CHAPTER 1
The School Improvement Plan (SIP) of Del Corpuz Ramento Elementary School (DCRES) of Cabatuan,
Isabela was conceptualized and formed in accordance with R.A. 9155 also known as the Governance of Basic
Education Act of 2001.
The formulation of SIP caters the total development and improvement of the school through shared
responsibilities of the school and community it serves. It is along this line that the school tapped all the
stakeholders for a collaborative task to attain the standards set among the pupils, teachers, parents, school
head and the community.
It was also made, because it establishes the changes of the school need to improve pupils’
achievements and show how and when these changes will be made. Moreover, it was also designed to
improve weak areas in academic and administrative performance hence learning strategies will be
implemented for better quality education.
Further, it shall also serve as a “road map” for the school head in managing the school taking in
consideration of the different goals and objectives in every area of our educational system. The school head
using this document can make representations and create linkages to elite benefactors and other concerned
citizen that would be extending their assistance to all school concerns in realizing the goals and objectives for
optimum development.
The SIP is a three-year institutional plan that will be implemented, monitored and evaluated yearly to
meet all the targets of the program for better quality education, for better institution of learning and for
better learner.
The planning committee has determined perennial problem affecting the academic performance of the
pupils. And one of the main concerns has been reflected in the National Achievement Test (NAT) results. It
can be observed the low performance of the learners hence the need to address to this problem is a priority.
The team has to devise means or tools that have to be a collective effort not only from the pupils and teachers
but also to the parents and other stakeholders in this learning institution.
In like manner, the teachers’ professional and personal growth should also be given emphasis. The
need to improve instruction is needed. Competence and efficiency in teaching is the key to better learning.
Therefore the need for trainings and seminars for teachers is essential. Moreover, it is encourage for the
teachers to undergo continuous education as they pursue their master’s and doctorate degree and engage into
research to enhance the curriculum and the teaching-learning process.
The physical aspect of the school should also be given main concern in order to be functional and could
cater the needs of the learners. The improvement of facilities such as laboratory, canteen, library, clinic, ICT
room and others will be continuously monitored and repaired. The stability of these facilities will depend on
the budget allocation of the different projects and programs to be implemented.
The planning team, members of the GPTA officials, stakeholders and other persons involved in the
committee to give their time, effort and assistance to create the ESIP. In this view, we are able to achieve the
plans and programs of the school and that there is great support to the department’s mission and vision as a
whole.
1|Page
Del Corpuz Ramento Elementary School is an institution wherein learning is our never ending vision.
DCRES’s Mission:
Partnership with parents and community
Accept the diverse needs of all learners
Work to enhance intrinsic motivation and personal responsibility
Strive to become life-long learners, globally competitive individuals and productive members of
society by helping them reach their fullest potential.
2|Page
Frame
1. Organizing and Preparing the SPT To orient the SPT about the tasks at April School Head
hand re: roles and responsibilities SPT
To determine what resources
(budget, supplies and equipment,
venue, etc.) are needed in the
preparation of the SIP
2. Collecting, organizing and To gather data from the school April-May- SPT
analysing of school data management information system June
(SMIS)
To gather survey results
To fill-out school report card
3. Identifying core values and To identify core values, vision and June SPT and SGC
formulation vision and mission mission
4. Determining goals and objectives To determine goals and objectives June SPT
5. Formulating Work and Financial To formulate the Work Financial June-July SPT
Plan and Annual Implementation Plan and Annual Implementation
Plan Plan
6. Developing the School Monitoring To develop the School’s Monitoring July SPT
and Evaluation Plan and Structure Evaluation Plan and Structure
7. Organizing for Implementation To prepare the school for SIP July School Head
Implementation SGC
School
Community
8. Writing the SIP To finally organize the contents of July SPT
the plan with reference to item SGC
number 2-7 of this table
9. Presenting the SIP to the School To submit the SIP to the School July SPT
Council for approval and Division for Council and Division for the Division
the acceptance acceptance
10. Preparing advocacy plan for the To determine strategies to July- SPT
SIP effectively advocate for support of August School
the plan for from various Community
stakeholder
11. Communicating the Plan To present the plan to the July SPT
stakeholders onwards School
Community
12. Orientation, Implementation To conduct workshop on the July SPT
and Start Up implementation start up; clarify onwards School
roles of those involved and Community
determined the activities in the
implementation of the SIP
CHAPTER 2
3|Page
ASSESSMENT
School Situation
The relative distance of the school is approximately 5 kilometers from the poblacion and from the district
office. The distance of the school from the division office is 47 kilometers. The means of transportation are
tricycle and passenger jeepneys.
No historical record of incidence of crimes and other human-induced and natural hazards in the last 3 years.
School Profile
The enrolment of DCRES for the past 3 years somewhat fluctuates. From 88 total enrolment in SY 2017-2018,
it increased to 91 in SY 2018-2019 and decreased to 77 in SY 2019-2020. In the current school year, 41 are boys
and 36 are girls.
Situation Analysis
DCRES pupils health and nutritional status poses a challenge to the educational achievement of pupils. For the
current school year, 3 boys and 3 girls (total 6) were weighed and found wasted.
Learners Materials
One important factor that helps in the pupils’ academic development is the presence of the learning materials.
Based on the records of the school, there is a shortage of learning materials especially in Grade 6 - English,
Filipino, AP, Science, MAPEH and TLE.
The school needs library or a reading center. There is a need of putting up a school library or reading center
since it will become a learning resource development center for the school.
The school has a total of 6 nationally-funded teachers for SY 2019-2020 comprising of a master
teacher acting as Teacher in-charge. One teacher serves in the Kindergarten, one serving in Grade 1 as
multi-grade teacher for Grades 2 and 3, another teacher serving in Grades 4 and 5, and one teacher
serving in Grade 6. Teachers undergo national, region, division and district seminars to further enhance
their classroom instruction as well as their leadership capabilities.
Funding sources
4|Page
DCRES struggles to accomplish achievements through awards and recognitions.
Performance Indicator
Access
Dropout rate is relatively low. For the past three years, only one incident of dropout was recorded. This
was due to domestic related factor. Projects and interventions were implemented for children at risk of
dropping out. Some of the school mechanism in addressing the said issues are home visitation and
constant parent dialogs.
Quality
During the SY 2018-2019 a total of 90 number of promoted pupils from Kinder to Grade 6. 47 are male
and 43 are female. The school recorded a 100 percent of learners who completed for the school year
2018-2019 from K to Grade 6.
In addition, The result of National Achievement Test (NAT) for SY 2014-2015 significantly reduced. There
is a need to address pupils problem and may be given more consideration and motivation by improving
their academic performance.
Literacy
Under the literacy level, the result of the Pre-test in the Phil-IRI on English and Filipino for the SY 2018-
2019 shows that more than 30% of the respondents fall under frustration level. However, the English
and Filipino Department intensified their existing program helping pupils developed their
comprehension skills reducing the number of respondents to fall under the frustration level.
Governance
The School-Based Management Assessment Level falls under “Developing”. Furthermore, the school got
a rating of “60 ” from the Child Friendly School survey resulting of being a Child-Friendly School.
Stakeholders support to education has been observed. For Brigada Eskwela conducted last summer, the
school received in cash and in kind donations.
5|Page
IMPROVEMENT STRATEGIC URGENCY MAGNITUDE FEASIBILITY
AREA INTERPRETATION
IMPORTANC
E
DECREASE THE
5 5 5 5
ACCESS NUMBER OF VERY HIGH
DROPOUT BY O % PRIORITY
IN THE NEXT
THREE YEARS
REORIENTATION
OF IPPD TO ALL 4 4 4 4
QUALITY HIGH PRIORITY
TEACHERS FROM
KINDER TO
GRADE6
INCREASE
READING 5 5 5 5
QUALITY VERY HIGH
PROFICIENCY
PRIORITY
LEVEL IN THE
NEXT THREE
YEARS
CONSTRUCTION 5 5 5 5
OF COMFORT
GOVERNANCE ROOMS VERY HIGH
PRIORITY
CONSTRUCTION 4 4 4 4
OF THE MULTI
GOVERNANCE HIGH PRIORITY
PURPOSE HALL
CONSTRUCTION 4 4 4 4
OF 1
GOVERNANCE HIGH
LIBRARY/READI
PRIORITY
NG CENTER
6|Page
SCHOOL IMPROVEMENT PLANNING (PLANNING WORKSHEET)
CHAPTER 3
PLAN
Project Objective Statement: To reduce the dropout rate by 0% within the next three school year
Root Cause: Root Cause: High dropout rates due to the following:
- financial matters
- health problems
1.Identify LARDO in
August 1,
different grade levels List of LARDO Class Advisers 0.00 N/A
2019
1. List of
3.Identify learners who Pantawid
are members of members SPG Officers Pantawid
Pantawid, those who 2. List of pupils Coordinator, School
have sponsors, and who have Guidance
0.00 N/A
those who have sponsors
prospect for sponsors 3. List of pupils August 12,
who have 2019
prospects
for sponsors
4.Provide parents SPG Officers Pantawid
information on possible August 12,2019 Coordinator,
solution to address Well informed School Guidance
0.00 N/A
absenteeism of the parents
Learner
7|Page
Project Title: 2. Project Read to Lead
Project Objective Statement: To reduce the identified frustration readers by 10% at the end of the school Year
Root Cause: Root Cause: Low reading performance for the past 3 years.
Project Work Plan and Budget Matrix
Project Objective Statement: To increase the ICT Skills, numeracy skills and reading proficiency level of learners.
Root Cause: Root Cause: Poor ICT Skills, numeracy skills and reading proficiency of learners for
the past 3 consecutive years
Project Work Plan and Budget Matrix
8|Page
introduced
Project Title: 3. Project I LAB- ICT( Interactive Learning Activities Beneficial to Learners
through ICT)
Project Objective Statement: To Enhance Instructional Instructions by using interactive learning activities.
Project Objective Statement: To Implement Hygiene and sanitation in school thru implementation of the DepEd
program.
9|Page
ts, Barangay
facility Officials,
Stakeholders
Improved SY 2019-2022
School Head, Php 40,000.00 Personal,
comfort rooms Teachers,Pare MOOE,
Put up He/She toilet Solicitatio
in every nts, Barangay
Officials, n
classroom
Stakeholders
SY 2019-2022
Ceiling of School Head, Php 70,000.00 Fund
Repair/ installation of Teachers,Pare raising
Grade 6/5
ceiling of classrooms nts, Barangay
Classroom Officials,
Stakeholders
10 | P a g e
Root Cause: Root Cause: Malnutrition
Project Work Plan and Budget Matrix
SY 2019-2022
School Head, Php 10,000.00 ,MOOE,
Teachers, Solicitatio
Vertical
Project VEGAS Parents, n, LGU
Gardens
Barangay
Officials,
Stakeholders
Chapter 4
11 | P a g e
The SPT will monitor the progress at the middle and end of the implementation period.
Using the Project Monitoring Report Form, the SPT will be able to monitor the status of the project.
To provide good
Project – ceiling
KISAME insulation of
classrooms.
Project VEGAS To provide
(Vertical awareness on
Gardening in organic vertical
School) gardening.
To provide
nutritious fruits
and vegetables
for
malnourished
12 | P a g e
learners from
the outcome of
the garden
using organic
fertilizers.
To complete the
construction of
the
Project Multipurpose
SHADE hall.
(School’s Hall
to Attain
Developing To provide
Environment) convenient hall
to all learners
and
stakeholders.
Prepared by:
PATSON P. OPIDO
School Head
KATHY C. PAGUD
PTA President
ELMER M. MAGALAD
Brgy. Captain
WILFREDO I. ALIPIO
DRRM Coordinator
CHARIBEL P. SANTOS
School Guidance Coordinator
13 | P a g e
Department of Education
Region 02(Cagayan Valley)
SCHOOLS DIVISION OFFICE OF ISABELA
Alibagu, City of Ilagan, Isabela 3300
This
Certificate of Acceptance
is hereby awarded to
for having successfully complied and met the requirements and standards
of the Department of Education in crafting its Enhanced School Improvement Plan (ESIP)
for 2019-2021 as mandated by DepEd Order No. 44, s. 2015.
14 | P a g e