................42
6.5 How to Install Additional PCS 7 Libraries...............................................................................43
7 Adaptations in the PCS 7 project on the ES...............................................................................................45
7.1 Updating a PCS 7 project.......................................................................................................45
7.2 General adaptations...............................................................................................................46
7.2.1 Overview of General Adaptations in the Project....................................................................46
7.2.2 Changing the Configuration of Multilingual Texts...................................................................46
Index...........................................................................................................................................................87
http://www.siemens.com/industrialsecurity.
Siemens’ products and solutions undergo continuous development to make them more secure.
Siemens strongly recommends to apply product updates as soon as available and to always
use the latest product versions. Use of product versions that are no longer supported, and
failure to apply latest updates may increase customer’s exposure to cyber threats.
To stay informed about product updates, subscribe to the Siemens Industrial Security RSS
Feed under
http://www.siemens.com/industrialsecurity.
Documentation Contents
Manual Software update without utiliza‐ Describes the procedure for the software update of PCS 7
tion of new functions projects without utilization of new functions.
● Original version of the existing project:
PCS 7 as of V8.0 or higher.
● Project to be updated to the following version without
utilization of new functions:
PCS 7 V9.0
Manual Software update with utilization Describes the procedure for the software update of PCS 7
of new functions projects with utilization of new functions.
● Original version of the existing project:
PCS 7 as of V8.0 or higher.
● Project to be updated to the following version with
utilization of new functions:
PCS 7 V9.0
Documentation Contents
Manual Process Control System PCS 7; Ensuring the availability of a PCS 7 System; contains infor‐
Service Support and Diagnostics mation on creating backups and how to perform firmware
updates.
Manual Process Control System PCS 7 PCS 7 PC - Hardware and Installation;
PCS 7 PC Configuration Windows settings and tools;
Software packages and required license keys.
Configuration manual Process Control Guide to configuration steps in SIMATIC Manager, CFC,
System PCS 7; Engineering System SFC, NetPro
Configuration manual Process Control Guide to configuration steps in WinCC
System PCS 7; Operator Station
Function manual Process Control Sys‐ Guide to configuration steps for High Availability process
tem PCS 7; High Availability Process control systems
Control Systems
Documentation All modules released for SIMATIC PCS 7 are listed together
Process Control System PCS 7; with the following information:
Released Modules ● Product designation
● Article number
● Firmware version
● Brief description
Online help Describes the updating of WinCC projects.
WinCC Information System
Process Control System PCS 7; Web Describes the installation and use of the Web Option for OS
Option for OS manual in PCS 7
Documentation Contents
Manual Process Control System PCS 7; Describes how an OPC A&E server with hierarchical access
OpenPCS 7 is used in PCS 7 systems
Function manual Process Control Sys‐ Describes the principles of use of high Availability (redun‐
tem PCS 7; High Availability Process dant) components in SIMATIC PCS 7.
Control Systems
SIMATIC manual S7 F/FH Automation Describes the configuration and programming of S7 F/FH
Systems failsafe systems using S7 F systems.
SIMATIC S7 F Systems Contains important information which must be taken into ac‐
count when installing and using the S7 F system optional
package in PCS 7.
Conventions
In this documentation, the names of elements in the software interface are specified in the
language of this documentation. If you have installed a multi-language package for the
operating system, some of the designations will be displayed in the base language of the
operating system after a language switch and will, therefore, differ from the designations used
in the documentation.
If you use the operating system Windows 10, you can find the Siemens SIMATIC programs in
the "Start" menu under All apps > Siemens Automation.
Decision process
The selection and use of the correct documentation depends on the comprehensiveness of
your software update. the current status of the software and any boundary conditions that may
exist.
The figure below shows you the documentation you should use to update a PCS 7 plant.
,QWHUPHGLDWHVWHSVDUHUHTXLUHGIRUXSGDWLQJ\RXU
SURMHFW
'HSHQGLQJRQWKH3&6YHUVLRQRI\RXUSURMHFW
,V\RXUSURMHFWD3&6 1R \RXKDYHWRXSGDWHWKHHQJLQHHULQJV\VWHPDQG
9[SURMHFW"
WKHSURMHFW
7RGRWKLVXVHWKHPDQXDOVIRUWKH
VRIWZDUHXSGDWHRIWKHFRUUHVSRQGLQJ3&6
YHUVLRQ
<HV
'R\RXZDQWWRXVH 1R
WKHQHZIXQFWLRQVRI3&6
9"
'R\RXZDQWWRXSGDWH
DUHGXQGDQWV\VWHPGXULQJ
<HV RSHUDWLRQ"
<HV 1R
3UHVHQW
'RFXPHQWDWLRQ
0DQXDO6RIWZDUHXSGDWH 0DQXDOV6RIWZDUHXSGDWH 0DQXDO6RIWZDUHXSGDWH
ZLWKXWLOL]DWLRQRIQHZ ZLWKRXWXWLOL]DWLRQRIQHZ ZLWKRXWXWLOL]DWLRQRIQHZ
IXQFWLRQV IXQFWLRQV IXQFWLRQV
3&6963RUKLJKHUWR 3&6963RUKLJKHUWR 3&6963RUKLJKHUWR
9 9 9
PCS 7 High Availability Process
Control Systems*XLGHOLQHVIRU
XSGDWLQJDUHGXQGDQW23GXULQJ
RSHUDWLRQ
Note
Operating systems
Observe the requirements for the operating systems. You can find additional information on
this in the documentation Process Control System PCS 7; PCS 7 Readme (online).
Note
Intermediate steps required for the software update
If you cannot directly upgrade to the current PCS 7 version of a PCS 7 project, the intermediate
steps are required. The steps described in the accompanying documentation must be
completed.
See also
General requirements (Page 15)
Note
If AS blocks from other PCS 7 versions are used in the project, it will be necessary to update
these blocks via a software update using new functions.
You can find the download files for setups of older versions of the PCS 7 Library, the
PCS 7 Basic Library or the PCS 7 Advanced Process Library on the Internet (https://
support.industry.siemens.com/cs/ww/en/view/109480136).
Note
A message indicates missing ASIA hardlock in a non-Asian project
Check the language of the operating system and PCS 7.
When language columns are configured for Asian text in a PCS 7 project and you do not need
this Asian text, you can delete these language columns from the text library of all OS projects.
It is then possible to operate with a license key for the PCS 7 version and without a USB
hardlock.
Note
Projects older than PCS 7 V8.0
If you are running an older PCS 7 (<V8.0) we recommend to update it to PCS 7 V8.2. Follow
the steps in the corresponding manuals.
Note
Archive server
The central archive server (CAS) is not supported. Replace the CAS with the following PC
stations:
● Process Historian as external archive server
● Information Server as reporting system
You can find information on configurations in the documentation Process Control System
PCS 7; PCS 7 PC Configuration.
You can find information on migration in the documentation SIMATIC; Process Historian;
Process Historian Administration.
Note
In some cases, add-on applications/products require intermediate steps. Read the relevant
documentation before starting the software update.
Downloading Changes
Note
Sequencers from SFC charts are not canceled during a software update, provided no changes
have been made within the sequencer.
Libraries
As of PCS 7 V9.0, the libraries of PCS 7 are updated with each PCS 7 version. The following
libraries are installed by default:
● PCS 7 Basic Library
Contains the blocks of the PCS 7 Basic Library of PCS 7.
The PCS 7 Basic Library is a prerequisite for the use of the PCS 7 Library and the Advanced
Process Library.
● Advanced Process Library
Contains the blocks of the PCS 7 Advanced Process Library.
Note
Library required
Installation of additional PCS 7 libraries is required for the software update without utilization
of new functions.
You can find additional information on this in the section "Installation of Additional PCS 7
Libraries (Page 42)".
See also
Defining a strategy for the software update (Page 13)
Important Information
If you have used PCS 7 add-on products (software packages or hardware components) in your
process control system, ask your SIMATIC PCS 7 contact for advice.
Licensing levels
You can find an overview about licenses and configuration limits in the following documents:
● Catalog ST PCS 7 in the Internet via Technical Support (https://www.siemens.com/
automation/service)
● Documentation Process Control System PCS 7; Licenses and Configuration Limits (see
Preface: Options for accessing PCS 7 documentation)
Additional information
Online help for Automation License Manager
● You will receive information for every step as to where you must carry out the configuration
work.
● You can perform the full functional expansion of the PCS 7 project at a later point in time.
Note
You must complete the software update before beginning with any additional changes to the
configuration.
Recommendation:
Finish updating the engineering system and the project before you begin to update the other
PC stations.
Additional information
You can find information on this in this documentation and in the documentation on the Process
Historian:
● system manual SIMATIC; Process Historian Administration, "Migration" section
● Installation manual SIMATIC; Process Historian Installation Notes
5.1.1 How to Detach Attached Archive Segments on the Central Archive Server
Requirements
● Before you run the software update, perform these steps directly on the archive server
(Central Archive Server (CAS), or StoragePlus Server).
● You are authorized to access the Windows user interface on the CAS.
Procedure
1. In the Windows Start menu, select the "Administration Console" command from the
SIMATIC > StoragePlus submenu.
2. In the detail view, click "Detach".
The catalog of all linked archive segments which have already been swapped out is
displayed.
3. Select an archive segment you wish to remove from the archive.
4. Click "Open".
The selected archive segment is detached from the archive. Once the archive segment has
been detached from the archive, the archive segment is deleted from the hard disk of the
CAS. A message window shows whether the archive segment has been deleted.
5. Click "OK".
6. Repeat steps 2 through 5 for all closed archives.
Basic procedure
The following figure shows an example of the migration concept for a CAS (Central Archive
Server) database to the Process Historian in a PCS 7 environment.
(QJLQHHULQJ 5XQWLPH
26:LQ&&
(6
&$6
3&6bSURMHFW
26:LQ&&
3UHYLRXVYHUVLRQ
3&69 DVRI:LQ&&9
(6 26:LQ&& '%0LJUDWLRQ7RRO
3&6bSURMHFW 3URFHVV
+LVWRULDQ
26:LQ&&
Legend
1. Installation of a new PC station
Selection for PCS 7: Process Historian
You can find additional information on this in the documentation Process Historian;
Installation Notes.
2. Updating the software of the engineering station.
You can find information on this in the section "Installation of PCS 7 and settings on the ES
and OS (Page 37)".
Note
You must perform the steps listed below prior to carrying out an update in order to prevent
data being lost.
It is essential that you back up your PCS 7 project before you start the software update.
Additional preparations
Note
Updating SIMATIC BATCH
If you want to use and update SIMATIC BATCH in the project, make sure to read the important
information in "Updating SIMATIC BATCH stations (Page 79)" in preparation for the update.
Requirements
Note
Before you install or update PCS 7, you must prepare and backup your original project so that
you can perform the software update.
NOTICE
Ensuring safe system configuration
If you want to perform a software update in runtime, you must ensure the following:
● All configurations are complete.
Keep this in mind especially when you apply the engineering with several engineering
stations (multi-engineering).
● All changes are loaded in the system.
Archiving a project
1. In SIMATIC Manager, select the menu command File > Archive.
The "Archive" dialog box opens.
2. Select the "Multiprojects" (or "User projects") tab.
3. Select the project from the list that you wish to archive.
4. Click "OK" to save your settings.
The "Archive - Select Archive" dialog box opens.
5. Make the settings for the drive and the folder for the archive file.
Recommendation:
Select a name for the project's archive file which indicates the date on which archiving took
place.
Example: "yearmonthdayprojectname"; 151230pcs7proj
6. Click "Save" to apply your settings.
The archiving process begins.
Note
The archived project reflects the state of the project before the software update.
5. Compare the time stamps "Last compilation" and "Compilation of the loaded program".
CAUTION
Parameters will be overwritten
Please note that the parameters in the configuration will be overwritten. The decision
concerning whether to use this function will depend on the nature of the system involved and
must be made by the skilled personnel with responsibility for the system.
Backing Up OS Data
If you want to operate the OS server on a newly installed PC following the software update,
we recommend you back up the OS project of the OS server.
By default, the configuration data and the archive data of the OS are stored in the OS project
of the OS server.
To back up data, compress the project paths in this folder. Save the backup on a suitable
medium.
SIMATIC PDM
SIMATIC PDM configuration data is included automatically in the backup of a SIMATIC project.
Introduction
Generate a backup copy of any project library that contains a collection of user-specific blocks
for the project to be updated so that you can retrieve this data after having updated the
software. Carry out these steps for each library that you would like to back up.
Procedure
1. Start SIMATIC Manager.
No PCS 7 project must be open.
2. In SIMATIC Manager, select the menu command File > Archive.
The "Archiving" dialog box opens.
3. Open the "Libraries" tab.
4. Select the library to be backed up and click "OK".
The "Archiving - Select an Archive" dialog box opens.
5. Specify the file name and the storage path.
6. Click on the "Save" button.
Additional information
● Online help for STEP 7
Information in Faceplates
Faceplates visualize processes on the operator station and provide the plant operator with
information, such as:
● Measured values
● Operating limits
● Units
● Block operator texts
Requirement
● The required language is installed in your project.
Note
You can view the languages available in the project in SIMATIC Manager using the menu
command Options > Language for Display Devices. The number of available languages is
specified when Windows is installed (system characteristics).
Procedure
1. Open the project to be updated in the SIMATIC Manager.
2. Select the master data library folder in the Component View.
If this folder is not available, select the project folder.
3. Select the Options > Manage Multilingual Texts > Export menu command.
The "Export user texts" dialog opens.
4. Make the following settings:
– Select the storage location and format of the export file (*.xls or *.csv) in the "Text tables"
area.
– Select the target language and source language that correspond with the display
language in the "Language" area.
5. Click "OK".
6. If you have to manage several project-specific languages, repeat steps 3 to 5. Please note
that you then have to set different export file names or target directories.
Procedure
1. Open the "GraCS" folder in the OS project folder in Windows Explorer.
2. Create a folder for your own pictures.
3. Copy the pictures (EMF files) that are used into the newly created folder.
For more information on user-defined status displays, refer to the Process Control System
PCS 7; Operator Station manual.
Introduction
You must backup the license keys/authorizations stored on your hard disks before changing
the operating system or using new PC stations.
Note
You can backup all License Keys to a License Key USB stick that is available as of PCS 7
V7.1 or higher. You must transfer the authorizations to a License Key disk/multi-authorization
disk.
Additional information
● Online help for Automation License Manager
● Online help for WinCC Information System > Authorizations
Requirements
● The PCS 7 project data is backed up.
You can find detailed information about how to back up project data in the Process Control
System PCS 7; Service Support and Diagnostics manual, section "Safeguarding
Availability, Data backup".
● The hardware planning and hardware update are complete.
● The necessary preparations have been made.
● The operating system of the PC station to be updated is updated.
You can find information on approved operating systems in the documentation Process
Control System PCS 7; PCS 7 Readme.
● Read the latest information in the documentation Process Control System PCS 7; PCS 7
Readme.
– Hardware and software requirements, installation
– If you use an INTEL network adapter, install the driver suitable for your device type and
operating system version.
You can find information on the drivers in the documentation Process Control System
PCS 7; PCS 7 - Readme.
– Information on the software for the automation system of SIMATIC PCS 7 BOX:
The software for time synchronization must be installed for an update of SIMATIC PCS
7 BOX and SIMATIC PCS 7 AS RTX.
Note
Software update of password-protected projects
The software update of password-protected projects requires SIMATIC Logon on an ES.
Note
Archive server
The central archive server (CAS) must be replaced with a Process Historian.
You can find information on migration in the section "How to replace the CAS with the PH
(Page 62)".
Note
Sequence for starting Process Historian and OS server
● The Process Historian should be available and in the state "active", before the OS servers
are activated the first time. Otherwise the OS Servers has to be restarted after PH is
available and "active".
SIMATIC PDM
Install SIMATIC PDM on the engineering station if using the Maintenance Station of PCS 7
and if the project contains intelligent field devices configured with SIMATIC PDM. The PDM
Server must be installed on the engineering station for the complete Asset Management
functionality.
Read the information and requirements in the readme for the current version of SIMATIC PDM.
Note
Installing SIMATIC PDM
If you are using a PDM version lower than V8.0 SP1 and want to perform an update installation,
uninstall the old PDM version before the installation.
Installing PCS 7
If you use the "Update" function in the PCS 7 setup, we recommend you reboot the PC before
performing the installation.
1. Insert the Process Control System; SIMATIC PCS 7 DVD into the DVD drive.
2. Select the "Update" setup type.
You can find a detailed description of how to install the required software in the Process
Control System PCS 7; PCS 7 PC Configuration documentation, in the section "How to
Install PCS 7 Software".
Note
During the installation, a message will appear several times prompting you to reboot your
PC. Reboot the PC. The installation then continues automatically.
Additional information
● Documentation Process Control System PCS 7; PCS 7 Readme (see "Preface (Page 9)")
● Manual Process Control System PCS 7; PCS 7 PC Configuration
Note
Disruption of communication connections
Activation of the migration mode described below is only required if the communication
connections between the following PC stations must not be disrupted in any way:
● PC stations with access protection for communication
● PC stations without access protection for communication
Note
Change the access protection of communication in process mode of the plant.
This change is only possible for redundant PC stations in process mode of the plant.
Stop the process mode for each of the PC stations on which you currently want to perform the
change. For redundant PC stations, the partner station takes over process mode.
1. Temporarily enable the "migration mode" option for all PC stations for the next procedure.
2. Before activating encrypted communication without migration mode, evaluate the potential
impact.
NOTICE
Encrypted communication in a plant
Before you enable exclusive use of encrypted communication, you must ensure the
following:
● Migration mode must be enabled on all the required PC stations.
● The encrypted communication must be enabled on all the required PC stations.
3. Temporarily disable the "migration mode" option for all PC stations for the next procedure.
8. Click "OK".
Additional information
● Please note the documentation Process Control System PCS 7; PCS 7 PC Configuration;
section "How to access PC stations outside a subnet".
Note
Post-installing or removing PCS 7 libraries
If you install or remove an older version of the PCS 7 Library, PCS 7 Basis Library or PCS 7
Advanced Process Library after the installation of PCS 7, you must post-install the current PCS
7 version of the PCS 7 Basis Library. Install the required library by using the PCS 7 Setup.
This applies, for example, to PCS 7 libraries of older PCS 7 versions; see section "Installation
of Additional PCS 7 Libraries (Page 42)".
You can find the download files of the setups for PCS 7 libraries of older versions of the PCS
7 Library, the PCS 7 Basis Library and the PCS 7 Advanced Process Library on the Internet
(https://support.industry.siemens.com/cs/ww/en/view/109480136).
You can find information about the versions of the libraries (including updates) in the file
Process Control System PCS 7; PCS 7 Readme (online) (see "Preface (Page 9)").
Requirements
● The operating system including the required components is installed.
● PCS 7 has been installed.
● All applications are closed.
● The software needed for the required library is available, for example, on a shared drive in
the network.
Procedure
The following steps serve as an example.
1. Run the "SETUP" program.
2. Select a setup language.
3. Click "Next".
4. Follow the instructions of the setup wizard and then close the setup program.
5. After installing all the required libraries, you need to install the following libraries from the
latest Process Control System; SIMATIC PCS 7 DVD over them using the setup of PCS 7:
– PCS 7 Advanced Process Library (APL)
– PCS 7 Basic Library
Note
Installing the current library by means of the PCS 7 setup
The PCS 7 setup always installs the latest version of the library that is available on the
DVD.
Additional information
You can find additional information on the libraries supplied with PCS 7 on the Internet.
● PCS 7 Basis Library Readme V9.0 (online)
● PCS 7 Advanced Process Library Readme V9.0 (online)
● PCS 7 Basic Faceplates Readme V9.0 (online)
● PCS 7 Library: LIB-Readme.wri file
Basic procedure
This section describes how to update your PCS 7 project for use with SIMATIC PCS 7. The
PCS 7 project is updated on the ES in offline mode. Thus, system operation is not affected.
The target stations will only be loaded once all the update steps listed below have been
performed. For more information on downloading, refer to the Process Control System PCS
7; Engineering Station Configuration Manual.
Note
If you want to reuse existing projects without updating the automation system, you also need
to install the libraries of the existing project.
You can find additional information on this in the section "Installation of Additional PCS 7
Libraries (Page 42)".
Note
If you change individual texts with the functions in CFC, SFC or PH, be sure to immediately
compile the texts in all locations (for example, all block types and all copies of a block).
Otherwise, inconsistencies may occur and lead to the display of an incorrect language version
of this text.
Note
You must always import runtime data from the user archives in the language in which the
runtime data was exported.
Requirements
● Only for password-protected projects:
Deactivate password protection for the following actions.
Procedure
Carry out the following steps for a given OS project:
1. Open your project/multiproject in the component view of SIMATIC Manager.
2. Select an OS project of your choice.
If required, the "Migrator" dialog window is opened by the system.
The message "Migration is required ..." is displayed.
3. Click "Yes".
Note
Declining migration
If you decline the migration, you cannot change the OS project or load it.
You can start the migration at any time. To do this, select the menu command Options >
Migrate OS projects.
4. Check the project language set in the "Migrator" dialog box. If necessary, set the project
language in which the project was created.
Recommendation:
No settings are required in the dialog box.
– If you clear the "Migrate database only..." check box, considerably more time will be
needed for the migration.
– The migration of the excluded components in process mode has no effect on process
mode.
5. Click "Next".
The configuration of all operator stations contained in the multiproject/project is performed.
Note
Depending on the scope, the update process can take several hours.
Additional information
● Online help WinCC Information System > Migration
● Configuration manual Process Control System PCS 7; Operator Station
Requirement
● The project in SIMATIC Manager is open in the plant view.
Procedure
The following steps can be performed for the multiproject or for each individual project (in the
multiproject).
1. In the tree view, select the object to be checked (e.g., the multiproject).
2. Select the Options > Plant Hierarchy > Check Consistency command.
The program checks the Plant hierarchy.
The "Check Consistency – Log" dialog box opens.
3. Correct any errors if inconsistencies are found.
Note
If you need information on the possible inconsistencies, click the "Help" button in the "Check
Consistency - Log" dialog box.
7.2.6 How to update the hardware configuration for SIMATIC PCS 7 BOX RTX and
SIMATIC PCS 7 AS RTX
The steps described below only have to be carried out for projects with SIMATIC PCS 7 BOX
RTX or SIMATIC PCS 7 AS RTX implementation.
Replacing the automation system in the hardware configuration of the PC station.
Requirements
● The AS version in HW Config is not up to date (Version 3.3 or older)
● The assignments of communication processors to the master systems are known.
Procedure
1. Open the HW Config of the PC station (SIMATIC PCS 7 BOX RTX or SIMATIC PCS 7 AS
RTX).
2. Select the PROFIBUS CP to which the distributed I/O is connected.
3. Select the Edit > Master system > Disconnect menu command.
4. Select the CP.
5. Select the menu command Edit > Delete.
6. Select the "Win LC RTX" CPU in the rack in HW Config.
7. Go to the "SIMATIC PC Station > Controller > Win LC RTX" folder in HW Config.
8. Double-click the object "V4.6".
The "Insert ..." dialog box opens.
9. Click "Yes".
The controller is replaced.
10.Go to the" SIMATIC PC Station > Controller > Win LC RTX > V4.6" folder in HW Config.
11.Select the PROFIBUS CP used (default: CP 5613).
12.Drag-and-drop the selected PROFIBUS CP to the controller slot in the station window.
The "Properties ..." dialog box opens.
13.Select the entry of the associated bus system from the "Subnet" list.
14.Click "OK".
The "Insert master system" dialog box opens.
15.Select the entry of the associated bus system from the "Subnet" list.
16.Click "OK".
17.Select the Station > Save and Compile menu command.
Requirements
● The project/multiproject has been created.
● The SIMATIC PDM (Server) software package is installed on the Engineering Station.
Note
Requirements for use of SIMATIC PDM
Observe the conditions for the use of SIMATIC PDM versions.
Information is available in the SIMATIC PDM Readme (online).
Procedure
1. Select the Options > SIMATIC PDM > Settings command in SIMATIC Manager.
The "SIMATIC PDM settings" dialog box opens.
2. Select the "Maintenance Station" tab.
3. Go to the input field and enter the project/multiproject in which you have defined the MS
server or execute the following steps:
– In a multiproject:
Click "Current Multiproject" or "Browse." You can select the current project using the
"Browse" button.
– For a project:
Click on "Current Project" or "Browse." You can select the current project using the
"Browse" button.
4. Click "OK".
5. Open SIMATIC Manager in the component view.
6. In the project, select the engineering station in which you wish to insert the "PDM Server"
object.
7. Double-click the "Configuration" object in the detail view.
The hardware configuration of the SIMATIC PC station opens.
If you cannot see the hardware catalog, select the View > Catalog menu command.
The hardware catalog opens.
8. Select SIMATIC PC Station > PDM Server from the list in the folder.
9. Drag and drop the "PDM Server" object to the PC station of the engineering station.
Additional information
● STEP 7 and SIMATIC PDM Online Help
● Whitepaper SIMATIC; Security concept PCS 7 and WinCC - Main document
Note
Operating system change
When you change the operating system, the network adapters may be detected in a different
order in the system. This is caused by the operating system.
Take this into consideration with systems with multiple network adapters and adapt the
configuration accordingly in HW Config.
Update the version of the communication components in the Station Configuration Editor and
HW Config.
Requirement
● The PCS 7 project is open on the ES.
Procedure
1. Select the PCS 7 project in SIMATIC Manager.
2. Select the menu command Options > Configure Network.
NetPro opens.
3. Select the menu command View > Cross-Project Network View.
The cross-project network view is displayed.
This allows you to toggle directly between all projects in the multiproject.
Requirement
● The PCS 7 project is open on the ES.
Note
This procedure must be carried out for all S7 programs in your PCS 7 project.
NOTICE
Updating a redundant OS in runtime
Updating according to the manual Process Control System PCS 7, High Availability
Process Control Systems; Guidelines for updating a redundant OS in runtime
If you update a redundant OS during operation, do not load the AS until phase 3 (in step
6 of the Process Control System PCS 7; High Availability Process Control Systems
manual).
Note
If you use SFCs in your project, please note that you need to update the SFC blocks.
Note
This procedure must be carried out for all projects in your PCS 7 multiproject.
Note
Beside CFCs, the "Shared Declarations" has to be migrated also.
Additional information
SFC Readme
7.4.3 How to Synchronize OS Basic Pictures, Local Computer Actions, and Faceplates
Perform the following steps for the projects of each operator station (server and clients).
Requirements
● The operator stations contained in the PCS 7 project have been updated with the Project
Migrator.
● The PCS 7 OS is open in WinCC Explorer.
Procedure
1. Select the OS Project Editor and select the menu command Open in the shortcut menu.
2. Select the "Complete configuration" check box on the "General" tab.
3. Click the "Layout" tab.
4. Select the required layout and the monitor configuration.
5. Click the "Basic Data" tab. Make the required settings in accordance with the "Basic Data"
table below.
6. Only carry out this step if the "For observation only" authorization level must be activated
for some users after the software has been updated.
Select the "Message Display" tab.
Activate the required message filters (see the "Message Filters" table below).
Note
No settings are necessary for the software update on the remaining tabs. The default
settings can be applied.
7. Click "OK".
Basic Data
Note
Projects prior to PCS 7 V8.1
In PCS 7 V8.1 or higher, the Dynamic Wizard has been changed because of the AS-granular
structure types.
Ensure that the "Update Dynamic Wizard Scripts" check box is selected.
Message Filters
Parameters Meaning
Messages that The message windows have two message lists.
can be acknowl‐ One list shows all messages from the area for which the user has access rights for all "operator process
edged in a sepa‐ controls". The user can acknowledge messages in this list.
rate list
The other list shows all messages from the area for which the user has an "authorization for area" but no
access rights for "operator process controls". The user cannot acknowledge messages in this list.
The message line in the overview area only shows messages that can be acknowledged with the access
right for "operator process controls".
Messages that Both of the message pages indicated above are available to the user. Only messages from areas for
can be acknowl‐ which the user has access rights for "operator process controls" are displayed on the message page with
edged on a sepa‐ only one list and in the message line of the overview area.
rate page
(switch-selecta‐
ble)
Additional information
● Online help WinCC Information System > Options > Options for Process Control > OS
Project Editor
● Online help OS Project Editor
7.4.4 Mixed operation and visualization of AS blocks from different PCS 7 versions
Rules
Process pictures can visualize the signals that AS blocks receive from different APL library
versions.
The same block icons for AS blocks from different library versions can be shown in the process
pictures of an OS. If an OS is assigned to several AS, only AS blocks of the following versions
of the Advanced Process Library can be configured for each AS:
● AS blocks from PCS 7 V8.x
● AS blocks from PCS 7 V9.0
The block icons are inserted into the process pictures when the OS is compiled. The standard
picture "@PCS7TypicalsAPLV8.pdl" serves as template for creating/updating the block icons
of all AS in the process pictures.
Introduction
If you have manually inserted and interconnected picture objects from a template picture into
a process picture, you must manually update these picture objects.
When the picture objects are updated, the block icons of the previous PCS 7 version are
replaced with the block icons of the current PCS 7 version.
You have to use the corresponding template picture that you used for configuration to update
the picture objects.
Recommendation: Perform the update one by one with each template picture of the library
used.
● For block icons of the PCS 7 library:
"@Template.pdl" or "@@PCS7Typicals.pdl"
● For APL block icons
- "@PCS7TypicalsAPLV8.pdl"
- "@TemplateAPLV8.pdl"
Only the block icons of the selected template picture are updated.
Requirements
● The operator stations contained in the PCS 7 project have been updated with the Project
Migrator.
● All basic pictures are replaced with the OS Project Editor.
● The PCS 7 OS is open in WinCC Explorer.
● Read the following section in the Process Control System PCS 7; Operator Station
configuration manual; section "Rules for using multiple template files".
Procedure
1. Open any WinCC picture containing a picture object in the Graphics Designer. Select the
picture object.
2. In the dynamic wizard, open the "Picture Functions" tab and select "Update Picture
Objects".
This "Dynamic Wizard" dialog opens.
3. Click "Next".
4. Select the "Yes, all pictures" check box.
5. Click "Next".
6. Select the template in the list which has been configured with the picture objects of the OS.
(Default:@Template.pdl)
7. Select the default "TemplateControl.cfg" configuration file in the "Please specify name of
configuration file" field.
8. Click "Next".
9. Click "Finish".
Generation of the picture objects is initiated in the Dynamic Wizard.
NOTICE
Upgrading Process Historian before the OS servers in runtime
You must first upgrade the Process Historian server to Process Historian as of PCS 7
V9.0 before you
● upgrade a PCS 7 plant to version PCS 7 V9.0 in runtime
● and simultaneously upgrade the operating systems of the OS servers, e.g. Server 2008
to Server 2012
● or replace the hardware of the OS servers
You can only start upgrading the OS servers in runtime when the Process Historian is
in the "Active" operating state and all pending restores have been executed.
Start the restore operation multiple times, if necessary, if you still detect data gaps.
You can start the restore operation manually in the management console or with the
PH tray icon.
● Information Server
You can find information on this in the SIMATIC HMI; SIMATIC Information Server system
manual
Requirements
● The Process Historian is installed.
● The Process Historian is configured according to the guidelines specific to the plant (new
PC station in the workgroup/domain - network addresses, user etc.).
● The software of the engineering station is updated.
● The PCS 7 project is updated.
Procedure
1. Open the SIMATIC Manager on the engineering station.
2. Open the PCS 7 project in the component view.
3. Do the following in the component view of SIMATIC Manager:
– If the CAS station is located in a separate project in the multiproject:
Select the project of the CAS station.
Select Multiproject - Remove from multiproject from the shortcut menu.
The CAS station is removed from the multiproject.
– If the CAS station is located in a project with other stations:
In the component view of SIMATIC Manager, select the PC station with the "CAS" role.
Select Delete from the shortcut menu. Click "Yes".
The CAS station is removed from the project.
4. Perform the following sequence of tasks for all OSs in the multiproject that have stored data
on the CAS (OS servers and single-station systems):
– Open the "Backup Configuration" tab in the "Properties" dialog of the PC station.
– Clear the "Backup enabled" check box for the following options:
- Tag Logging > Archive configuration > Tag Logging Fast
- Tag Logging > Archive configuration > Tag Logging Slow
- Alarm Logging > Archive configuration > Message archive
Note
CAS backup configuration
If there is no longer a CAS computer in the project but the destination paths are entered,
a process control error is generated at each segment transition.
5. Perform the following sequence of tasks for all operator stations in the multiproject that
have a CAS assignment:
– Select the OS project in the component view of the SIMATIC Manager on the PC station.
– Select the menu command Options > OS > Assign OS Server....
The "Assign OS Server ..." dialog box opens.
– In the list of OS servers, check the following:
Make sure that the check box for the OS server with the data you want to visualize on
this operating station is selected.
– Clear the check box for the PC station of the CAS.
6. Create a new PC station for the Process Historian in the project.
7. Configure a new PC station for the Process Historian.
You can find additional information about this in the documentation Process Control System
PCS 7; Engineering System.
Save and compile the configuration.
8. Set the properties in the SIMATIC Manager. For this purpose, select the Process Historian's
PC station and then select the shortcut menu command Object properties.
9. Enter the computer name in the "Computer name" group or activate the "Computer name
identical to PC station name" check box.
10.Click "OK".
The "Properties" dialog box closes.
Note
SNMP tag export (export entire plant configuration) has to be executed during the update of
the PCS 7 software to V9.0.
7.6.2 How to change the OPC Server, adapt the SNMP configuration and update
SIMATIC PDM
Requirements
● The blocks, charts and OS pictures of the project are updated.
● The SIMATIC programs and OS are compiled.
● The PC stations of the Maintenance Station (MS Server and MS Client) are updated in a
similar way to an OS.
● MS single station system
– An OPC server is configured on the PC station of the MS single station system.
Procedure
1. Select the PC station in the Component View.
– In an MS multiple station system, this is the PC Station of the MS Server or of the
redundant partner.
– In an MS single station system, this is the PC Station of the MS single station system.
2. Double-click the "Configuration" object in the detail view to open HW Config.
The hardware configuration of the SIMATIC PC station opens.
If you cannot see the hardware catalog, select the View > Catalog menu command.
The hardware catalog opens.
3. Select the current version of the OPC Server from the hardware catalog at SIMATIC PC
Station > User application > OPC Server and drag-and-drop it to the position of the OPC
Server.
4. Click "OK" to confirm the replacement of the OPC Server.
5. Save and compile your changes.
6. Select the "OPC Server" object in the rack.
7. Select the menu command Station > Properties.
8. Open the "SNMP" tab.
9. Click the "Export Tags for WinCC" button.
10.Select the Station > Save and Compile menu command.
11.Repeat steps 1 to 5 if using the MS Server in a redundant MS multiple station system.
When you open a project in SIMATIC Manager, the SIMATIC PDM-related project data is
updated automatically.
Note
Updating SIMATIC PDM up to V9.1
During the update of projects with SIMATIC PDM up to V8.0, new PLT IDs are assigned to the
configured ASSETMON objects. Then, perform the following steps:
● Adapt these PLT IDs to the corresponding ASSETMON block instances.
● Compile the automation systems.
● Create the diagnostics screens again.
● Compile the corresponding operator stations.
Introduction
If you operate a PCS 7 Maintenance Station in your project, various settings must be migrated
when upgrading to the current PCS 7 version.
Requirement
Note
If the project was retrieved
If the project was retrieved to update the software, additional steps are necessary when you
use a Maintenance Station:
1. Compile the hardware configurations of all automation systems.
2. Compile all automation systems with the option "Update module drivers".
Procedure
1. Select the multiproject in the plant hierarchy.
2. Select the Options > Plant Hierarchy > Settings... menu command.
The "Customize Plant Hierarchy" dialog opens.
4. Click "OK".
Note
If you want to restore the project-specific changes, you have to adapt the automatically
created overview screen. After the "Migrate diagnostic settings" function, copy the project-
specific changes from the renamed overview screen of the project that is to be updated to
the current overview screen.
Requirements
● The OS Project Editor was executed. It is not necessary to make any settings in the OS
project editor.
● A backup copy of the diagnostics screens with project-specific adaptations has been
generated.
● An asset ID has been assigned to each AS and PC station in HW Config.
● Diagnostics settings are updated.
Procedure
1. Select the multiproject (project) in the plant hierarchy.
2. Select the Options > Plant Hierarchy > Create/Update Diagnostics Screens menu
command.
Update the diagnostics screens. You can find information on this in the Process Control
System PCS 7; Operator Station Configuration Manual.
3. Compile the OS of the Maintenance Station.
4. Update the server data of the MS server.
5. Download the MS server.
Additional information
For information on options for accessing maintenance functions, refer to the following
documentation:
● You can find an explanation of how to work with the maintenance station in process mode
in the Process Control System PCS 7; OS Process Control function manual.
● Configuration manual Process Control System PCS 7; Operator Station
● Function manual Process Control System PCS 7; Maintenance Station
Requirement
In order to utilize the full functional scope of the PCS 7 Web Option for OS, you may only use
blocks from the current PCS 7 library in the PCS 7 project.
Procedure
● You update the OS Web server, an OS client, similar to an OS client.
● The process pictures that will be opened on a Web client must be "published" again.
Additional information
For more information, refer to the Process Control System PCS 7; Web Option for OS Manual.
Additional information
● Refer to the respective components that use SIMATIC Logon to find detailed instructions
about the setup, configuration and changes needed for SIMATIC Logon.
● You can find basic, generally applicable information about SIMATIC Logon in the online
help for SIMATIC Logon.
Requirements
● The PC station has been configured.
● The configuration in CFC and SFC has been completed.
Note
If you have changed unit and operator texts of the block types in the master data library,
be sure to set your default language as the "Language for display devices".
Procedure
Note
You can find additional information about the compilation options in the configuration manual
Process Control System PCS 7; Engineering Station.
1. Select the object (multiproject, project, station) in SIMATIC Manager that you wish to
compile or compile/download.
2. Select the PLC > Compile and download objects command in SIMATIC Manager.
The "Compile and download objects" dialog box opens.
3. Open the tree structure.
4. Activate the check box in the "Compile" column for all objects that you want to compile.
5. Click the "Operating State" button and check the operating states of your objects (RUN,
activated, etc.) so that you can make the correct settings for compilation.
6. Select the OS that you wish to compile.
7. Click "Edit".
The "Settings: Compile OS ... Areas ..." dialog box opens.
8. Click "Next".
The "Settings: Compile OS ... Network Connections ..." dialog box opens.
9. Click "Next".
The "Settings: Compile OS ... Compilation Data and Scope of Compilation" dialog box
opens.
10.In the "Scope" group, activate the "Entire OS" and "With memory reset" check boxes.
11.Click "Apply".
Note
Once you have completed your settings for compiling an operator station, please wait until
the compilation settings have been saved and the download dialog box appears.
NOTICE
Updating a redundant OS in runtime
Updating a redundant OS during operation (according to the manual Process Control System
PCS 7, High Availability Process Control Systems; Guidelines for updating a redundant OS
in runtime)
If you update a redundant OS during operation, do not load the AS until phase 3 (in step 6 of
the High Availability Process Control Systems manual).
Requirement
● The network addresses and network settings of the PC stations are configured.
● The configuration of the PC stations match in HW Config and in the Station Configuration
Editor.
● The PC station has been configured.
● The configuration and connection data of all stations has been downloaded via NetPro.
Procedure
1. Use the search box in the start menu to open "Set PG-PC Station".
2. Check the setting of the access points on each PC station (locally).
3. You can successively download all target systems systematically and automatically.
In the SIMATIC Manager, select the menu command Target system > Compile and
Download Objects.
Additional information
You can find additional information about this in the Process Control System PCS 7;
Engineering System manual.
Introduction
Sequence for activating process mode (Runtime):
● Process Historian (if available in the project)
● Master server (OS server)
● Standby server (redundant OS server)
● OS clients
Introduction
Before activating the projects downloaded to the various OS servers, you need to check some
of the settings in each OS.
Requirements
● The PCS 7 OS is open in WinCC Explorer.
● The following applies if a Process Historian is in the project:
– The Process Historian has the "Active" status.
– The "PH-Ready Configuration" is performed on each OS server.
Procedure
1. Open the "Redundancy" editor in WinCC Explorer.
2. Check all settings.
3. Click "OK".
4. Open the "Time Synchronization" editor in WinCC Explorer.
5. Check all of the settings in the dialog box.
6. Click "OK".
7. Repeat steps 1 through 6 for the second OS server and all other redundant OS servers.
Note
If you have installed a new operating system or have changed the settings, restart the
computer.
Note
Process Historian
After activating process mode, the OS server automatically connects to the Process Historian.
● For non-redundant systems, the data is sent to Process Historian starting with the activation
of the process mode.
● For redundant systems, only data from the current master is sent to the Process Historian.
You can now import data segments created before the software update using Process Data
Migrator on the Process Historian.
You can find information on this in the section "How to migrate the archives in the Process
Historian (Page 84)".
Requirement
● The PCS 7 OS is open in WinCC Explorer.
Procedure
1. Open the "Time Synchronization" editor in WinCC Explorer.
2. Check all settings.
3. Click "OK".
4. Repeat steps 1 through 3 for the other OS clients.
5. Activate process mode on the OS clients.
Note
Note the following when updating the software to PCS 7 V9.0 (with SIMATIC BATCH):
● No batches should be actively running, because the BATCH database is restored from a
backup for the software update.
● Set the BATCH Start Coordinator to "Manual" start mode before you update the software.
It is essential that you observe these points when you prepare the software update. You can
find additional information on this in the section "Overview of preparations (Page 30)".
Note
Library of SIMATIC Route Control V9.0
You should apply the library of SIMATIC Route Control V9.0 for SIMATIC Route Control V9.0.
The automation system must be in STOP in order to load these libraries.
Requirements
● The CAS databases were created with a central archive server as of PCS 7 V7.0 (Storage
Plus V1.2 )
● The archive data was swapped out with a PCS 7 version (Storage Plus V1.2) >= V7.0.
● The Process Historian is created and configured in the PCS 7 project.
● The Process Historian was started before the OS servers.
● The database of the central archive server is accessible from the Process Historian.
● The OS servers are in process mode. The connection to the Process Historian has been
established.
● The current data is archived on the Process Historian.
Archives on OS servers
The last archive segments of the OS servers are no longer swapped out to the CAS by the
OS servers. You must import these archives directly from the OS servers in the Process
Historian.
Keep in mind that this import must happen rather timely, depending on the setting of the OS
server circulating archives.
Recommendation: Start by importing those archive segments of the OS servers that were not
swapped out to the CAS.
Note
All CAS databases are migrated in the background during operation.
You must perform the data migration for each OS subproject.
Additional information
You can find detailed information on this in the documentation SIMATIC; Process Historian;
Process Historian Administration.
B M
Backup, 30 Migrating diagnostics settings, 66
Mixed operation, 58
C
Central archiving
O
Adaptations, 27 Operating principle, 69
Changing the Configuration of Multilingual Texts, 46 PCS 7 Web Option for OS, 69
Checking and adapting connection data in Operation and display texts
NetPro, 52 Exporting, 34
Checking Plant hierarchy consistency, 48 Operator texts or display texts, 34
Compiling the OS, 70 OS
Converting CFC/SFC charts, 53 Checking the settings on OS clients, 77
Checking the settings on OS servers, 76
Overview of compiling, 70
D Overview of the activation, 75
Updating with the Project Migrator, 47
Documentation
User Interface in Process Mode, 55
Access options, 10
Overview
for planning and configuration, 10
Adaptation of OS-relevant settings, 55
Adaptation on operator stations, 55
Adaptations in NetPro, 52
E Converting CFCs/SFCs, 52
Exporting General adaptations in the project, 46
Operation and display texts, 34 Software update procedure, 24
Overview of activating the operator stations, 75
Overview of additional options, 69
I Overview of downloading, 73
Import Runtime Data, 46
Importing Data from the User Archives, 46
Information on software update, 17
P
Installation Password protection, 47
PCS 7, 38 Preparing for the software update, 30
SIMATIC PDM, 39 Process Historian
Adapting Archives, 84
Project Migrator
Password protection, 47
R
Requirements, 15
Runtime data, 46
S
Selecting the Correct Documentation, 13
StoragePlus
Detaching archive segments, 27
Overview of Adaptations, 27
U
Updating
BATCH, 79
OS with Project Migrator, 47
PCS 7 components that use SIMATIC Logon
services, 69
PCS 7 project, 45
Updating PCS 7, 38
User Interface in Process Mode, 55
W
Web Option for OS, 69
WinCC 3D design, 55