Final Manual For Specification Standards
Final Manual For Specification Standards
through
Public Private Partnership
MANUAL
OF
SPECIFICATIONS & STANDARDS
Planning Commission
Government of India
New Delhi
IRC:SP:73-2007
This is a technical document which has been produced by the Indian Roads Congress. For any further
technical clarifications please contact:
Secretary General
The Indian Roads Congress
Sector 6, R.K. Puram
New Delhi-110 022
Foreword ix
Preface xiii
1 General 3
pc/coi iii
MANUAL OF SPECIFICATIONS AND STANDARDS
5 Pavement Design 47
5.1 General 47
5.2 Method of Design of Flexible Pavements 47
5.3 Method of Design of Rigid Pavements 48
5.4 Design of New Pavements 48
5.5 Design Traffic 49
5.6 Subgrade 50
5.7 Pavement Components and Materials 50
5.8 Performance Evaluation 52
5.9 Widening and Strengthening of Existing Road to
Two Lane with Paved Shoulders 53
5.10 Design of Strengthening Treatment (Overlay) 55
5.11 Construction, Workmanship and Quality of Work 57
5.12 Premature Distress 57
5.13 Detailed Design Report 58
6 Roadside Drainage 63
6.1 General 63
6.2 Surface Drainage 63
6.3 Median Drainage 64
6.4 Drainage of High Embankment 64
6.5 Catch Water Drains 65
6.6 Sub-surface Drains 65
6.7 Internal Drainage of Pavement Structures 67
6.8 Survey, Investigations and Design Report 67
7 Design of Structures 71
7.1 General 71
7.2 Design Loading and Stresses 71
iv IRC:SP:73-2007
CONTENTS
pc/coi v
MANUAL OF SPECIFICATIONS AND STANDARDS
vi IRC:SP:73-2007
CONTENTS
Appendices
pc/coi vii
Foreword
pc/coi ix
MANUAL OF SPECIFICATIONS AND STANDARDS
x IRC:SP:73-2007
FOREWORD
(Gajendra Haldea)
Adviser to Deputy Chairman,
May 20, 2007 Planning Commission
pc/coi xi
Preface
pc/coi xiii
MANUAL OF SPECIFICATIONS AND STANDARDS
xiv IRC:SP:73-2007
PREFACE
(V.K. Sinha)
Secretary General, IRC
April 2007
pc/coi xv
MANUAL OF SPECIFICATIONS AND STANDARDS
xvi IRC:SP:73-2007
Section 1
General
Blank
SECTION 1
GENERAL
1.1 The scope of the work shall be as defined in the Concession Agreement. Two Laning/
Two Laning with Paved Shoulders of the Project Highway shall be undertaken and
completed by the Concessionaire as per the Specifications and Standards set forth in
this Manual.
1.2 The Project Highway and the project facilities shall conform to the design
requirements set out in this Manual which are the minimum prescribed. The project
report and other information provided by the Government shall be used by the
Concessionaire only for its own reference and for carrying out further investigations.
The Concessionaire shall be solely responsible for undertaking all the necessary
surveys, investigations and detailed designs in accordance with the good industry
practice and due diligence, and shall have no claim against Government for any loss,
damage, risk, costs, liabilities or obligations arising out of or in relation to the project
report and other information provided by the Government.
1.3 Alternative designs and Specifications for the pavement and structures (bridges,
culverts, underpasses, subways, overpasses, road over/under bridges, retaining walls,
reinforced earth walls etc.) may be adopted by the Concessionaire in accordance with
design requirements set out in this Manual and three copies of each shall be sent
to the Independent Engineer (the "IE") for review and comments, if any. In particular,
such comments shall specify the conformity, or otherwise, of such designs and
Specifications with the requirements specified in this Manual. The conditions specified
in subsequent para 1.13 may also be referred to.
1.4 At least two weeks prior to commencement of the work, the Concessionaire shall draw
up a Quality Assurance Manual (QAM) covering the Quality System (QS), Quality
Assurance Plan (QAP) and documentation for all aspects of the bridge and road works
and send three copies each to the IE for review. The class of quality assurance shall
not be less than Q-3.
1.5 The Codes, Standards and Technical Specifications applicable for the design of project
components are:
(i) Indian Roads Congress (IRC) Codes and Standards, as per Appendix-2.
pc/coi 3
MANUAL OF SPECIFICATIONS AND STANDARDS
(ii) Specifications for Road and Bridge Works, Ministry of Shipping, Road
Transport & Highways hereinafter referred to as MOSRTH Specifications.
(iii) Any other standards referred to in the Manual and any supplement issued with
the bid document.
1.6 Latest version of the Codes, Standards, Specifications, etc. notified/published at least
60 days before the last date of bid submission shall be considered applicable.
1.7 The terms 'Ministry of Surface Transport', 'Ministry of Road Transport and Highways'
and 'Ministry of Shipping, Road Transport & Highways' or any successor or substitute
thereof shall be considered as synonymous.
1.8 The terms 'Inspector' and 'Engineer' used in MOSRTH Specifications shall be deemed
to be substituted by the term "Independent Engineer" to the extent it is consistent with
the provisions of the Concession Agreement and this Manual.
1.9 In case of any conflict or inconsistency with the provisions of the applicable IRC
Codes, Standards or MOSRTH Specifications, the provisions contained in this Manual
and the Specifications and Standards specified in this Manual shall apply.
1.10 In the absence of any specific provision on any particular issue in the aforesaid Codes
or Specifications read in conjunction with the Specifications and Standards contained
in this Manual, the following Standards shall apply in order of priority:
1.11 All items of building works shall conform to State Public Works Department (State
PWD)/Central Public Works Department (CPWD) Specifications for Class 1 building
works and standards given in the National Building Code (NBC). To the extent,
specific provisions for building works are made in IRC/MOSRTH/ State PWD
specifications, the same shall prevail over the CPWD/NBC provisions. For this
4 IRC:SP:73-2007
GENERAL
purpose, building works shall be deemed to include toll plaza complex, road furniture,
roadside facilities, landscape elements and/or any other works incidental to the
building works.
Certain paras (full or part) in Sections 1 to 14 of this Manual refer to the Schedules
of the Concession Agreement. While finalizing the feasibility/project report for the
Project Highway, and the scope of the project, each of these paras should be carefully
examined and addressed by the Government with a view to making appropriate
provisions in the Schedules of the Concession Agreement. (A list of the paras that
refer to such Schedules has been provided at Appendix-1 for ready reference).
The requirements stated in the Manual for the design of the Project Highway are the
minimum. The Concessionaire will, however, be free to adopt international practices,
alternative specifications, materials and standards to bring in innovation in the design
and construction provided they are comparable with the standards prescribed in the
Manual. The Specifications and techniques which are not included in the MOSRTH
Specifications/IRC Specifications/State PWD Specifications shall be supported with
authentic standards and Specifications like AASHTO, Euro Codes, British Standards
and Australian Code etc. Such a proposal shall be submitted by the Concessionaire
to the Independent Engineer for review and comments, if any. In case, the Independent
Engineer is of the opinion that the proposal submitted by the Concessionaire is not
in conformity with any of the international standards or codes, then he will record
his reasons and convey the same to the Concessionaire for compliance. A record shall
be kept by the Independent Engineer, of the non-compliance by the Concessionaire
of the minimum Specifications and Standards specified in the Manual and shall be
dealt with in terms of the provisions of the Concession Agreement. The Concessionaire
shall be responsible for adverse consequences, if any, arising from any such non-
compliance.
pc/coi 5
MANUAL OF SPECIFICATIONS AND STANDARDS
(a) In case, the average daily traffic at the time of bidding is less than 8,000
PCUs in plain terrain or 6,500 PCUs in rolling terrain, initially 2-lane
wide carriageway with granular shoulders may be provided as per Para
2.5.2(ii).
(b) The carriageway may be widened by providing 1.5 m wide paved
shoulders on either side when the average daily traffic exceeds 10,000
PCUs in plain terrain or 8,000 PCUs in rolling terrain on the basis of
the twelve months' average in an accounting year. The paved shoulders
shall be provided within six months from the close of the accounting year
in which average daily traffic exceeds the specified value. The crust
thickness and composition in the widened portions (paved shoulders)
shall be the same as in the main carriageway. (Refer to para 5.9.9).
(ii) In case the average daily traffic at the time of bidding is more than 10,000 PCUs
in plain terrain or 8,000 PCUs in rolling terrain, widening to Two laning Plus
(Two lane carriageway with paved shoulders) may be undertaken straightaway
and specified in Schedule-B of the Concession Agreement.
(iii) In case the average daily traffic at the time of bidding is in the range of 8,000
to 10,000 PCUs in plain terrain or 6,500 to 8,000 PCUs in rolling terrain, the
Government will decide as to whether adopt two-stage capacity augmentation
or prescribe Two-laning Plus straightaway and specify the same accordingly in
Schedule-B of the Concession Agreement.
(iv) The design service volume of a 2-lane highway is given in Table 2.8.
(i) Safety of traffic during the period of construction and the reduction of potential
delays to road users.
(ii) Safety of the workers engaged in construction.
(iii) The arrangement for traffic during construction shall conform to the requirements
of Clause 112 of MOSRTH Specifications. The Concessionaire shall furnish and
6 IRC:SP:73-2007
GENERAL
erect the barricades, traffic signs and markings, arrangements for adequate
lighting, equipment and flagman etc. as required in accordance with IRC:SP:55.
The Concessionaire shall communicate the proposal for safety of traffic and workers
during construction to the Independent Engineer for review and comments, if any.
1.16 The Concessionaire shall set up an adequately equipped field laboratory for testing
of materials and finished products as prescribed in Clause 121 of MOSRTH
Specifications. It shall make necessary arrangements for additional/confirmatory
testing of any materials/products for which facilities at site laboratory are not
available.
1.18.1 All the obligations of the Concessionaire arising out of the provisions of this Manual
shall be subject to, and shall conform to the provisions of the Concession Agreement.
1.18.2 The rules of interpretation as specified in Clause 1.2 of the MCA shall apply mutatis
mutandis to this Manual.
1.18.3 The definitions contained in the Model Concession Agreement for Public Private
Partnership in State Highways ("the MCA"), as published by the Planning Commission,
Government of India shall apply to the provisions of this Manual unless the context
otherwise requires. Terms or words not defined herein shall be governed by the
definitions contained in the IRC Standards, unless the context otherwise requires.
1.19 This Manual is for Two-laning (with or without paved shoulders) of the Project
Highway.
pc/coi 7
Section 2
2.1 General
(i) This Section lays down the standards for geometric design and general features
for upgrading the existing state highways/major district roads to two-lane with
or without paved shoulders.
(ii) (a) Stretches passing through built up areas shall normally be provided with
4-lane divided carriageway (Fig. 2.2). Such stretches shall be indicated
in Schedule-B of the Concession Agreement. Additional land, if any,
required for 4-laning shall be acquired by the Government and where the
land is yet to be acquired, the date of handing over the land to the
Concessionaire shall be indicated.
(b) Where there are constraints of existing ROW width or difficulty in
acquiring land along the existing alignment in built up areas, the Government
may specify construction of a bypass instead of 4-laning. The alignment
of the bypass shall be specified by the Government. The land for the bypass
shall be acquired by the Government and where the land is yet to be
acquired, the date of handing over the land to the Concessionaire shall be
indicated. The bypass shall be access controlled, unless specified otherwise.
In case, the Government decides to provide two-lane carriageway for the
bypass, the same shall be placed eccentrically with respect to the ROW
to facilitate proper widening to four lanes in future.
(iii) The geometric design of the Project Highway shall conform to the standards
set out in this Section as a minimum. The Concessionaire shall ensure that
liberal geometric standards are followed to the extent feasible within the given
Right of Way.
(iv) As far as possible, uniformity of design standards shall be maintained
throughout the length. In case of any change, it shall be effected in a gradual
manner.
(v) Where the existing road geometrics are deficient with respect to minimum
requirements and its improvement to the prescribed standards requires acquisition
of additional land, such stretches shall be specified in Schedule-B of the
Concession Agreement. Additional land as required shall be provided by the
Government.
pc/coi 11
MANUAL OF SPECIFICATIONS AND STANDARDS
(vi) Existing horizontal curves, which are found deficient in radius, layout, transition
lengths or superelevation shall be corrected to the specified standards.
(vii) Any deficiencies in the vertical profile in respect of grades, layout of vertical
curves and sight distance shall be corrected to meet the minimum specified
requirements.
2.2.1 The design speeds given in Table 2.1 shall be adopted for various terrain
classifications (Terrain is classified by the general slope of the ground across the
highway alignment).
2.2.2 Short stretches (say less than 1 km) of varying terrain met with on the road stretch
shall not be taken into consideration while deciding the terrain classification for a
given section of Project Highway.
2.2.3 In general, the ruling design speed shall be adopted for the various geometric design
features of the road. Minimum design speed shall be adopted where site conditions
are restrictive and adequate land width is not available. The Concessionaire shall
improve the alignment as per the requirement for ruling design speed as and when
the Government provides land. Such stretches shall be indicated in Schedule-B of the
Concession Agreement. Land for such stretches shall be provided by the Government
not later than five years from the date of commercial operation (COD). Abrupt changes
in design speed shall be avoided.
The Right of Way (ROW) is the total land width required for the Project Highway, to
accommodate the roadway (carriageway and shoulders), side drains, service roads, tree
plantation, utilities, etc. The ROW available for the Project Highway shall be as given
12 IRC:SP:73-2007
GEOMETRIC DESIGN AND GENERAL FEATURES
2.5 Shoulders
(i) In the built up section, the shoulder shall be fully paved or footpath shall be
provided where specified in Schedule-B of the Concession Agreement.
(ii) In open country with isolated built up area, and where average daily traffic is
less than 8,000 PCUs in plain terrain or 6,500 PCUs in rolling terrain, the
shoulder shall be covered with 150 mm thick layer of granular material
conforming to the requirements given in para 5.9.10.
(iii) In open country with isolated built up area and having plain or rolling terrain
and where average daily traffic is greater than 10,000 PCUs in plain terrain
pc/coi 13
MANUAL OF SPECIFICATIONS AND STANDARDS
or 8,000 PCUs in rolling terrain, 1.5 m width adjacent to the carriageway shall
be paved in accordance with para 5.9.9 of this Manual and balance 1.0 m shall
be covered with 150 mm thick layer of granular material.
2.6.2 On horizontal curves with radius up to 300 m, width of pavement and roadway shall
be increased as per Table 2.3.
Upto 40 m 1.5 m
41-60 m 1.2 m
61-100 m 0.9 m
101-300 m 0.6 m
2.7.1 The camber or crossfall on straight sections of road carriageway and shoulders shall
be as per Table 2.4.
14 IRC:SP:73-2007
GEOMETRIC DESIGN AND GENERAL FEATURES
2.7.2 The two-lane roads shall be provided with a crown in the middle. On horizontal
curves, the carriageway shall be superelevated.
2.7.3 The camber for earthen shoulders on straight portions shall be at least 0.5 per cent
steeper than the slope of the pavement and paved shoulder subject to a minimum of
3.0 per cent. On super elevated sections, the shoulders shall have the same crossfall
as the carriageway.
2.8.1 While designing the horizontal alignment, the following general principles shall be
kept in view:
(i) Alignment should be fluent and it should blend well with the surrounding
topography.
(ii) On new roads, the curves should be designed to have largest practical radius,
but in no case less than ruling value corresponding to ruling design speed.
(iii) As a normal rule, sharp curves should not be introduced at the end of long
tangent since these can be extremely hazardous.
(iv) The curves should be sufficiently long and they should have suitable transitions
to provide pleasing appearance.
(v) Reverse curves shall be avoided as far as possible. Where unavoidable,
sufficient length between two curves shall be provided for introduction of
requisite transition curves.
(vi) Curves in the same direction, separated by short tangents known as broken back
curves, should be avoided as far as possible.
(vii) To avoid distortion in appearance, the horizontal alignment should be
coordinated carefully with the longitudinal profile.
(viii) Hairpin bends on hilly terrain should be avoided as far as possible.
2.8.2 All horizontal curves shall consist of circular portion flanked by spiral transitions at
both ends.
2.8.3 Superelevation
pc/coi 15
MANUAL OF SPECIFICATIONS AND STANDARDS
The desirable minimum and absolute minimum radii of horizontal curves for various
classes of terrain are given in Table 2.5.
The radius of horizontal curves for various terrain conditions shall not be less than
the desirable values given in Table 2.5 except where site conditions are restrictive
and adequate land is not available. Where such restrictions exist, the radius of curve
shall not be less than the specified absolute minimum value.
Minimum length of transition curve shall be determined from the following two
considerations and the larger of the two values adopted for design:
(i) The rate of change of centrifugal acceleration should not cause discomfort to
drivers. From this consideration, the length of transition curve is given by:
Ls = 0.0215 V3/CR,
Where:
Ls = Length of transition curve in metres,
V = Speed in km/hr,
R = Radius of circular curve in metres,
C = 80/(75 + V) (subject to a maximum of 0.8 and minimum of 0.5)
(ii) The rate of change of superelevation should be such as not to cause discomfort
to travelers. Further, rate of change should not be steeper than 1 in 150 for
16 IRC:SP:73-2007
GEOMETRIC DESIGN AND GENERAL FEATURES
2.9.1 Visibility is an important requirement for the safety of travel on roads. For this, it
is necessary that sight distance of adequate length is available in different situations,
to permit drivers enough time and distance to control their vehicles so that chances
of accidents are minimized.
2.9.3 The recommended sight distances for various speeds are given in Table 2.6.
2.9.4 The requisite sight distance shall be available across the inner side of horizontal
curves.
2.9.5 Where horizontal and summit curves overlap, the design shall provide for the required
sight distance, both in the vertical direction, along the pavement and in the horizontal
direction on the inner side of curve.
pc/coi 17
MANUAL OF SPECIFICATIONS AND STANDARDS
2.10.1 The vertical alignment should provide for a smooth longitudinal profile. Grade
changes should not be too frequent as to cause kinks and visual discontinuities in the
profile. The ruling and limiting gradients are given in Table 2.7.
2.10.2 Gradients up to the value corresponding to ruling gradient shall be adopted, as far
as possible. Limiting gradients shall be adopted only in very difficult situations and
for short lengths.
2.10.3 Long sweeping vertical curves shall be provided at all grade changes. These shall be
designed as square parabolas.
2.10.4 For design of vertical curves and its co-ordination with horizontal curves, reference
may be made to IRC:SP:23.
Wherever a cross road is proposed to be taken below the Project Highway, minimum
clearances at underpasses shall be as follows:
(i) Full roadway width at the approaches including service roads, if any, shall be
carried through the underpass. Provision shall also be made for future expansion
of the cross road for at least next 10 years.
(ii) Guardrails shall be provided for protecting vehicles from colliding with the
abutments/piers and the deck of the structures.
Vertical clearance at underpasses shall not be less than the values given below:
(i) Vehicular underpass 5.5 m
(ii) Pedestrian and Cattle underpass 3.0 m
18 IRC:SP:73-2007
GEOMETRIC DESIGN AND GENERAL FEATURES
Wherever any structure crosses over the Project Highway, the minimum clearances
at overpasses shall be as follows:
Full roadway width including service roads, if any, shall be carried through the
overpass structure. Provision shall also be made for future widening of the Project
Highway. The abutments and piers shall be provided with suitable protection against
collision of vehicles. Guardrails shall be provided on abutment side and on sides of
piers for this purpose. The ends of guardrails shall be turned away from the line of
approaching traffic.
2.13.2 Service roads shall be constructed and maintained in accordance with the provisions
of the Concession Agreement. The width of service roads shall be minimum 5.5 m.
2.13.3 The crust composition of service roads shall not be lower than that specified in
IRC:37 for 1 (one) msa design traffic.
2.14.1 The type, location, length, number and the openings required to be provided for
various types of grade separated structures shall be as specified by the Government
in Schedule-B of the Concession Agreement.
pc/coi 19
MANUAL OF SPECIFICATIONS AND STANDARDS
availability of adequate right of way, etc. Type of the structure shall be specified
in Schedule-B of the Concession Agreement.
2.15.1 Typical cross-sections of Project Highway are given in Figs. 2.1 to 2.5. These shall
be adopted for various locations, as applicable.
The design service volume of two-lane highway for different types of terrain shall
be as given in Table 2.8.
Table 2.8 : Design Service Volume of Two-lane Highway in PCUs per day
20 IRC:SP:73-2007
GEOMETRIC DESIGN AND GENERAL FEATURES
Right of way
Roadway 12.0
Note:
All dimensions are in metres.
Fig. 2.1
Right of way
Note:
All dimensions are in metres
except as shown otherwise.
Fig. 2.2
pc/coi 21
MANUAL OF SPECIFICATIONS AND STANDARDS
Right of way
8.5
1.5 min. 5.5 1.5
Shoulder Carriageway Shoulder
8.5
Note:
1. All dimensions are in metres.
2. Dimensions of footpath and service
roads are minimum and higher
may be adopted as per requirement.
Fig. 2.3
Right of way
CL
Roadway 12.0
Note:
All dimensions are in metres.
Fig. 2.4
22 IRC:SP:73-2007
GEOMETRIC DESIGN AND GENERAL FEATURES
Roadway 10.0
Valley Side
Note:
1. All dimensions are in metres.
2. Shoulders covered with locally
available hard material (Paved
shoulders in built up area).
Fig. 2.5
pc/coi 23
Section 3
3.1 Introduction
3.1.1 Subject to the provisions of this Manual, properly designed intersections shall be
provided at all road crossings/junctions. The types and locations of Interchanges and
Grade-separated Intersections without ramps shall be specified in Schedule-B of the
Concession Agreement. The intersections to be provided shall be one of the following
types:
(i) At-grade intersections
(ii) Grade separated intersections without ramps
(iii) Interchanges
3.1.2 The existing intersections, which are deficient with respect to the minimum
requirements shall be improved to the prescribed standards. Additional land, if any,
required for improving the existing intersections shall be provided by the Government.
3.2.1 General
(iv) The design of different elements of intersection shall be done as per IRC:SP:41
including other design criteria given in the subsequent paras. MOSRTH - Type
Designs for Intersection on National Highways, 1992 may also be referred to,
pc/coi 27
MANUAL OF SPECIFICATIONS AND STANDARDS
(v) The design shall aim at simplicity and uniformity in design standards. Complex
designs which may involve complicated decision making by drivers shall be
avoided.
(vi) The intersection control shall be of 'Stop Control' unless specified otherwise.
This will mean that traffic on the minor road must stop prior to entering the
major road. Where roads of equal importance intersect, priority will be given
to the traffic on the right.
(vii) At the intersection, the alignment should be as straight and the gradient as flat
as practicable. Gradients in excess of 2 per cent will normally not be allowed
at intersections.
(viii) Any deficiency in the alignment and grade of intersecting roads shall be
corrected to improve traffic conditions and safety.
(ix) The sight distance to be adopted shall normally be intermediate sight distance
as specified in Section 2. However, in exceptional situations it should not be
less than minimum stopping sight distance specified in Section 2. At such
locations, cautionary speed limit signboards shall be displayed.
(x) At multi leg intersections, the points of conflict should be studied carefully and
possibilities of realigning one or more of the intersecting legs and combining
some movements to reduce the conflicting movements shall be examined. The
objective shall be to simplify the design and appropriate control devices added
to ensure more efficient and safe operation.
Design standards shall be as per IRC:SP:41. Salient features are given below:
(i) Design Speed: The approach speed shall be taken as the design speed adopted
for the section of Project Highway on which the intersection is located. The
design speed for various elements of the intersection shall be taken as 60% of
the approach speed.
(ii) Design Traffic Volume: The traffic volume for the design of intersection and
its distribution at peak hours shall be assessed, up to the operation period, taking
into consideration the past trend, likely new development of land, socio-
economic changes, etc.
28 IRC:SP:73-2007
INTERSECTIONS AND GRADE SEPARATORS
(iii) Design Vehicle: Semi-trailer combination (refer IRC: 3) shall be used in the
design of intersections.
(iv) The number of lanes to be provided at the intersection shall be governed by
peak hour traffic volume in each direction of travel. For single lane movements,
a minimum width of 5.5 m is to be adopted. For two-lane roads between kerbs,
a minimum 7.5 m width shall be provided. Widening of carriageway shall be
achieved by a taper of not less than 1 in 15.
(v) Type and radius of curve of intersection: The type and radii of curves would
depend upon the types of vehicles turning at the intersection and shall be
decided based on the traffic data.
(vi) Visibility at intersection: A minimum safe stopping sight distance, appropriate
for the approach speeds, shall be available for the traffic on the Project
Highway.
(i) Road markings: Typical road markings for road intersection as given in
IRC:SP:41 and IRC:35 shall be followed. The specifications of road markings
shall be as given in Section 9 of this Manual.
(ii) Signs: Traffic signs at the junctions shall be provided as per IRC: 67 and Section
9 of this Manual.
(iii) Reflectors: To guide the traffic, reflectors in the form of cat's eyes, delineators,
etc shall be provided, in addition to the road markings, especially at the
channelising islands.
The Concessionaire shall submit the details of the ground surveys, traffic data, traffic
forecast, design and drawings of the intersections showing all safety features to the
Independent Engineer for review and comments, if any.
3.3.1 General
pc/coi 29
MANUAL OF SPECIFICATIONS AND STANDARDS
The geometric design standards for various elements of this type of grade separators
shall be as given in paras 3.2.1 and 3.2.2.
The Concessionaire shall submit the details of the ground surveys, traffic data, traffic
forecast, design and drawings of the grade separated intersections and the structures,
showing all safety features, to the Independent Engineer for review and comments,
if any.
3.4 Interchanges
3.4.1 General
30 IRC:SP:73-2007
INTERSECTIONS AND GRADE SEPARATORS
(i) Interchanges are generally described by the pattern of the various turning
roadways or ramps, which determine their geometric configuration. The
common geometric configurations of Interchanges are the trumpet, diamond,
cloverleaf, rotary and directional. Within each type of Interchange, there can
be several variations such as split diamond, partial cloverleaf, etc. depending
on the ramp arrangements.
(ii) The type of Interchange, the shape and pattern of the Interchange ramps and
loops and their designs shall be governed by factors such as the importance
of the intersecting highway, the number of intersecting legs, the design volumes
of through and turning traffic movements including their composition, the
design speeds, available right of way and topography. The Interchange site shall
be studied in detail and alternative designs made, to determine the most suitable
arrangement of structures and ramps satisfying the specified requirements.
pc/coi 31
MANUAL OF SPECIFICATIONS AND STANDARDS
The geometric design standards shall be as per IRC: 92 appropriate for the design
speed adopted for the Project Highway. The design speed for ramps shall not be less
than 40 km per hour. The desirable values of various parameters given in IRC: 92
shall be adopted, unless there are severe site constraints.
The traffic volume for the design of various elements of Interchange including ramps
shall be assessed up to the end of the Concession Period or twenty years, whichever
is more, taking into consideration the past trends, likely new development of land,
socio-economic changes, etc.
Traffic signs (refer IRC: 67) shall be provided at suitable locations to:
(i) Serve as advance notice of the approaches to the Interchange;
(ii) Direct drivers into appropriate lanes for diverging/merging movements;
(iii) Identify routes and directions;
(iv) Provide other information of importance to the drivers; and
(v) Show distances to destinations.
The Concessionaire shall submit details of the ground surveys, traffic data, traffic
forecast, design and drawings of the Interchange, showing all safety features, to the
Independent Engineer for review and comments, if any.
32 IRC:SP:73-2007
Section 4
Road Embankment
SECTION 4
ROAD EMBANKMENT
4.1 General
4.1.1 The design and construction of road embankment and cuttings shall meet the
requirements, standards and specifications given in this Section. This Section also
covers specifications for subgrade and earthen shoulders.
4.1.2 Where the Project Highway involves improvement to an existing road, efforts should
be made to remove the inherent deficiencies in plan, profile and the roadway width.
It shall be ensured that the final centre line of the road and the road levels are fixed
with great care, duly considering all the relevant factors covering structural soundness,
safety and functional requirements.
4.1.3 The existing roadway, where deficient, shall be widened to the roadway width in
accordance with para 2.6.
4.2.1 The width of the embankment shall be in accordance with the cross-sectional details
specified in Section 2 of this Manual.
4.2.2 The height of the embankment shall be based on the final road levels. The following
principles shall be kept in view while fixing the road level:
pc/coi 35
MANUAL OF SPECIFICATIONS AND STANDARDS
(a) Bottom of subgrade is 1.0 m above the high flood level/highest water
table/ponded water level. The HFL should be decided by intelligent
inspections, local observations, enquiries and studying the past records.
4.2.4 Deficiencies in the existing vertical profile of the road shall be corrected.
4.2.5 Construction of embankment, subgrade and earthen shoulders shall conform to the
requirements of Clause 305 of MOSRTH Specifications as a minimum requirement.
4.2.6.2 Borrow pits shall not be located within the right of way or along the road. Clause
305.2.2 of MOSRTH Specifications shall apply.
4.2.6.3 The materials used in embankment, subgrade and earthen shoulders shall be soil,
moorum, gravel, a mixture of these or any other material conforming to the
requirements of Clause 305.2 of MOSRTH Specifications. Pond ash can also be used
subject to requirement indicated in para 4.2.16 of this Section.
4.2.6.4 The following types of materials shall be considered unsuitable for embankment
construction and shall not be used:
(ii) Peat, log, stump and perishable material, any soil that is classified as OL, OI,
OH in accordance with IS: 1498;
(v) Clay having Liquid Limit (LL) exceeding 70 and Plasticity Index (PI)
exceeding 45;
36 IRC:SP:73-2007
ROAD EMBANKMENT
(vii) Expansive clays, 'Free Swelling Index' (FSI) exceeding 50% when tested as
per IS: 2720 (Part 40).
4.2.6.5 Expansive clays/black cotton soil shall not be used for subgrade construction.
4.2.6.6 Where expansive clay with acceptable Free Swelling Index value is used as a fill
material, subgrade and top 500 mm portion of the embankment just below subgrade
shall be non-expansive in nature.
4.2.6.7 The size of the coarse material in the mixture of earth shall not exceed 75 mm when
placed in the embankment and 50 mm when placed in the subgrade.
4.2.6.8 Only the materials satisfying the density requirements given in Table 4.1 shall be
employed for the construction of the embankment and the subgrade.
4.2.6.9 The density requirements specified in Table 4.1 shall not be applicable to light weight
material e.g. pond ash.
4.2.6.10 The material to be used, in subgrade shall satisfy the design CBR at the specified
density and moisture content.
4.2.6.11 The embankment and subgrade shall be compacted to satisfy the minimum
compaction requirements given in Table 4.2.
pc/coi 37
MANUAL OF SPECIFICATIONS AND STANDARDS
Relative Compaction as
Type of Work/Material percentage of max. laboratory
dry density - IS:2720 (Part 8)
4.2.7.1 Embankment shall be designed to ensure the stability of the roadway and shall
incorporate only those materials, which are suitable for embankment construction as
per para 4.2.6 of this Section.
4.2.7.2 The design of side slopes shall be governed by slope stability and traffic safety
considerations.
4.2.7.3 Side slopes shall not be steeper than 2H: 1V unless soil is retained by suitable soil
retaining structures. The reinforced earth where provided, shall conform to the
requirements of Section 7 of this Manual.
4.2.7.4 The type of retaining structure shall be aesthetically pleasing and compatible with
the adjoining structures.
4.2.7.6 Where the embankment is more than 3 m high and fill material consists of heavy
clay or any problematic soil, the embankment stability shall be analysed and
ascertained for safe design.
4.2.7.7 High embankments (height 6 m or above) in all soils shall be designed from stability
considerations.
38 IRC:SP:73-2007
ROAD EMBANKMENT
4.2.7.9 The side slopes shall be protected against erosion by providing a suitable vegetative
cover, kerbs channel, chute, stone pitching/cement concrete block pitching or any
other suitable protection measures, depending on the height of the embankment and
susceptibility of soil to erosion. Drainage arrangement shall be provided as per
Section 6 of this Manual.
4.2.7.10 Stone pitching/cement concrete block pitching shall conform to Clause 2504 of
MOSRTH Specifications.
4.2.8.2 Any unsuitable material occurring in the embankment foundation shall be removed
and replaced by acceptable fill material in accordance with Clause 305.3.4 of
MOSRTH Specifications.
4.2.8.3 Where construction of embankment and subgrade is required to be carried out under
the special conditions such as given in paras 4.2.7 to 4.2.13, the earthwork shall be
done in accordance with the procedure and requirements described in Clause 305.4
of MOSRTH Specifications.
4.2.10 Earthwork for Embankment and Subgrade to be Placed Against Sloping Ground
(i) The work shall be carried out in accordance with the requirements of Clause
305.4.4 of MOSRTH Specifications.
pc/coi 39
MANUAL OF SPECIFICATIONS AND STANDARDS
(ii) Filling behind abutments, retaining walls, head walls and wing walls for
structures shall conform to the general guidelines given in Appendix 6 of
IRC:78.
(iii) The filter medium shall conform to the requirements of Clause 2504 of
MOSRTH Specifications.
4.2.16.1 Where Pond ash is used for embankment construction in pursuance of the instructions
of the Ministry of Environment and Forests or otherwise, the embankment shall be
designed and constructed in accordance with IRC:SP:58.
4.2.16.2 The thickness of soil cover shall not be less than 1 m for embankments up to 3m
high. For high embankments, the thickness of soil cover shall be increased as per
design.
4.2.16.3 The side slopes of the embankment shall be protected against erosion by providing
turfing or stone/cc block pitching.
40 IRC:SP:73-2007
ROAD EMBANKMENT
The surface finish and quality control of materials and works shall conform to the
requirements of Clauses 902 and 903 of MOSRTH Specifications and Para 5 of
IRC:SP:58 (relevant to Pond ash).
4.3.1 The width of the roadway in cutting shall be in accordance with the cross section
details specified in Section 2 of this Manual.
4.3.2 The road level shall be fixed, keeping in view the following requirement:-
The difference between the bottom of subgrade and the highest water table is not less
than 1.0 m. Exceptionally, where this requirement is not satisfied, drain shall be
provided to lower down the water table.
(i) Soil investigations shall be carried out to ascertain the type of cutting involved
and in-situ soil conditions at the subgrade level. Reference may be made to
IRC:SP:19.
(ii) The side slopes of cuttings shall be provided in accordance with the nature of
the soil encountered. The slope shall be stable for the type of strata. Where
required, benching including use of slope stability measures like pitching, breast
walls, etc. shall be adopted to make the slopes stable and safe.
(iii) In the case of rock cutting, trial pits or boreholes shall be carried out at
30-50 m intervals to assess the type of rock.
4.3.4 Excavation for roadway in soil/rock shall be carried out in accordance with Clauses
301, 302 and 303 of MOSRTH Specifications, as relevant.
While executing excavation, adequate precautions against soil erosion, water pollution
shall be taken as per Clause 306 of MOSRTH Specifications.
Appropriate drainage measures shall be taken to keep the site free of water in
accordance with Clause 311 of MOSRTH Specifications.
Adequate precautions shall be taken to ensure that during construction, the slopes are
not rendered unstable or give rise to recurrent slides after construction.
pc/coi 41
MANUAL OF SPECIFICATIONS AND STANDARDS
In cut sections in hilly terrain, the problem of seepage flow is common. Where such
conditions exist, necessary measures including provision of deep side drains to
intercept the seepage flow and to avoid any damage to road and cut slopes shall be
provided.
(i) The cut formation, which serves as a subgrade, shall be prepared as per Clause
301.6 of MOSRTH Specifications.
(ii) Where the material in the subgrade has a density less than that specified in
Table 4.1, the same shall be loosened to a depth of 500 mm and compacted in layers
in accordance with the requirements of Clause 305 of MOSRTH Specifications.
(iii) Any unsuitable material encountered in the subgrade shall be removed and
replaced with suitable material and compacted in accordance with Clause 305
of MOSRTH Specifications.
The Concessionaire shall carry out necessary soil surveys and field and laboratory
investigations for selecting appropriate borrow pits, identifying problematic ground
locations if any, requiring treatment and for finalizing structural features and design
of the embankment and cut sections. The soil survey and investigations report and
design report shall be submitted to the Independent Engineer for review, if any.
42 IRC:SP:73-2007
ROAD EMBANKMENT
(a) The report shall include soil investigations and tests in accordance with
the requirements specified in IRC:SP:19 and shall be reported in the
Proforma given in Table 1 of IRC:SP:19. In addition to this, all tests as
per the requirements of MOSRTH Specifications shall be reported.
(c) Information regarding the topography, high flood level, natural drainage
conditions, highest sub-soil water level, and the nature and extent of
inundation, if any.
(e) Along the alignment of the road, where unstable strata, soft material or
poor subsoil conditions have been met with at the foundation level, the
soil profile shall be drawn after determining through borings, the type
of soil at different levels. The boring shall be at intervals of 100 to
200 m to a depth of 2 m below the existing ground. In the case of high
embankments, the borings shall be taken down to a depth equal to twice
the height of the embankment.
The report shall include soil investigations and tests in accordance with
the requirements specified in IRC:SP:19 and information regarding depth of water
table, seepage flow, presence of any weak, unstable or problematic strata.
pc/coi 43
MANUAL OF SPECIFICATIONS AND STANDARDS
The Concessionaire shall furnish the design report including the following to the
Independent Engineer for review and comments, if any.
(d) Design of Pond ash embankment in case use of Pond ash is proposed.
(b) Design and details of erosion control, slope protection measures, etc.
(c) Design and details of drainage arrangement for sub-soil and surface
water.
(d) Any other additional information relevant to the design of cut slopes.
44 IRC:SP:73-2007
Section 5
Pavement Design
SECTION 5
PAVEMENT DESIGN
5.1 General
5.1.1 The existing roads in the States are generally flexible pavements and their capacity
augmentation by way of widening and strengthening would therefore generally be by
provision of flexible pavements only.
5.1.2 Situations may, however, also arise where the Government may require provision of
cement concrete pavement depending upon specific site conditions. Such a requirement
shall be specified in Schedule-B of the Concession Agreement and indicated as a
deviation in Schedule-D of the Concession Agreement. The minimum design and
maintenance requirements for cement concrete pavement shall be specified by the
Government and Schedule-K of the Concession Agreement shall be modified
accordingly.
5.1.3 Design of new pavement sections or widening and strengthening of existing pavements
shall take into account all relevant factors for assuring reliable performance that
satisfies the specified minimum performance requirements.
5.1.4 The pavement condition and other data furnished by the Government are based on
preliminary investigations. The Concessionaire shall undertake the necessary soil,
material and pavement investigations and traffic volume and axle load studies in
accordance with the good industry practice for preparing detailed designs.
5.1.5 The materials, mixes and construction practice shall meet the requirements prescribed
herein and MOSRTH Specifications / IRC Specifications, unless specified otherwise.
5.1.6 Where problematic conditions such as expansive soils, swamps or marshes, flooding,
poor drainage, etc. are found to exist, adequate measures shall be adopted to deal with
such site conditions.
The design of flexible pavement is covered in two parts namely, new pavements, and
widening and strengthening of existing pavements. New pavements shall be designed
in accordance with the method prescribed in IRC:37 or any other international standard
method/guideline for pavement design, subject to the condition that the
overall pavement composition shall not be less than the minimum requirement
pc/coi 47
MANUAL OF SPECIFICATIONS AND STANDARDS
Rigid pavement shall be designed for a period of not less than 30 years, in accordance
with the method prescribed in IRC:58.
(i) Pavement shall be designed for a minimum design period of 15 years. Stage
construction shall be permissible subject to the requirement specified in para
(ii) below.
(ii) Alternative strategies or combination of initial design, strengthening and
maintenance can be developed by the Concessionaire to provide the specified
level of pavement performance over the operation period, subject to satisfying
the following minimum design requirements;
(a) The thickness of sub-base and base of pavement section is designed for
a minimum design period of 15 years and the initial bituminous surfacing
for a minimum design period of 8 years.
(b) The pavement shall be strengthened by bituminous overlay, as and when
required, to extend the pavement life to full operation period. Strengthening
in stages for not less than five years at a time can be done. The thickness
of bituminous overlay shall be determined on the basis of IRC:81.
(i) The stage construction shall not be permitted in case of rigid pavement. The
pavement shall be constructed in 10 m width (7 m carriageway plus 2X1.5 m
rigid shoulders).
(ii) The Pavement Quality Concrete (PQC) shall be designed as per para 5.3.1,
based on a flexural strength of 4.5 MPa. The PQC shall rest over Dry Lean
Concrete (DLC) sub-base of 150 mm thickness.
(iii) The DLC will be of M10 concrete (7 days' strength) as prescribed in
IRC:SP:49. DLC will be extending beyond the PQC (including that in shoulder,
if any) by 1m on either side.
48 IRC:SP:73-2007
PAVEMENT DESIGN
(iii) During the operation period, the pavement surface roughness or any structural/
functional distress shall not exceed the values specified in Schedule-K of the
Concession Agreement. Any treatment in the form of renewal/overlay carried
out or required to restore/correct/improve the riding quality or any distress shall
be of such thickness and specification that will restore the riding quality to
2000 mm/km.
5.5.1 The design traffic shall be estimated in terms of cumulative number of standard axles
(8160 kg) to be carried by the pavement during the design period.
5.5.2 Estimate of the initial daily average traffic flow shall be based on atleast 7 days',
24 hour classified traffic counts. IRC:9 may be used as guidance for carrying out the
traffic census.
5.5.3 Any likely change in traffic due to proposed improvement of the facility and/or future
development plans, land use, shall be duly considered in estimating the design traffic.
pc/coi 49
MANUAL OF SPECIFICATIONS AND STANDARDS
5.5.4 Traffic growth rate shall be established for each category of commercial vehicles to
be considered for design of pavement. For traffic projections, the procedure outlined
in IRC:108 may be followed. The Concessionaire shall adopt a realistic value of the
rate of traffic growth, provided that annual rate of growth of commercial vehicles shall
not be assumed as less than 5 per cent.
5.5.5 Axle load surveys shall be carried out to estimate the vehicle damage factor (VDF)
for each category of commercial vehicles. The axle load equivalency factors
recommended in Annexure-2 of IRC:37 shall be used for converting different axle
road repetitions into equivalent standard axle load repetitions. VDF values so
determined shall be used for estimating design traffic in standard axles. Provided that
if the Concessionaire envisages the possibility of controlling the severity and incidence
of overloading with better enforcement of legal load limits as also of increase in the
proportion of Multi Axle Vehicles over the years, it may, at it own risk and cost adopt
a lower VDF value than that determined on the basis of the Axle load spectrum survey.
5.5.7 For rigid pavements Equivalent Damage Ratio (EDR) shall be adopted as given in
IRC:58.
5.6 Subgrade
The subgrade, whether in cut or fill, shall meet the following requirements:
(i) Subgrade material shall conform to the requirements laid down in Section 4.
Expansive clays and other unsuitable soils shall not be used for subgrade
construction. The material used in subgrade shall have dry density of not less
than 17.5 kN/cu.m.
(ii) The thickness of subgrade shall not be less than 500 mm.
(iii) The subgrade shall be compacted to atleast 97% of the maximum dry density
achieved with heavy compaction in accordance with IS: 2720 (Part 8).
(iv) The soaked CBR value of remoulded subgrade soil samples at the specified dry
density and moisture content shall not be less than 7% (average of atleast 3
specimens), unless specified otherwise.
(i) The pavement construction materials for sub-base, base and bituminous
50 IRC:SP:73-2007
PAVEMENT DESIGN
If any material which is not specified here or included in MOSRTH / IRC / PWD
Specifications is proposed to be used, the proposal supported with authentic standards
and practice shall be communicated to the Independent Engineer for review and
comments, if any.
5.7.1 Sub-base
pc/coi 51
MANUAL OF SPECIFICATIONS AND STANDARDS
(i) Base course material and construction shall conform to any of the following
types:
(a) Water Bound Macadam for base course conforming to IRC:19.
(b) Wet Mix Macadam for base course conforming to IRC:109.
(c) Crusher Run Macadam Base conforming to the requirements of Clause
410 of MOSRTH Specifications.
(d) Any other superior base material like Bituminous Macadam conforming
to Clause 504 of MOSRTH Specifications can be used in combination
with the granular base.
(ii) The granular base shall be primed with a prime coat of low viscosity liquid
bituminous material of appropriate type conforming to MOSRTH Specifications/
BIS specifications, preparatory to the superimposition of bituminous treatment
or mix.
(i) The bituminous surfacing shall be either a wearing course or a binder course
with a wearing course depending upon the design traffic.
(ii) Bituminous surfacing materials and thicknesses shall satisfy the requirements
of the IRC:37. The suggested surfacing materials and thickness are desirable
minimum from functional and structural requirements.
(iii) The specifications for the bituminous materials and mixes shall satisfy the
specified minimum requirements, as per the relevant MOSRTH Specifications.
The design of mixes shall be done by Marshall method.
(iv) For the design of mixes, use of refusal density criterion can be adopted.
(v) The grade of bitumen/modified bitumen shall be selected by the Concessionaire
keeping in view the traffic, rainfall and other environmental conditions.
52 IRC:SP:73-2007
PAVEMENT DESIGN
(iii) The structural evaluation of the pavement shall be made by taking deflection
measurements every 5 years, in accordance with the procedure given in
IRC: 81, unless needed earlier for stretches exhibiting severe distress during
the operation and maintenance period.
5.9 Widening and Strengthening of Existing Pavement to Two Lane / Two Lane Plus
(with Paved Shoulders)
5.9.1 The requirement of strengthening (overlay thickness) for the existing pavement shall
be assessed as per the procedure laid down in IRC: 81. The pavement thickness in
the widened portion shall be kept equal to the thickness of the existing pavement plus
the thickness of the overlay as assessed above, unless specified otherwise. The overlay
on the existing pavement and widened portion shall be uniform in thickness and
composition. It shall be ensured that the thickness of the bituminous surfacing in the
widened portion shall not be less than the equivalent thickness of bituminous surfacing
over the existing pavement.
5.9.2 The pavement shall be widened symmetrical to the existing centerline or on one side
only depending on the placement of the existing road within the right of way. This
aspect may be decided in consultation with the Independent Engineer, in case not
specified in the relevant schedule of the Concession Agreement.
(i) The extent of distress and nature of deficiency in the existing pavement
structure, and
(ii) Whether any special treatments e.g. provision for remedying reflection cracking,
pavement internal drainage, subgrade improvement/ reconstruction, or rectification
of any other deficiencies are warranted.
5.9.4 Before implementing the strengthening treatment, the existing pavement surface
profile shall be checked and if found deficient, shall be corrected by providing a
suitable profile corrective course or by milling and recycling. The profile corrective
course shall meet the following requirements:
(i) The profile corrective course shall not form part of the overlay thickness.
pc/coi 53
MANUAL OF SPECIFICATIONS AND STANDARDS
(ii) Where the maximum thickness of profile corrective course is not more than
40 mm, it shall be constructed as an integral part of the overlay course. In
other cases, the profile corrective course shall be constructed as a separate layer.
5.9.5 Necessary corrective measures to treat the identified deficiency vide paras 5.9.3 and
5.9.4 above, shall be taken along with strengthening of the pavement.
5.9.6 Any stretches in which the pavement is damaged/deteriorated to such an extent that
the use of Benkelman Beam method may not result in a realistic assessment of the
strengthening treatment, pavement in such stretches shall be designed using the design
procedure for new pavements.
5.9.7 Where an existing pavement is built over an untreated expansive/black cotton soil
subgrade, its improvement/strengthening/widening shall be treated separately. Such
stretches shall require reconstruction with provision of adequate measures such as
replacement or treatment of expansive subgrade and shall be designed as new
pavement in accordance with the procedure specified in para 5.4 and IRC:37. Such
stretches shall be specified in Schedule-B of the Concession Agreement.
5.9.8 No granular layer shall be provided over an existing bituminous surfacing. Where it
is envisaged to strengthen grossly deficient existing road with a granular base layer in
addition to the bituminous overlay, the requirements specified in paras 5.10.6 and 5.10.7
shall apply.
(v) If the thickness of the existing paved shoulders, if any, is less than the thickness
54 IRC:SP:73-2007
PAVEMENT DESIGN
Material for granular layer on shoulders shall be well graded natural sand, moorum,
gravel, crushed stone or combination thereof, conforming to Clause 401 of MOSRTH
Specifications and having soaked CBR value of not less than 30%. The granular layer
shall be compacted to at least 98% of the maximum dry density for the material
determined as per IS: 2720 (Part 8).
5.10.1 IRC:81 shall be followed for design of strengthening treatment. The guidelines provide
the method for determining the characteristic deflection using Benkelman Beam and
then working out the overlay thickness for the design traffic.
5.10.2 The characteristic deflection for design purpose shall be determined by the following
formula:
–
DC = X + 2 σ
Where, DC = Characteristic Deflection (mm)
–
X = Mean Deflection (mm)
(determined on the basis of individual deflection corrected for
temperature and seasonal variation)
σ = Standard Deviation
(i) Pavement strengthening shall be done for a design period of 10 years or equal
to the operation period, whichever is more. Strengthening in stages shall be
permissible subject to the requirements given in para (ii) below.
(ii) The Concessionaire shall ensure the following requirements as a minimum for
design of strengthening measures:
(a) Initial strengthening for a design period of not less than eight years.
(b) Subsequent overlay at the end of the initial design period, or earlier, if
the surface roughness exceeds the value specified in Schedule-K of the
pc/coi 55
MANUAL OF SPECIFICATIONS AND STANDARDS
The design traffic shall be estimated in terms of the cumulative number of standard
axles (8160 kg) to be carried by the pavement during the design period as per the
procedure described in para 5.5 of this Section.
5.10.5 The thickness of bituminous overlay shall be determined on the basis of the
characteristic deflection and the design traffic as per the procedure outlined in
IRC:81. The guidelines give the thickness of overlay required in terms of bituminous
macadam. The thickness of bituminous overlay for pavement strengthening shall not
be less than 50 mm.
5.10.6 The overlay, so determined for the existing pavements in terms of Bituminous
Macadam can be modified to provide for other compositions, including the
combination of granular layers of WBM/WMM and bituminous treatment. The
equivalent overlay thickness can be determined using the following equivalency
factors as per Clause 7.4 of IRC: 81;
100 mm of BM = 150 mm of WBM/WMM
100 mm of BM = 70 mm of DBM/SDBC/BC
5.10.7 The type of material to be used in overlay construction will depend upon several
factors such as design traffic, thickness, condition and type of existing bituminous
surfacing and convenience of construction. If it is proposed to strengthen an existing
weak pavement structure with granular construction followed by bituminous surfacing,
the following requirements shall be satisfied:
56 IRC:SP:73-2007
PAVEMENT DESIGN
The specifications for the bituminous mixes for the overlay shall be as specified for
bituminous surfacing for new pavement sections vide para 5.7.3 of this Section.
The strengthened pavement shall satisfy the minimum standard and maintenance
requirements specified for new pavement sections in para 5.4.3 of this Section and
Schedule-K of the Concession Agreement.
The performance measurement and evaluation will be done as per the procedure
described in para 5.8 of this Section.
All materials, construction operations, workmanship, and the surface finish of the
quality of completed construction for all pavement works including subgrade, sub-
base, base course, bituminous surface courses for new pavements and for widening
and strengthening works shall conform to the specified requirements and specifications
and comply with the relevant provisions of Section 900 of the MOSRTH Specifications.
pc/coi 57
MANUAL OF SPECIFICATIONS AND STANDARDS
The new pavement design and strengthening proposals formulated on the basis of the
detailed investigations and studies shall be communicated to the Independent Engineer
for review and comments, if any. The proposal shall be accompanied by Data
Collection, Data Evaluation and Design Reports.
(i) Soil investigation data for new pavements as per Table 13.2 of IRC: SP:19.
Report shall include OMC-Dry density relationship with heavy compaction and
soaked CBR values, in addition to other data and information as per the
prescribed proforma.
(ii) Test values of aggregate for pavement courses as per Tables 13.3 and 13.4 of
IRC:SP:19. All tests as per requirements of MOSRTH Specifications shall be
reported in addition to the tests and information included in the above
mentioned Tables.
(iv) Axle load surveys and VDF values for each category of commercial vehicles
as per Proforma 4 of IRC:SP:19.
(v) Estimation of traffic growth and traffic projections for pavement design.
(viii) Pavement Deflection Data measured by Benkelman Beam as per the procedure
detailed in IRC:81. Pavement deflection data shall be recorded in the prescribed
Proforma vide Table 3 of IRC:81.
(ix) Any other relevant information required by the Independent Engineer for review
and comments, if any.
58 IRC:SP:73-2007
PAVEMENT DESIGN
(i) Data evaluated - soil characteristics and subgrade strength, pavement distress,
pavement deflection, riding quality, skid resistance, drainage aspects, etc.
The Concessionaire shall furnish the detailed design of the preferred solution along
with any special treatment proposed for adoption. Any departures from the
specifications, stated herein, shall be supported with authentic standards and
specifications and accepted practice.
pc/coi 59
Section 6
Roadside Drainage
SECTION 6
ROADSIDE DRAINAGE
6.1 General
6.1.1 The design and construction of surface and sub-surface drains for highway drainage
shall be carried out in accordance with the requirements of this Section.
6.1.2 Efficient drainage system shall be provided for the entire Project Highway including
structures and facilities.
6.1.3 For quick disposal of precipitation on the road surface, the carriageway, shoulders and
median shall have the requisite camber/crossfall and longitudinal gradient as per the
values specified in Section 2 of this Manual.
6.1.5 The design of drains shall be carried out in accordance with IRC:SP:42 and
IRC:SP:50.
6.1.6 Construction of surface and sub-surface drains shall be carried out in accordance with
the requirements of Clause 309 of the MOSRTH Specifications.
6.1.7 Efficient drainage arrangements for road sections in cuttings and at underpasses shall
be made. Where it is not possible to drain out water using gravity flow, necessary
arrangements for pumping shall be made.
6.2.1 The water from road and adjacent areas shall be intercepted and carried through road
side drains to natural outfalls.
6.2.2 The drains shall have sufficient capacity to carry normal peak run-off without
overflowing.
6.2.3 The selection of type of roadside drains shall be based on the magnitude and duration
of flow. The roadside drains shall be designed on the principles of flow in open
channel.
6.2.4 The estimation of design discharge (peak run off) and design of drain sections shall
be made in accordance with the procedure given in IRC:SP:42.
pc/coi 63
MANUAL OF SPECIFICATIONS AND STANDARDS
6.2.5 The open drains shall be located sufficiently away from the toe of embankment. When
the drain is unlined it shall be beyond 4H:1V imaginary line drawn from the edge
of the roadway.
6.2.6 The road side drains shall not pose any danger to traffic, slopes of cuttings,
embankment, pavement or structures.
6.2.7 As far as possible, longitudinal slope shall not be less than 0.5 percent for lined drains
and 1.0 percent for unlined drains.
6.2.8 The side slopes of the unlined drains shall be as flat as possible and shall not be
steeper than 2H:1V.
6.2.9 The drains shall be provided with CC lining in the following situations:
(a) When due to space constraint, the drains are located near the toe of the
embankment or near structures.
(c) Flow velocity is more than 0.3 m/s to 1 m/s in silt and sand and more than
1.5 m/s in stiff clay.
6.3.1 Proper arrangement for drainage of median shall be provided. The median drain should
have adequate longitudinal slope to the nearest culvert to drain off transversely.
6.3.2 Earthen surface in the median shall not be sloped towards carriageway to drain on
the pavement, to avoid washed away soil getting deposited on the pavement making
it slippery and accident prone.
6.3.3 Turfed/paved median of up to 5 m width with kerbs could be crowned for drainage
across the pavement.
6.3.4 In superelevated sections, proper arrangement for drainage of raised carriageway and
median shall be made without allowing water to drain on the other carriageway.
6.4.1 In high embankment and approaches to bridges, proper arrangement for drainage of
carriageway shall be made in order to ensure that no damage is caused to pavement,
shoulders and embankment slopes.
64 IRC:SP:73-2007
ROADSIDE DRAINAGE
6.4.2 Drainage arrangement may include provision of kerb channel at the edges of the
roadway to channelize the water and CC lined chutes along the slopes at about
10 m intervals or at designed spacing to discharge the water into side channels at
the bottom.
6.4.3 The chute drains and drains at toe of the embankment shall be of Plain Cement
Concrete (M15 grade) over proper bedding.
6.5.1 Suitable catch water drains shall be provided on the hill slopes above a cutting to
collect and remove surface water run-off from upper reaches. These drains should be
of trapezoidal shape and stone lined and cement pointed.
6.5.2 The catch water drains shall be designed to carry the intercepted water to the nearest
culvert or natural drainage channel.
6.5.3 It shall be ensured that the catch water drains are provided in stable hill slopes outside
the periphery of slide/unstable areas.
6.5.4 Where required, lined chutes shall be provided to lead the discharge to the catch pit
of culvert or to a natural drainage channel.
6.6.4 Perforated pipes and unperforated pipes shall meet the requirements of Clause 309.2
of MOSRTH Specifications.
pc/coi 65
MANUAL OF SPECIFICATIONS AND STANDARDS
6.6.5 The internal diameter of the pipe shall not be less than 150 mm.
6.6.6 The sub-surface drains shall be located not less than 0.5 m below the subgrade.
(i) Backfill material shall be free draining sand, gravel or crushed stone designed
on inverted filter criteria for filtration and permeability or of an appropriate
grading conforming to the requirements of Table 300.3 of MOSRTH
Specifications.
(ii) Thickness of backfill material around the pipe shall not be less than 150 mm.
The minimum thickness of material above the top of the pipe shall be 300 mm.
6.6.8 Sub-surface drains not located below the road pavement shall be sealed at the top.
(i) The sub-surface drains may be designed using appropriate geo-textile to serve
the functions of filtrations and separation.
(ii) The sub-surface drains can be provided with geo-textile either along the trench
or around the pipe or both.
(iii) The geo-textile shall satisfy the requirements of Clause 702 of MOSRTH
Specifications.
6.6.10 Trench excavation, laying of pipe, backfilling, and use of geo-synthetics shall conform
to the requirements of Clauses 309.3.3, 309.3.4 and 309.3.5 of MOSRTH Specifications
6.6.11 The drain outlet shall be a free outlet and shall be prepared as per Clause 309.3.6
of MOSRTH Specifications.
(i) The trench for aggregate drain shall be of minimum 300 mm width and cut
to a depth to expose the granular pavement courses to be drained.
(ii) Aggregate for the drain shall be gravel, stone aggregate or slag of grading as
per Table 8 of IRC:SP:42.
(iii) The aggregate drain shall be provided with a geo-textile wrap to act as filtration
and separation layer.
6.6.13 Design of subsoil drainage shall be based on a rational basis. Reference may be made
to IRC:SP:42
66 IRC:SP:73-2007
ROADSIDE DRAINAGE
(i) Boxed type construction in which pavement is housed in earthen shoulders shall
not be provided.
(ii) The sub-base shall be extended across the shoulders for efficient drainage of
pavement.
(iii) The granular sub-base shall be of proper design and grading to perform
satisfactorily as a drainage layer. The drainage layer shall not have material finer
than 75 micron size.
The Concessionaire shall carry out proper surveys and investigations for detailed design
of the drainage system. The proposal for drainage system supported with survey
investigation report and detailed design report shall be submitted to the Independent
Engineer for review and comments, if any.
(iv) Geo-technical investigations for sub-surface strata, level of water table, seepage
flow etc.
pc/coi 67
MANUAL OF SPECIFICATIONS AND STANDARDS
(vi) Any additional information as required by the Independent Engineer for review
of the drainage system.
68 IRC:SP:73-2007
Section 7
Design of Structures
SECTION 7
DESIGN OF STRUCTURES
7.1 General
(i) All new structures up to 60 m length shall be constructed with an overall width
between outermost faces of the railings/parapets/crash barriers equal to the
roadway width of the approaches.
(ii) All new structures more than 60 m length shall have minimum 7.5 m wide
carriageway, unless specified otherwise in Schedule-B of the Concession
Agreement.
(iii) New structures with footpaths, where so specified in Schedule-B of the
Concession Agreement, shall be constructed with an overall width of 12 m
between the outermost faces of the crash barriers or railings. Raised footpaths
shall be provided.
(iv) All bridges shall be high level bridges, unless specified otherwise in the
Concession Agreement.
(v) All structures shall be designed in accordance with the relevant IRC Codes,
Standards and Specifications.
(vi) All railway level crossings (except railway sidings) shall be replaced with
ROBs/RUBs, unless specified otherwise in Schedule-B of the Concession
Agreement.
(vii) Typical cross sections of the new culverts and bridges for a 2-lane highway
are given in Figs. 7.1 to 7.4.
(viii) Any utility services to be taken on the structures shall be specified in Schedule-
B of the Concession Agreement.
pc/coi 71
MANUAL OF SPECIFICATIONS AND STANDARDS
72 IRC:SP:73-2007
DESIGN OF STRUCTURES
7.5 Hydrology
All the structures shall have adequate waterway. The design discharge shall be
evaluated for flood of 50-year return period.
7.6.1 The Concessionaire shall carry out independent sub-surface investigations to establish
the soil parameters required for detailed design of each foundation separately, if
necessary, in accordance with relevant provisions of IRC:78 and MOSRTH
Specifications.
7.6.2 For single span structures (bridges, overpasses, ROBs etc.), bores shall be taken at
each of the abutment locations. For structures having more than one span, at least
one bore shall be taken at each of the foundation locations.
7.7 Culverts
(i) Existing pipe culverts of diameter 900 mm and above, which are in sound
condition and functioning satisfactorily, may be extended using pipes of same
diameter.
(ii) All culverts having pipe diameter less than 900 mm shall be replaced with pipes
of minimum 1200 mm diameter.
(iii) (a) Suitable bedding for pipes shall be provided as per Clause 2904 of
MOSRTH Specifications
(b) Minimum cushion of 600 mm shall be provided for pipe culverts.
(iv) Floor protection shall be as specified in the relevant IRC Specifications.
pc/coi 73
MANUAL OF SPECIFICATIONS AND STANDARDS
7.8 Prestressing
74 IRC:SP:73-2007
DESIGN OF STRUCTURES
The Concessionaire shall be responsible for the safe, workable design and methodology
for all temporary or permanent forms, staging and centering required for supporting
and forming the concrete of shape, dimensions and surface finish as shown on the
drawings. The following guidelines shall be adopted:
(i) Only steel formwork shall be permitted.
(ii) Shuttering oil (release agent) used shall be such, which permits easy removal
of shutters without leaving stains or other marks on the surface of the concrete.
Requirements given under Clause 3.5 of IRC:87 shall also be complied with.
(iii) In case of tubular staging of heights more than 10 m, special attention shall be
paid to the structural adequacy of the system, efficacy of the connections (clamps
etc), and foundations. Foundation blocks of adequate thickness in M15 cement
concrete shall be provided under the base plates to prevent unequal settlements.
All bent tubular props shall be straightened before re-use and the member with
pc/coi 75
MANUAL OF SPECIFICATIONS AND STANDARDS
deviation from straightness more than 1 in 600 of its length shall not be re-used.
For re-used props, suitable reduction in the permissible loads shall be made
depending upon their condition in accordance with recommendations of the
manufacturer and as reviewed by Independent Engineer.
(iv) In case of prestressed concrete members, the side forms shall be removed as
early as possible and the soffit forms shall permit movement of member without
restraint, when prestress is applied. Form supports and forms for cast-in-situ
members shall not be removed until sufficient prestress has been applied to
carry all anticipated loads during construction stage.
The design of open foundations shall conform to IRC:78. Floor protection shall be
provided as per Section 2500 of MOSRTH Specifications.
(a) The construction of pile foundation in bridges has been introduced rather
recently. The design of pile foundations shall be done as per specialized
literature and IRC:78. The Concessionaire shall submit a method statement to
Independent Engineer for review and comments, if any. The method statement
shall be supported by the following:
(i) Bore-log details for each foundation;
(ii) Design assumptions;
(iii) Design calculations both for new pile or group of piles and for pile type;
(iv) Type of piles- Bored cast-in-situ piles, driven piles and girder piles;
(v) Procedure adopted for installation of piles;
(vi) Arrangements for load testing of piles;
(vii) Format for reporting of tests results.
(b) The Concessionaire shall submit the following information to Independent
Engineer for review and comments, if any, regarding proposed proprietary
system of piling:
(i) Diameter, length and type of pile proposed for the structure;
76 IRC:SP:73-2007
DESIGN OF STRUCTURES
(a) For conventional method of well sinking, the Concessionaire shall submit a
method statement to Independent Engineer for review and comments, if any,
including the following:-
(i) Design calculations and drawings,
(ii) Procedure for sinking and plugging of well,
(iii) Format for reporting of test results.
(b) If proprietary system of well sinking like jack down method is proposed to be
used, the Concessionaire shall submit relevant information to Independent
Engineer for review and comments, if any, covering the following inter-alia:
(i) General features of the system along with specifications and standards
and justification for the thickness of steining proposed to be adopted;
(ii) Authenticated copies of license/agreement, if any;
(iii) Details of plant and equipment to be used along with the names of
manufacturers and name of process/system;
(iv) Details of projects where the system has been successfully used;
(v) Limitations, if any;
(vi) Acceptance tests and criteria;
(vii) Installation & maintenance procedure and schedule;
(viii) Performance Warranty
pc/coi 77
MANUAL OF SPECIFICATIONS AND STANDARDS
Approach slab shall be provided as per provision in Clause 217 of IRC:6 and Section
2700 of MOSRTH Specifications.
7.12 Superstructures
7.12.1 The design of reinforced and prestressed concrete super structures shall be as per
IRC:21 and IRC:18 respectively. The design of steel and steel-concrete composite
super structures shall conform to IRC:22 and IRC:24 respectively.
7.12.2 The Concessionaire shall submit the Method Statement to Independent Engineer for
review and comments, if any, indicating the following inter alia:
(i) Sources of materials,
(ii) Design, erection and removal of formwork,
(iii) Layout of casting yard together with necessary details,
(iv) Production, transportation, laying and curing of concrete,
(v) Sequence of concreting in cast-in-situ construction, side shifting of girders, if
applicable and placing of girders on the bearings,
(vi) Details of construction joints,
(vii) Prestressing system, if required,
(viii) Methodology and equipment for side shifting and launching of pre-cast girders,
(ix) Key personnel for execution and supervision,
(x) Testing and sampling procedure,
(xi) Equipment details.
7.13 Bearings
7.13.1 All bearings shall be easily accessible for inspection, maintenance and replacement.
Design and specifications of bearings shall be as per IRC:83 (Part I, II & III).
Spherical bearings shall conform to the requirements of BS: 5400. The materials of
bearings may, however, conform to the relevant BIS codes nearest to the specifications
specified in BS: 5400. The drawing of bearings shall include the layout plan showing
exact location on top of pier and abutment cap and the type of bearings i.e. fixed/
free/rotational at each location along with notes for proper installation.
78 IRC:SP:73-2007
DESIGN OF STRUCTURES
7.13.2 The Concessionaire shall procure bearings only from the manufacturers approved by
MOSRTH.
7.13.3 The Concessionaire shall submit detailed specifications, designs and drawings
including installation drawings and maintenance manual incorporating the replacement
procedure to the Independent Engineer for review and comments, if any.
7.13.4 The Concessionaire shall obtain a complete Quality Assurance Programme (QAP)
from the manufacturer for the review and comments, if any, by Independent Engineer.
The QAP shall give full details of the process of quality control, raw material testing,
various stages of manufacture, testing on bearing components as well as testing on
complete bearing in conformity with relevant part of IRC:83 prior to the commencement
of manufacture of the bearings.
7.13.5 In addition to the routine testing of the materials and bearings at the manufacturer's
premises, the Concessionaire shall arrange testing of random samples of one per cent
(minimum one number of each type) of bearings from independent agency approved
by Independent Engineer. The bearings shall be selected by Independent Engineer and
duly sealed in his presence for dispatch to the approved independent agency.
7.13.6 The Concessionaire shall submit a certificate of confirmation regarding quality control
measures taken during manufacture of the bearings and the material conforming to
the prescribed standards and specifications. Full lot of bearings of the sample found
to have inferior specifications to those certified by the manufacturer or to have a major
discrepancy in material specifications or fail to meet the acceptance criteria, shall be
rejected.
i) The wearing coat shall be cement concrete in case of curved bridges and box
pc/coi 79
MANUAL OF SPECIFICATIONS AND STANDARDS
7.16.1 Reinforced earth retaining structures shall not be provided for height more than 6 m
and near water bodies. Such structures should be given special attention in design,
construction, maintenance and selection of system/system design.
River training and protective works shall be provided wherever required, for ensuring
the safety of bridges and their approaches on either side. The special features and
design of various types of river training and protective works shall be in accordance
with IRC:89.
(i) For bridges without foot paths, concrete crash barriers shall be provided at the
edge of the carriageway on all new bridges.
(ii) The type design for the crash barriers may be adopted as per IRC:5. The design
loading for the crash barriers shall be as per Clause 209.7 of IRC:6.
(iii) For bridges with foot paths, pedestrian railing shall be provided on the outer
side of footpath.
(iv) The railings of existing bridges shall be replaced by crash barriers, where
specified in Schedule-B of the Concession Agreement.
80 IRC:SP:73-2007
DESIGN OF STRUCTURES
7.19.1 ROB/RUB shall be provided on all railway level crossings, unless otherwise specified,
in Schedule-B of the Concession Agreement
(i) In case the bridge is to be provided over an existing level crossing, 2-lane
bridges shall be constructed with overall width as given in sub-para 7.1(i) of
this Section. The horizontal and vertical clearances to be provided shall be as
per requirement of the Railway authorities.
(ii) In general, the Railways require that in the railway boundary there is no solid
embankment, provision is made for future expansion of railway line, provision
of vertical clearances as per requirement of electric traction and excavation for
foundations shall be sufficiently away so as not to endanger the safety of the
running tracks.
(iii) The Concessionaire shall be required to obtain approvals of all designs and
drawings from the concerned Railway authorities. The design of structure shall
be in accordance with relevant IRC codes.
(iv) The construction of ROB within the Railway boundary shall be under the
supervision of Railway officers.
(i) Full roadway width as in the approaches shall pass below the bridge structure.
The service roads shall be continued in the bridge portion also.
(ii) The vertical and lateral clearances shall be as per guidelines given in
Section 2 of this Manual.
(iii) These structures shall be designed to carry railway loads. The Concessionaire
shall be required to obtain approvals of all designs and drawings from the
concerned railway authorities. The design of structure shall be in accordance
with relevant Railway codes.
pc/coi 81
MANUAL OF SPECIFICATIONS AND STANDARDS
7.20.1 The location and type of grade separated road structures to be provided on the Project
Highway shall be as specified in Schedule-B of the Concession Agreement.
7.20.2 The vertical and lateral clearances shall be as per requirements given in Section 2
of this Manual. Design of structures shall conform to the requirements specified in
this Manual.
7.21 Drainage
An effective drainage system for the bridge deck structure shall be planned and
designed so as to ensure that water from the deck is taken down to ground level/
drainage courses by adequate size of drainage spouts and pipes.
82 IRC:SP:73-2007
DESIGN OF STRUCTURES
(iv) The Concessionaire shall take up repair and widening of existing bridge at a
particular site only after making all arrangement for diversion of traffic so as
to ensure that a smooth flow of traffic is maintained. The Concessionaire shall
take all precautions to guard against any accident of traffic due to such diversion
and shall use all necessary road signs, etc. for the purpose. After completion
of repair and widening of the existing bridge, temporary works carried out for
such diversions shall be made good by the Concessionaire.
The Concessionaire shall furnish the design report including the following to the
Independent Engineer for his review and comments, if any.
(i) Sub surface exploration report as per IRC:78 as specified in para 7.6 above.
(ii) Hydrological investigation report including design discharge calculation for the
bridges, in case of any change in the proposed waterway of any bridge as
specified in para 7.5 above.
(iv) Detailed report regarding the bridges whose width is less than the roadway
width and the proposal for its improvement.
pc/coi 83
MANUAL OF SPECIFICATIONS AND STANDARDS
Roadway 12.0
Parapet Parapet
Wall Wall
Note:
All dimensions are in metres.
Fig. 7.1
Roadway 12.0
Note:
All dimensions are in metres.
Fig. 7.2
84 IRC:SP:73-2007
DESIGN OF STRUCTURES
Note:
All dimensions are in metres.
Fig. 7.3
1.5
0.25 1.5 8.5 0.25
Carriageway
Pedestrian Footpath Footpath
Pedestrian
Railing
Railing
Note:
All dimensions are in metres.
Fig. 7.4
pc/coi 85
Section 8
8.1 General
(i) All materials to be used in the structures shall be in conformity with the IRC/
MOSRTH Specifications, unless specified otherwise in this Section. If the
Concessionaire proposes to use any material, which is not covered in IRC/
MOSRTH Specifications, it shall conform to relevant Indian Standards, if there
are any, or to the requirements specified in this Manual. Proprietary products
proven by international usage in comparable bridge projects, proposed to be
used shall be supported with authenticated licensing arrangement with the
manufacturer.
(ii) The Concessionaire shall identify the proposed sources of materials and submit
the proposal to IE for review and comments, if any, prior to delivery. If it is
found that proposed sources of supply do not produce uniform and satisfactory
products at any time during execution, the Concessionaire shall procure
acceptable materials conforming to the specifications from other sources.
(iii) The samples required for review shall be supplied well in advance, at least 48
hours or minimum time required for carrying out the relevant tests, whichever
is more. Delay in submission of samples shall not be acceptable as a reason
for delay in completion of the works/extension of time for completion.
pc/coi 89
MANUAL OF SPECIFICATIONS AND STANDARDS
(v) The Concessionaire shall set up a full-fledged laboratory at site, as per the
agreement for testing of all materials and finished products. He shall make
arrangements for additional/confirmatory testing of any material including
imported materials/products for which facilities at site laboratory are not
available.
8.2.1 The Concrete for use in structures shall conform to the provisions in Clauses 302.6
to 302.9 of IRC:21 and Section 1700 of MOSRTH Specifications. Wherever High
Performance Concrete (HPC) is proposed to be used, the same shall conform to the
provisions of IRC:SP:70. Sampling and Testing of Concrete shall be as per Clause
302.10 of IRC:21. Acceptance criteria for concrete shall conform to Clause 302.11
of IRC:21. Concrete to be produced shall conform to the requirements as specified
below.
8.2.2 A dense and well compacted concrete provides effective protection against corrosion
of steel in reinforced/prestressed concrete members. To achieve this, the Concessionaire
shall pay special attention to the following elements, which have a bearing on the
production of a durable concrete:-
(i) Quality of materials - cement, aggregate, water and admixtures, both mineral
and chemical,
(ii) Mix design,
(iii) Mixing and placing of concrete - Concrete shall preferably be produced in a
mixing and batching plant,
(iv) Vibration and compaction,
(v) Curing,
(vi) Cover to reinforcement/tendons, and
(vii) Detailing.
8.2.3 The following points are also important in production of durable concrete, which shall
be duly considered and adopted:-
(i) Minimum chloride content in concrete as specified in IRC:21,
(ii) Regular testing of water used for making concrete as per IRC:21,
90 IRC:SP:73-2007
DESIGN OF STRUCTURES
8.2.4 The mix designs for concrete shall be got reviewed by the Independent Engineer prior
to construction.
8.3 Cement
Any type of cement specified in IRC:21 may be used for the works subject to
limitations, if any, specified therein.
(i) Before the commencement of the works, at least three samples in accordance
with the procedure laid down in IS: 2430 shall be taken for each quarry source
to ascertain the quality, suitability and fitness of the available material for use
in the works. Fresh tests shall be conducted, in case there is any change in the
source or the type of rock being quarried. The proposal, along with a copy of
test reports, shall be submitted to the Independent Engineer for review and
comments, if any.
(ii) Aggregate having more than 0.5% of sulphate as SO3 with water absorption
more than 2% of its own weight shall not be used.
(iii) In case of doubt, the alkali-aggregate reactivity shall be tested in accordance
with IS: 2386 (Part 6). Coarse aggregates having positive alkali-silica reaction
(ASR) shall not be used.
(iv) The maximum value of flakiness index for coarse aggregates shall not exceed
35 percent.
(i) All fine aggregates shall conform to IS:383 and tests for conformity shall be
carried out as per IS:2386 (Part I to VIII). The fineness modulus of fine
aggregates shall be between 2.0 and 3.5.
(ii) Before the commencement of the works, at least three samples as per IS: 2430
shall be taken for each quarry source, to ascertain the quality, suitability and
fitness of the available material for use in the works and the proposal along
pc/coi 91
MANUAL OF SPECIFICATIONS AND STANDARDS
with a copy of test reports shall be submitted to the Independent Engineer for
review and comments, if any.
(iii) Fine aggregates having positive alkali-silica reaction shall not be used.
8.6 Water
(i) Water for use in the works for mixing and curing shall be in conformity with
Clause 302.4 of IRC:21.
(ii) Water from each source shall be tested before the start of works and thereafter
every three months and after each monsoon, till the completion of the works
and proposal along with a copy of test reports shall be submitted to the
Independent Engineer for review and comments, if any.
8.7.1 Chemical Admixtures are proprietary items and shall be obtained only from reputed
manufacturers with proven track record, quality assurance and full-fledged laboratory
facilities for manufacture and testing.
8.7.2 The following guidelines shall be followed in their selection and use of the
admixtures:-
(i) The chemical admixtures shall comply with IS: 9103 and meet the requirements
stipulated in Clause 5.5 of IS:456.
(iii) Compatibility of admixture with the cement being used shall be tested before
actual use in the works. The test shall be repeated in case of change of type
or grade or source of cement.
(iv) Admixtures shall not impair the durability of concrete. They shall not combine
with the ingredients to form harmful compounds or endanger the protection of
reinforcement against corrosion.
(v) The packing of admixtures shall clearly indicate the name of the manufacturer/
supplier, brand name (name of the product), date of production and expiry,
batch/ identification number.
92 IRC:SP:73-2007
DESIGN OF STRUCTURES
8.7.3 The Concessionaire shall obtain a Certificate from manufacturer/supplier and submit
to the Independent Engineer for review and comments, if any. The Certificate shall
include the following information concerning the proposed admixture;
(i) Normal dosage with permissible range as a percentage of weight of cement and
adverse effects, if any, of over and under dosage.
(ii) Chemical names of main ingredients.
(iii) Chloride content, if any, expressed as a percentage by weight of the admixture.
(iv) Values of dry material content with relative density of the admixture, which
can be used for Uniformity Tests.
(v) pH value and colour.
(vi) Whether or not the proposed admixture leads to the entrainment of air when
used as per the manufacturer's recommended dosage and if so, to what extent.
(vii) Where two or more admixtures are proposed to be used in any one mix,
confirmation as to their compatibility.
(viii) Confirmation that there is no risk of corrosion of reinforcement or other
embedments.
(ix) Latest date of test and name of the laboratory.
(x) Shelf life, maximum and minimum temperature for storage, precautions to be
taken while mixing and any other instructions for use.
8.7.4 In addition to conforming to the requirements of IS:9103, the proposed admixture shall
also satisfy the following conditions;
(i) "Plasticisers" and "Super-Plasticisers" shall meet the requirements indicated for
"Water reducing Admixtures".
(ii) The chloride content of the admixture shall not exceed 0.2 per cent by weight
of admixture when tested in accordance with IS:6925.
(iii) Except where resistance to freezing and thawing and to disruptive action of
deicing salts is necessary, the air content of freshly mixed concrete in
accordance with the pressure method given in IS:1199 shall not be more than
2 percent higher than that of the corresponding control mix and in any case,
not higher than 3 percent of the test mix.
(iv) Uniformity tests on the admixtures are essential to compare qualitatively the
composition of different samples taken from batch to batch or from same batch
pc/coi 93
MANUAL OF SPECIFICATIONS AND STANDARDS
at different times. The tests that shall be performed along with permissible
variations over the values stated by the manufacturer are given below;
(v) All tests relating to the concrete admixtures shall be conducted periodically at
an independent laboratory and compared with the data furnished by the
manufacturer.
8.8 Steel
(a) Plain hard drawn steel wire conforming to IS:1785 (Part-I) and IS:1785
(Part- II),
(b) Cold drawn indented wire conforming to IS:6003,
(c) High tensile steel bar conforming to IS:2090,
(d) Uncoated stress relieved strand conforming to IS:6006, and
(e) Uncoated stress relieved low relaxation steel conforming to IS:14268.
(ii) Data in respect of modulus of elasticity, relaxation loss at 1000 hours, minimum
ultimate tensile strength, stress-strain curve etc. shall be obtained from the
manufacturers. Prestressing steel shall be subjected to acceptance tests prior to
actual use on works. Guidance may be taken from BS:4447. The modulus of
elasticity value, as per acceptance tests, shall conform to the design value, which
shall be within a range not more than 5 per cent between the maximum and
the minimum.
(i) All reinforcing steel for use in works, shall be procured from original producers
or their authorized agents.
94 IRC:SP:73-2007
DESIGN OF STRUCTURES
(ii) Only new steel shall be brought to the site. Every bar shall be inspected before
assembling on the work and defective, brittle or burnt bars shall be discarded.
Cracked ends of bars shall be cut before use.
(iii) All reinforcement shall be free from loose rust and coats of paints, oil, mud
or any other substances, which may destroy or reduce bond. The reinforcement
bars bent and fixed in position shall be free from loose rust or scales, coats
of paints, oil, mud or chloride contamination and other corrosion products.
Where cleaning of corroded portions is required, effective method of cleaning
such as sand blasting or other method shall be submitted to the Independent
Engineer for prior review and comments, if any.
Mild steel, high tensile steel, cast steel, steel forgings, and stainless steel shall conform
to the provisions contained in clause 925.1 of IRC:83 (Part III).
All structural steel, castings and forgings, fasteners (bolts, nuts, washers and rivets),
welding consumables, wire ropes and cables shall conform to the provisions of
Clauses 505.1.2, 505.2, 505.3, 505.4 and 505.6 of IRC:24 respectively.
The Concessionaire shall submit test results of all materials and finished products
proposed to be used in the Project Highway, as specified in the QC documents, to
the Independent Engineer for review and comments, if any.
pc/coi 95
Section 9
9.1 General
(i) Traffic control devices shall comprise of traffic signs, road markings, safety
barriers, pedestrian railings, etc. Guidelines given in IRC:35, IRC:67 and Section
800 of the MOSRTH Specifications shall be followed in adopting appropriate
road markings and traffic signs, unless otherwise specified in this Section.
(ii) The Concessionaire shall also follow the guidelines and suggestions stipulated
in the MOSRTH "Manual for Safety in Road Design", while designing,
constructing, operating and maintaining the two-lane highway.
All road markings shall conform to IRC:35. Road markings shall comprise of
carriageway markings such as longitudinal markings on intersections, hazardous
locations, parking, etc. and object markings such as object within the carriageway,
adjacent to carriageway and marking on kerbs.
9.2.1 Material
(i) Hot applied thermoplastic paint with glass beads shall be used as carriageway
marking materials.
(ii) Road marking paint conforming to IS:164 shall be used for object markings.
The cat's eyes or road studs are used to form a semi-permanent marking and provide
improved visibility during night time and wet-weather conditions. These shall be either
reflex lens type or solid white beads. These shall be provided at hazardous locations
and while approaching important intersections, to supplement the paint or thermoplastic
line markings and road stretches passing through municipal areas or village
settlements and habitations.
There are three types of road signs viz., mandatory/regulatory signs, cautionary/
warning signs, and informatory signs. Locations of signs shall conform to IRC:67 and
Section 800 of MOSRTH Specifications.
pc/coi 99
MANUAL OF SPECIFICATIONS AND STANDARDS
9.3.1 Sheeting
The retro-reflective sheeting shall be used on the signs. The sheeting shall be weather-
resistant and show colourfastness. It shall be new and unused and shall show no evidence
of cracking, scaling, pitting, blistering, edge lifting or curling and shall have negligible
shrinkage or expansion. A certificate of having tested the sheeting for these properties
in an unprotected outdoor exposure facing the sun for two years and its having passed
these tests shall be obtained from a reputed laboratory by the manufacturer of the
sheeting and shall be provided for review and comments, if any, of the Independent
Engineer. The reflective sheeting shall be of High Intensity Grade with encapsulated
lens or with micro prismatic retro-reflective element material as specified by the
Government. The retro-reflective surface after cleaning with soap and water and in dry
condition shall have the minimum co-efficient of retro-reflection (determined in
accordance with ASTM Standard D 4956-04) as indicated in Tables 9.1 and 9.2.
9.3.2 Messages/Borders
The messages (legends, letters, numerals etc.) and borders shall either be screen-
printed or of cut-outs. Screen-printing shall be processed and finished with materials
and in a manner specified by the sheeting manufacturers.
100 IRC:SP:73-2007
TRAFFIC CONTROL DEVICES AND ROAD SAFETY WORKS
Observation Entrance WhiteA YellowA GreenA RedA BlueA Fluorescent Fluorescent Fluorescent
Angle Angle Yellow- YellowA OrangeA
Green A
Cut out messages and borders, wherever used, shall be made out of retro-reflective
sheeting (as per para 9.3.1), except those in black, which shall be non-reflective as
specified by the manufacturer. The cutouts shall be bonded properly with the base
sheeting in the manner specified by the manufacturer.
(i) Unless specified otherwise, the general colour scheme shall be in accordance
with IRC:67, the colours shall be as stipulated in IS:5 "Colour for Ready Mixed
Paints".
(ii) The colours shall be durable and uniform when seen in daylight or under normal
headlights at night.
(iii) Direction, destination and plate identification signs shall have green background
and white messages (legends, letters, numerals, etc.) and borders.
(iv) Colour scheme for facility information signs, other useful information signs and
parking signs shall conform to the provisions contained in IRC:67. In respect
of informatory signs, the messages/borders shall either be screen-printed or
of cutouts, while for warning and regulatory signs, these shall be screen-
printed.
pc/coi 101
MANUAL OF SPECIFICATIONS AND STANDARDS
(v) Clustering and proliferation of road signs shall be avoided for enhancing their
effectiveness.
9.3.4 Adhesives
The sheeting shall either have a pressure-sensitive adhesive of the aggressive tack
requiring no heat, solvent or other preparation for adhesion to a smooth clean surface,
or a tack free adhesive activated by heat applied in a heat-vacuum applicator, in a
manner recommended by the sheeting manufacturer. The adhesive shall be protected
by an easily removable liner (removable by peeling without soaking in water or other
solvent) and shall be suitable for the type of material of the base plate used for the
sign. The adhesive shall form a durable bond to smooth corrosion and weather
resistant surface of the base plate such that it shall not be possible to remove the
sheeting from the sign base in one piece by use of sharp instrument. In case of pressure
sensitive adhesive sheeting, the sheeting shall be applied in accordance with the
manufacturer's specifications. Sheeting with adhesives requiring use of solvents or
other preparation for adhesive shall be applied strictly in accordance with the
manufacturer's instructions.
9.3.5 Installation
The sign posts, their foundations and sign mountings shall be so constructed as to
hold them in a proper and permanent position against the normal storm wind loads.
Normally, signs with an area upto 0.9 sqm shall be mounted on a single post, and
for greater area two or more supports shall be provided. Sign supports may be of
mild steel (MS), reinforced concrete or Galvanized Iron (GI). Post end(s) shall be
firmly fixed to the ground by means of properly designed foundation. The work of
foundation shall conform to relevant IRC/CPWD/PWD Specifications.
All components of signs and supports, other than the reflective portion and GI posts
shall be thoroughly descaled, cleaned, primed and painted with two coats of epoxy
paint. Any part of MS post below ground shall be painted with three coats of red
lead paint.
The signs shall be fixed to the posts by welding in the case of steel posts and by
bolts and washers of suitable size in the case of reinforced concrete or GI posts. After
the nuts have been tightened, the tails of the bolts shall be furred over with a hammer
to prevent removal.
Important informatory signs such as approaching important locations, like Toll Plaza,
major town shall be mounted on gantries, in the form of overhead signs.
102 IRC:SP:73-2007
TRAFFIC CONTROL DEVICES AND ROAD SAFETY WORKS
The Concessionaire shall obtain from the manufacturer a seven year warranty for
satisfactory field performance including stipulated retro-reflectance of the retro-
reflective sheeting of high intensity grade and submit the same to the Independent
Engineer for review and comments, if any.
There are two types of safety barriers viz., longitudinal roadside safety barriers and
median safety barriers.
9.4.1 Warrants
The longitudinal roadside barriers are basically meant to shield two types of roadside
hazards i.e. embankments and roadside obstacles and also for preventing the vehicles
veering off the sharp curves. The warrants for a fill section in terms of the height
and slope needing protection with roadside barriers are shown in Fig.9.1. The barrier
is not warranted for embankment having a fill slope of 3: l or flatter. The warrants
for roadside objects are mainly dependent upon the type of obstacle and the probability
of their being hit. A barrier shall be installed only if the result of vehicle striking
the barrier is likely to be less severe than the severity of accident resulting from the
vehicle impacting the unshielded obstacle. Some of the commonly encountered
roadside obstacles are bridge piers, abutments and railing ends, roadside rock mass,
culverts, pipes and headwalls, cut slopes, retaining walls, lighting supports, traffic
signs and signal supports, trees and utility poles.
These steel barriers are of strong post type and usually remain functional after
moderate collisions, thereby eliminating the need for immediate repair.
pc/coi 103
MANUAL OF SPECIFICATIONS AND STANDARDS
(i) Design Aspects: The "W" beam type safety barrier consists of a steel post and
3 mm thick "W" beam rail element which is spaced away from the posts. The
spacer minimizes vehicular snagging and reduces the likelihood of a vehicle
vaulting over the barrier. The steel posts and the blocking out spacer shall both
be channel section of 75 mm x 150 mm size and 5mm thick. The rail shall
be 700 mm above ground level and posts shall be spaced 2 m center to center.
Typical details are shown in Fig. 9.2.
The thrie beam safety barrier shall have posts and spacers similar to the
ones mentioned above for "W" beam type. The rail shall be placed
850 mm above the ground level. This barrier has higher initial cost than
the "W" beam type but is less prone to damages due to vehicle collisions
especially for shallow angle impacts. Typical details of thrie beam barrier
are shown in Fig. 9.3.
The "W" beam, the thrie beam, the posts spacers and fasteners for steel barriers
shall be galvanized by hot dip process.
(ii) End treatment for steel barrier: An untreated end of the roadside barrier can
be hazardous, if hit, because the barrier beam can penetrate the passenger
compartment and cause the impact vehicle to stop abruptly. End treatments
should therefore form an integral part of safety barriers. End treatment should
not spear vault or roll a vehicle for head-on or angled impacts. The two end
treatments recommended for steel barriers are "Turned down guardrail and
Anchored in back slope".
Turned down guardrails have the "W" or thrie sections, reduced from full
height to ground level, with a gentle slope over a distance of 8 to 9 m.
The turned down rail is intended to collapse on impact, allowing the vehicle
to pass over it without becoming airborne or unstable. In order to locate
the barrier terminal away from the travelled way and to minimize driver's
reaction to a hazard near the road, by gradually introducing a parallel barrier
installation or to transition a roadside barrier nearer the roadway, such as
a bridge parapet or a railing, the turned down rail should be flared away
from the roadway. Suggested flare rates depend upon the design speed and
the type of barrier (Table 9.3).
104 IRC:SP:73-2007
TRAFFIC CONTROL DEVICES AND ROAD SAFETY WORKS
Flare Rates
Design speed in km per hour
Rigid barriers Semi-rigid barriers
100 17:1 13:1
80 14:1 11:1
65 11:1 9:1
50 8:1 7:1
40 8:1 7:1
30 8:1 7:1
The posts in the end treatment should have the same cross sections as provided
in the main barrier.
At road cross-sections in cutting or if the road transitions from cut to fill, the
safety barriers can be anchored in back slopes. The back slope covering the
anchored portion of the barrier should be graded flat with side slopes preferably
not steeper than 10:1. The anchored portion should develop a tensile strength
in the rail element to prevent the rail from pulling out of the anchorage. The
barrier can also be anchored in an earth berm specially constructed for this
purpose, provided the new berm itself is not a hazard to the traffic. The earth
berm should be made impervious to erosion.
As far as possible, the safety barrier should be placed beyond 2.5 m of the
travelled way. For long and continuous stretches, this offset is not critical. The
distance between the barrier and the hazard should not be less than the
deflection of the barrier by an impact of a full sized vehicle. In case of
embankments, a minimum distance of 600 mm should be maintained between
the barrier and the start of embankment slope of a hazard to prevent the wheels
from dropping over the edge. Typical details are shown in Fig. 9.4.
pc/coi 105
MANUAL OF SPECIFICATIONS AND STANDARDS
Flatter flare rates may be used, particularly where extensive grading would be
required to ensure a flat approach from the travelled way, subject to the
availability of right of way.
(i) Design Aspects: Roadside concrete safety barriers are rigid barriers having a
sloped front face and a vertical back face. The recommended designs of the
cast in-situ and pre-cast barriers are shown in Figs.9.5 and 9.6 respectively.
Based on evaluation of vehicle direction, sight distance, structural stability and
the psychological effect of barrier height on driver reaction, the most desirable
height of the median barrier is 800 mm. Variations upto 50 mm in height of
barrier can be made in the total height of the barrier to meet the site
requirements. It is, however, important to maintain the height of lower slope
between 200 mm and 350 mm so as to reduce the chances of overturning of
the vehicles.
(ii) End Treatment: Safety barrier shall be provided with an end treatment, which
shall be obtained by tapering the height of terminating end of the median
barrier within a length of 8 m to 9 m.
9.4.5 General
(i) Raised curbs or drains shall not be provided between the travelled way and the
barriers. These destabilize the vehicle balance and disturb its equilibrium before
it strikes the barrier, thus defeating the essential purpose of safety and
redirection of the impacting vehicle.
(ii) In rural situations, both the roadside and the median barriers shall preferably
be steel barriers. Concrete barriers shall be preferred in urban situations.
106 IRC:SP:73-2007
TRAFFIC CONTROL DEVICES AND ROAD SAFETY WORKS
The execution of work shall be so planned that the inconvenience to the traffic is
minimal. The temporary diversion, where constructed, shall conform to the following
minimum standards:
(i) Width of diversion road shall be equal to the width of the existing carriageway
but not less than 5.5 m.
The Concessionaire shall submit proposals for traffic control devices and road safety
works together with drawings and details to the Independent Engineer for review and
comments, if any. The proposals shall include:
(i) Details covering type, location, material specifications, installation details and
the requisite warranties for satisfactory field performance (as applicable) in
respect of road signs, road markings and roadside safety barriers;
(ii) Traffic Management Plan during construction in accordance with the requirement
specified in para 9.5 above.
pc/coi 107
MANUAL OF SPECIFICATIONS AND STANDARDS
Fill section
Travelled Shoulder embankment
b1 Height
a1
1
1--- : 1
2
0.6
Barrier
0.5 2:1
Reciprocal of embankment slope ( b1 /a1)
warranted
3:1
0.3
4:1
0.2 5:1
Barrier not warranted for embankment.
However check barrier needed for other
6:1
roadside hazards
0.1
0.0
0 3 6 9 12 15 18
Fill section height (m)
108 IRC:SP:73-2007
TRAFFIC CONTROL DEVICES AND ROAD SAFETY WORKS
20
330
700
3 mm Thick
1800
Note:
All dimensions are in mm.
pc/coi 109
MANUAL OF SPECIFICATIONS AND STANDARDS
30
176
546
194
850
Post and block
75x150x5
channel section
2000
Note:
All dimensions are in mm.
110 IRC:SP:73-2007
TRAFFIC CONTROL DEVICES AND ROAD SAFETY WORKS
600 mm minimum
desirable
pc/coi 111
112
200 50 110
125 Construction joint at
CL suitable spacing
38 cover
all around
25 x 450 dowels
at end joints
R 250 Dowels
810 to 860
MANUAL OF SPECIFICATIONS AND STANDARDS
(25 x 450 )
250 to 300
Concrete M 30
75 to 125
20
Note:
1. HYSD-High yield strength deformed reinforcement.
2. All dimensions are in mm.
IRC:SP:73-2007
pc/coi
6000
A
Lifting spacing
bar V
150 (TYP)
1 (TYP)
A
25
1800 2400 1800
80 280
12 ø HYSD
See detail B
12 ø HYSD bars L 150 C/C
4° draft
bars L 150 C/C 5 R
75 + 0.3
75 + 0.3
4° draft
Bar V
30 30
250 R Female Male
810 to 860
30
End keyway Detail "B"
25 R
250
75
to Note:-
125
1. Concrete M 30.
Cont. keyway 2. Place on 25 mm grout bed.
at bottom
3. High Yield Strength Deformed
Bar V- Lifting hooks (HYSD) reinforcement.
300
12 ø HYSD 4. All dimensions are in mm.
View A-A
113
Section 10
Toll Plazas
SECTION 10
TOLL PLAZAS
10.1 General
The Concessionaire shall provide required number of Toll Plazas for collection of toll
as per the Concession Agreement. The fee collection system shall be speedy, efficient
and user friendly. The design of the Toll Plazas should be such that they are
aesthetically pleasing and efficient and the fee collection staff should be quick,
courteous and adequately trained before deployment.
Adequate land for Toll Plaza shall be acquired to permit the provision of a minimum
number of 8 toll lanes including all other buildings and structures to be accommodated
at the Toll Plaza location. Land shall be acquired by the Government at its own cost.
However, the Government may, if so specified, require the Concessionaire to procure
the same on behalf of the Government.
10.4.1 Stage construction of Toll Plaza in respect of number of toll lanes shall be allowed.
However, other structures as envisaged in the Concession Agreement shall be provided
at the initial stage itself.
pc/coi 117
MANUAL OF SPECIFICATIONS AND STANDARDS
(iv) Provision for future expansion: The office building shall be located taking into
consideration the future expansion.
The number of lanes at the Toll Plaza in initial stage should be corresponding to the
forecast traffic for at least 5 years.
Peak hour factor — Percentage of traffic travelling during peak hour to average
daily traffic.
The number of toll lanes for the Toll Plaza may be derived using Table 10.1.
7,000-12,000 2 2 3 3
10.4.4 If at any time, the queue of vehicles becomes so large that the waiting time of the
user exceeds three minutes, the number of toll lanes shall be increased so that the
maximum waiting time is brought down to less than three minutes.
118 IRC:SP:73-2007
TOLL PLAZAS
A minimum semi-automatic system for toll collection shall be adopted. In this system,
the collection of tolls and recording data would be made through electronic equipment.
Within a period of 5 years from COD, at least one booth for either side traffic shall
be upgraded to toll collection with the help of smart card.
For smooth and efficient functioning of toll collection, the following arrangements/
facilities shall be provided:
(i) The staff posted at the counters shall be provided with sufficient equipment and
small denomination notes/coins at the start of each shift.
(ii) Intercom facility shall be provided between booths and the office of the
Supervisors.
(iii) If any booth is closed for any reason, incoming traffic shall be guided into the
adjoining working booth with the help of appropriate signs.
Each lane shall be equipped with micro-controller based vehicle counting and
classifier and battery backup to collect data in the case of power failure.
Toll booths may be provided of prefabricated materials or of brick masonry. The toll
booths shall have adequate space for seating of toll collector, computer, printer, cash
box, etc. It should have provision for light, fan and air conditioning. The typical details
of toll booth are given in Fig. 10.2.
Vehicles are required to decelerate while entering the toll lane, stop for payment and
then accelerate and merge in the main line traffic of the highway. All these operations
of vehicles at Toll Plaza are prone to oil/POL spillage on the surface, which may have
cut-back action on bituminous surface. Therefore, concrete pavement would be
preferred in the Toll Plaza area including tapering zone, from durability and long term
serviceability consideration. The rigid pavement shall be designed as per IRC:58. For
this work, use of paver shall not be insisted.
pc/coi 119
MANUAL OF SPECIFICATIONS AND STANDARDS
10.7.1 A well thought out strategy should be evolved for providing traffic signs at the Toll
Plaza, in accordance with IRC:67.
10.7.2 Signs should be placed along the Project Highway, roadway of Toll Plaza to guide
and render assistance to the drivers approaching Toll Plaza. It is necessary to remind
the driver about the existence of Toll Plaza one km ahead with a repeater sign
500 m ahead. Stop sign shall always be used in combination with certain road
markings such as stop line and the word 'STOP' marked on the pavement.
10.7.3 The Toll Plaza sign should be supplemented by the sign advising the users of the
notified toll rates for various types of vehicles. Typical details of road signs required
for toll purpose are given in Figs. 10.3 to 10.8.
10.8.1 The road markings shall be in accordance with Section 9 of this Manual. The road
markings for the Toll Plaza area shall consist of lane markings, diagonals, chevron
markings. Single centre line is provided at the centre of carriageway at toll gate to
demarcate each service lane. Diagonal markings for central traffic island and chevron
markings at side traffic island shall be provided to guide the approaching and
separating traffic.
10.8.2 The road markings shall be in accordance with provision of IRC:35. Thermoplastic
paint with reflective glass beads shall be used as road marking material. Typical details
of road markings at Toll Plaza are given in Fig 10.9.
10.9.1 The size of the office complex depends on the minimum requirement of facilities such
as toilet, bathroom, store, rest room, traffic aid post, medical aid post, etc. All these
depend on the size of Toll Plaza and may vary as per the need of a particular location/
area.
120 IRC:SP:73-2007
TOLL PLAZAS
A boom barrier is generally placed at the exit of each lane to avoid passing of any
vehicle without payment of toll. Electrically operated barrier gates shall be used.
10.11 Lighting
10.11.1 The Toll Plaza complex shall have continuous and reliable electric supply system
for efficient functioning.
The toll booths and facility building office shall be illuminated adequately. Indoor
lighting should be with fluorescent lamps. Lighting should be provided in such a
manner that glare is avoided or minimised. The level of illumination shall be 200
to 300 Lux as per IS:3646 (Part II).
Lighting of the Toll Plaza is important for enhancing the night visibility. The lighting
system shall consist of the following major components:
(i) High Mast lighting.
(ii) Lighting on both side approaches to the Toll Plaza.
(iii) Canopy lighting of complex.
(iv) Back up arrangement in case of power failure.
(v) Highway lighting around Toll Plaza.
IS:1944 (Part I & II) recommends 30 Lux of average illumination on road surface
and ratio of minimum to average illumination as 0.4. Normal low light poles are
not able to give the required lighting conditions. It is, therefore, necessary to install
high mast. The 30 m height of the mast is considered suitable to have uniform spread
of desired level of illumination in the Toll Plaza area for frequent and safe movement
of vehicles.
Lighting in 100 m length on both side approaches of Toll Plaza shall be provided
to enhance the safety on highway and to make the drivers conscious of their
approaching the toll gate.
pc/coi 121
MANUAL OF SPECIFICATIONS AND STANDARDS
A higher level of illumination upto 100 Lux by providing 150-watt metal halide
lamps shall be provided at the toll gate and at toll booth locations. 1000-watt halogen
lamps shall be provided at the selected nodes of space frame of the canopy to ensure
uniform illumination of the area.
Adequate water supply shall be provided. For working out water requirement and
internal drainage system, reference may be made to IS:1172, IS:5339 and IS:1742.
For protection of the Toll Plaza complex against fire hazards, adequate fire protection
arrangements shall be made.
The design and layout of Toll Plaza complex, including all facilities shall be
submitted to the Independent Engineer for review and comments, if any.
122 IRC:SP:73-2007
pc/coi
300.00
125.0 50.00 125.0
Extra wide A
10 vehicle lane 10
1 1
1 1
10 A 10
2+2-lane toll plaza
CL
Proposed row
Right of way
Extra width for future widening
depending upon the width of acquired
land and height of embankment
Cross section A-A
Note:
All dimensions are in metres.
123
124
150 mm
400 mm
250 mm
150 mm
Clearance below
Elevation of safety block toll canopy
Traffic
signal
Barrier Safety block
5.50 (minimum)
3.00
0.80
0.9
0.2
2.50 1.20
MANUAL OF SPECIFICATIONS AND STANDARDS
0.30
R=0.5
1.80
1.20
Traffic flow direction
25.00
Note:
All dimensions are in metres.
Fig. 10.2 : Recommended layout for traffic island with toll booth
IRC:SP:73-2007
As required As required
pc/coi
1000
500
T8
T1 T2 T3 T4 T5
500 100 T6 T7
T7 T6 T5 T4 T3 T2 T1
500
1000
As required
Note:
1. Generally road signs shall be in
accordance with IRC 67-2001.
2. All dimensions are in metres.
125
126
MANUAL OF SPECIFICATIONS AND STANDARDS
Note:
All dimensions are in mm.
IRC:SP:73-2007
pc/coi
Note:
All dimensions are in mm.
TOLL PLAZAS
127
Fig. 10.5 : Overhead sign for toll gate
128
MANUAL OF SPECIFICATIONS AND STANDARDS
Note:
All dimensions are in mm.
Fig. 10.6 : Side mounted sign for toll gate (upper panel)
IRC:SP:73-2007
pc/coi
Note:
All dimensions are in mm.
Fig. 10.7 : Side mounted sign for toll gate (lower panel)
TOLL PLAZAS
129
MANUAL OF SPECIFICATIONS AND STANDARDS
Note:
All dimensions are in mm.
Fig. 10.8 : Recommended sign layout for toll rates (side mounted)
130 IRC:SP:73-2007
pc/coi
Toll rate sign Edge of carriageway line (150)
Bar markings
1
5m
32 m 32 m 30 m 28 m 26 m 23 m 20 m 17 m 13 m 9 m
6
Details of 1 Continuous yellow lines (100)
Note:
1. Generally pavement marking shall be
in accordance with IRC 35-1997.
2. All dimensions are in mm unless
otherwise specified.
131
Section 11
Roadside Furniture
SECTION 11
ROADSIDE FURNITURE
11.1 General
Road boundary stones shall be provided at the boundary on both sides of the right
of way available under the control of the Government. These shall be spaced at 200 m.
The boundary stones shall be of cement concrete as per Type Design given in IRC:25.
The boundary stones shall be painted with cement primer and enamel paint and
marked 'RBS' by paint.
(i) The Km and 200 m stones shall be provided on one side of the Project Highway.
The side of the road on which such stones will be provided, shall be decided
by the Government.
(ii) The design and specifications of Kilometre stone shall conform to IRC:8. The
matter to be written on various Kilometre stones and the pattern thereof, shall
be as specified in IRC:8.
(iii) 200 m stones shall be provided at every 200 m distance. The design and
specification of 200 m stone shall conform to IRC:26. The matter to be written
on various 200 m stones shall be as specified in IRC:26.
pc/coi 135
MANUAL OF SPECIFICATIONS AND STANDARDS
(ii) Design: The design shall be such that the guardrails are neat and simple in
appearance. The height of guardrail shall be 1.2 m from footpath level. The
visibility of the approaching vehicles by the pedestrians as well as the visibility
of the pedestrians by the drivers of the approaching vehicles shall be adequate.
The railings shall not have any thick horizontal member, other than the baluster
to achieve the desired objective.
Pedestrian guardrails may be of reinforced cement concrete, iron tubes, steel
channeled sections and pipes, or steel sections appropriate for the environment.
Refer to IRC:103.
136 IRC:SP:73-2007
ROADSIDE FURNITURE
11.5.1 Overhead road signs shall be provided in lieu of, or as an adjunct to ground signs
where the situation so warrants, for providing warning of hazardous situations, help
in regulating traffic, for proper information and guidance of the road users. The
following conditions may be considered while deciding about the provision of
overhead signs:
11.5.2 The overhead signs shall be reflectorized type, with high intensity retro-reflective
sheeting preferably of encapsulated lens type.
11.5.3 Design, location, application, height, vertical and lateral clearances of overhead road
signs shall be as specified in Section 800 of MOSRTH Specifications.
11.5.4 Materials for overhead signs support structure and installation shall be in accordance
with Section 802 of MOSRTH Specifications.
11.5.5 Location and size of overhead traffic signs shall be specified in Schedule-B of the
Concession Agreement.
11.6.1 These are protective systems which prevent errant vehicles from impacting fixed
objects like the following:
11.6.2 In case of two-lane highway, they may be provided where Guard Rail is not
appropriate. Necessary safety devices like an assembly of old tyres or steel drums
filled with sand can be adopted at suitable location.
pc/coi 137
MANUAL OF SPECIFICATIONS AND STANDARDS
11.7.1 They provide visual assistance to drivers about the road ahead especially at night.
These include pavement markings and post type delineators.
(i) Roadway Indicators - They shall be provided to delineate the edges of the
roadway so as to guide drivers about the alignment and particularly, where it
might be confusing to drivers.
(ii) Hazard Markers - They shall be used to define obstructions like guardrails and
abutments adjacent to the carriageway and bridges which are narrower than the
roadway width.
(iii) Object Markers - They shall be provided to indicate hazards and obstructions
within the vehicle flow path like channelizing islands close to the intersections.
11.7.3 Delineator by pavement markings shall be provided as per IRC:35. Guidepost side
delineators shall be provided as per IRC:79 and Section 800 of MOSRTH
Specifications.
138 IRC:SP:73-2007
Section 12
Landscaping and
Tree Plantation
SECTION 12
12.1 General
The Concessionaire shall plant trees and shrubs of required number and type at the
appropriate locations within the Right of Way and in the land earmarked by the
Government for afforestation. The Government shall specify the number of trees
which are required to be planted by the Concessionaire as compensatory afforestation.
The Concessionaire shall also maintain the trees and shrubs in good condition during
the Operation Period as per the maintenance schedule. The guidelines given in this
Section shall be followed in plantation of trees and shrubs.
Trees on the roadside shall be sufficiently away from the roadway so that they are
not a hazard to road traffic or restrict the visibility. Most vulnerable locations in this
regard are the inside of curves, junction corners and cut slopes. Trees shall be placed
at a minimum distance of 10-12 m from the centre line of the extreme traffic lane,
to provide recovery area for the vehicle that runs off the road. A second row of trees
6 m further away will also be desirable and planted, wherever possible. Preferably,
the first row of trees shall consist of species with thick shade and other rows of vertical
growth type providing thin shade. Expansion of the Project Highway to 4-lanes shall
be taken into consideration while locating the trees so that land is free of trees when
widening takes place. The distances for alternative rows of trees shall be reckoned
from the nearest edge of the pavement. No plantation shall be allowed on the
embankment slopes.
In plain terrain, a stopping sight distance of 180 m corresponding to the design speed
of 100 km per hour shall be ensured on all curved sections of state highways along
the innermost lane. However, where there are site restrictions, their requirement may
be reduced to 120 m corresponding to the design speed of 80 km per hour as a special
case. The existing trees and vegetation on the sides have to be suitably thinned/
trimmed or even removed, if necessary, and a regular programme of pruning of the
offending trees shall be undertaken as part of the maintenance operations.
pc/coi 141
MANUAL OF SPECIFICATIONS AND STANDARDS
In the urban section of the Project Highway, trees can be planted on the raised
footpaths, provided the distance between the edge of kerb and the nearest edge of
tree is not less than 2 m.
In all cases, location of trees shall be checked to ensure that to the motorists, clear
visibility of all highway signs/signals is available at all times. Also, the foliage or
trees shall not come in the way of roadway lighting.
For safe traffic operation, the vertical clearance available across the roadway shall
be minimum 5 m. From this angle, the probable size of all plants shall be anticipated
in advance, at the time of initial planting.
To allow for the effects of growth, wind and rain, trees shall be trimmed to 6 m and
6.5 m above the pavement in rural and urban areas respectively.
The spacing of avenue trees will depend on the type and growth characteristics of
trees, requirement of maintenance, penetration of distant views, etc. A range of
10-15 m would meet the requirement for most varieties.
The following guidelines shall be kept in view while selecting the species of trees
to be planted:
(i) Trees shall be selected with due regard to soil, rainfall, temperature and water
level.
(ii) Trees which become very wide shall be avoided as their maintenance would
cause interference with traffic flow.
(iii) The species must be capable of developing a straight and clean bole upto a
height of 2.5 to 3.5 m from the ground level.
(iv) The selected trees shall, preferably, be fast growing and wind-firm. These shall
not be thorny or drop too many leaves.
(v) The trees shall be deep rooted as shallow roots injure pavements.
142 IRC:SP:73-2007
LANDSCAPING AND TREE PLANTATION
(vi) In urban areas, the species selected shall be of less spreading type, so that these
do not interfere with overhead services, clear view of signs and efficiency of
roadway lighting.
The Concessionaire shall submit scheme for plantation and maintenance of plants and
trees to the Independent Engineer for review and comments, if any.
pc/coi 143
Section 13
Project Facilities
SECTION 13
PROJECT FACILITIES
13.1 General
(i) The sidewalks shall be provided in the built-up sections, on both sides, by
barrier type (non-mountable) kerbs of height 200 mm above the adjacent road
surface.
(ii) The width of sidewalks depends upon the expected pedestrian flow and shall
be fixed subject to land availability, but shall not be less than 1.5 m.
pc/coi 147
MANUAL OF SPECIFICATIONS AND STANDARDS
(ii) Zebra Crossing: A Zebra Crossing shall not be sited within 150 m of another
such crossing. The Zebra Crossing shall be somewhat set back from the
carriageway line. However, the set back distance shall not be so much as to
cause an appreciable increase in walking distance for the pedestrians. Pedestrian
guardrails may be necessary where the setback distance is appreciable or at the
skew crossings.
The width of the Zebra Crossing shall be adequate and shall generally lie within
a range of 2.0 m to 4.0 m. The crossing shall, as far as possible, proceed
uninterrupted through the median strip. In the event of the median strip being
used as pedestrian refuge, adequate width of median shall be provided. In case
of raised medians, such portion could be suitably depressed with kerb height
not exceeding 150 mm.
13.3.1 General
(i) The Concessionaire shall provide lighting at specified locations of the Project
148 IRC:SP:73-2007
PROJECT FACILITIES
Highway, using appropriate system and source of electric power as per the
requirements of this Section.
(ii) The Concessionaire shall make suitable arrangements for procuring Power
Supply to ensure uninterrupted lighting during night and when visibility is low,
including provision of DG sets as standby arrangements.
(iii) The Concessionaire shall bear all costs of procurement, installation, running and
operation cost of all lighting, including cost of energy consumption specified
in this Section.
13.3.2 Specifications
(i) Unless stated otherwise elsewhere in this Manual, the minimum average level
of illumination on the stretches of Project Highway including Toll Plazas, truck
lay-byes, bus bays, etc shall be 30 Lux.
(ii) The layout of the lighting system together with type of luminaries for different
locations shall be prepared by the Concessionaire in such a manner that the
minimum illumination level prescribed in para 13.3.2(i) can be achieved and
shall be submitted to the Independent Engineer for review and comments, if
any.
(iii) Overhead electrical power and telecommunication lines erected within the ROW
by the Concessionaire shall be provided with adequate clearance so that safe
use of the highway is not affected.
(iv) Vertical and horizontal clearances for electrical installations shall conform to
IRC:32.
(v) All the fixtures, wires/cables, lights shall conform to relevant BIS specifications
as a minimum. The Concessionaire, may, with the prior review and comments,
if any, of the Independent Engineer use fixtures with better specifications.
pc/coi 149
MANUAL OF SPECIFICATIONS AND STANDARDS
13.4.1 General
The Concessionaire shall construct and maintain adequate number and size of truck
lay-byes for parking of trucks by the side of the Project Highway as indicated by
the Government. The guidelines, as given here, shall be followed in regard to location,
size and facilities to be provided at the truck lay-byes.
Truck lay-byes shall, in general, be located near check barriers, interstate borders,
places of conventional stops of the truck operators, etc. The places be identified on
the basis of field survey and shall have adequate space for facilities as specified in
subsequent para 13.4.3 and future growth.
13.4.3 Facilities
13.4.4 Lighting
The truck lay-byes and 50 m length of the Project Highway on its either side shall
be illuminated at night to provide an average illumination of 30 Lux. Suitably designed
electric poles having aesthetic appeal and energy saving bulbs may be used to provide
required illumination. Alternatively, photo voltaic lamps may be used.
13.5.1 General
The buses shall be allowed to stop for dropping and picking up passengers only at
the bus bays. The Government shall indicate in Schedule-C of the Concession
Agreement, the number and broad location of bus bays to be provided by the
Concessionaire. The bus bays shall conform to the specifications and standards given
in this Section. In cases where bus stands are provided by the concerned State
Government Transport Authorities, the Concessionaire shall provide only access road
within the right of way.
150 IRC:SP:73-2007
PROJECT FACILITIES
13.5.2 Location
The location of the bus bays shall be fixed on the basis of following principles:
(i) The bus stops shall be sited away from bridges and other important structures
and embankment sections more than 3 m high.
(ii) As far as possible, bus bays shall not be located on horizontal curves or at the
summit of vertical curves.
(iii) The location shall have good visibility, not less than the safe stopping sight
distance.
(iv) The bus bays shall not be located too close to the road intersections. A gap
of 300 m from the tangent point of intersections to start/end of the bus bay
shall be desirable. At minor intersections (e.g. junctions with village roads),
distance of 60 m may be adopted. However, if a substantial volume of buses
is to turn right at the intersection, it is necessary that the bus bay shall be located
sufficiently ahead of the intersection so that the buses can be manoeuvred easily
from the pick-up stop on the left hand side to the extreme right lane for turning.
The location of the bus bays may be fixed after due consultation with the local
communities expected to use such facilities.
(vi) In hilly areas, the bus bays shall be located, preferably, where the road is straight
on both sides, gradients are flat and the visibility is reasonably good (usually
not less than 50 m). Subject to these requirements, it will be advisable to choose
locations where it is possible to widen the roadway economically for
accommodating bus bays.
(i) For plain area, typical layouts of bus bays given in Fig. 13.2 shall be adopted.
The length "L" shown in Fig. 13.2 shall be 15 m, which shall be increased in
multiples of 15 m if more than one bus is likely to halt at the bus bay at one
time.
(ii) For hilly areas, where there is a general constraint on space, the layout indicated
in Fig. 13.3 may be adopted.
pc/coi 151
MANUAL OF SPECIFICATIONS AND STANDARDS
(iii) Bus bays shall be provided on both sides of the Project Highway for each
direction of travel independently, so that the buses do not have to cut across
the road. Bus bays on opposite sides shall be staggered to a certain extent to
avoid undue congestion on the highway. At intersections, the bus bays for up
and down direction shall be located on farther sides of the intersection.
(iv) The bus bay shall be provided with a shelter for passengers. The shelter shall
be structurally safe and aesthetic in appearance, while also being functional so
as to protect the waiting passengers adequately from sun, wind and rain. If the
shelter is constructed on the hillside, slopes shall be properly dressed and
suitably protected to avoid slips. The shelter shall be set back from the kerb
line by at least 500 mm.
13.5.4 Pavement
The pavement in the bus bays shall have adequate crust with respect to the wheel
loads expected. Also, the surfacing shall be strong enough to withstand forces due
to frequent braking and acceleration by the buses. The colour and texture of the bus
bay surfacing shall be preferably distinctive from that of the main carriageway.
13.5.5 Drainage
(i) The bus bays shall have proper cross slope to drain off the excess water. No
water, which is likely to splash on the waiting passengers, shall be allowed to
collect near the bus shelters.
(ii) Suitable kerb gutter section with requisite longitudinal slope and outlets at
intervals to ensure quick disposal of water shall be provided.
Pavement markings with thermoplastic paint having glass beads shall be provided at
the bus stops as shown in Figs. 13.2 and 13.3 with the word 'BUS' written prominently
on the pavement. Pedestrian crossings shall be marked slightly behind the standing
position of the buses in order to reduce pedestrian conflicts. The kerbs shall be marked
with continuous yellow line to indicate "No Parking".
Facility for cattle crossings shall be provided as specified in para 2.14.3 of this
Manual.
152 IRC:SP:73-2007
PROJECT FACILITIES
Traffic Aid Posts shall be established at Toll Plaza locations in accordance with the
provisions of the Concession Agreement.
Medical Aid Posts shall be established at Toll Plaza locations in accordance with the
provisions of the Concession Agreement.
pc/coi 153
MANUAL OF SPECIFICATIONS AND STANDARDS
Railing
Pedestrian
crossing sign
Pedestrian
crossing sign
Stop
Stop
Railing
Pedestrian
crossing sign
Pedestrian
crossing sign
Railing
154 IRC:SP:73-2007
pc/coi
20 L* 10
100 mm wide white dotted lines
Pedestrian
Passenger 600 mm long at 600 mm intervals
Raised footpath in extension of left edge
crossing sign
shelter Min.
15 80 40 20
Ramp Flush paved shoulder
Shoulder
Carriageway
Shoulder Flush paved Pedestrian crossing Shoulder
shoulder 80
100 mm wide barrier 60 15 L* 30
line painted yellow
Note:
All dimensions are in metres
except as shown otherwise.
155
156
Natural
ground
22 15 22 Hill side
Pedestrian
Passenger 100 mm wide white dotted lines 0.6 Slope to suit the
crossing sign
shelter 600 mm long at 600 mm intervals Parapet Shed material met at site
R=30m
R=30 m
A Raised in extension of left edge
Ramp
vide IRC:67-2001
Shoulder 15 m footpath Shoulder Drain
0.6
7 5 1.5 Drain
Carriageway
MANUAL OF SPECIFICATIONS AND STANDARDS
R=30
R=30
Section through road on A-B
100 mm wide barrier
line painted yellow
Plan
Pedestrian
crossing sign
vide IRC:67-2001
Note:
All dimensions are in metres
except as shown otherwise.
IRC:SP:73-2007
Section 14
14.1 General
14.1.1 The Concessionaire shall pay due attention to geo-technical, environmental and social
aspects of hill roads and take appropriate measures to ensure the following: (The
guidelines given in IRC:SP: 48 may be referred to, for details).
(i) Stability against geological disturbances.
(ii) Prevention of soil erosion.
(iii) Provision of efficient drainage and preservation of natural drainage system.
14.1.2 If there are any landslide prone areas along the road alignment, adequate investigation
shall be undertaken and appropriate remedial measures shall be provided as per
guidelines given in IRC:SP: 48.
14.1.3 Where any new construction/realignment is involved, the alignment shall avoid large
scale cuttings and fillings and follow the profile of land, as far as possible.
14.1.4 Unstable hill slopes shall be adequately addressed by providing appropriate bio-
engineering and stabilization measures.
14.1.5 Necessary safeguard shall be taken to protect ecology sensitive areas like wild life
and bird sanctuaries, reserve forests, national parks, etc.
14.1.6 Provision of protective structures for traffic such as parapets, railings, roadside safety
barriers, boulder nets, etc. shall be provided, where necessary.
Requisite sight distance should be available across the inside of horizontal curves.
Lack of visibility in the lateral direction may arise due to obstructions like walls, cut-
slopes, wooded areas, etc. Set back distance from the central line of the carriageway,
within which the offending obstructions should be cleared to ensure the needed
visibility, can be determined using the Equation given in IRC:52.
pc/coi 159
MANUAL OF SPECIFICATIONS AND STANDARDS
At horizontal curves, the gradient shall be eased by applying the grade compensation
correction for gradients steeper than 4% in accordance with IRC:52.
Hairpin bends, where unavoidable, may be designed either as a circular curve with
transition curves at each end or as a compound circular curve.
Design criteria given in IRC:52 shall be adopted for the design of hairpin bends. At
hairpin bends the full roadway width should be surfaced.
Proper signing and road markings shall be provided to ensure that the absolute right
of way for climbing vehicles is available.
14.6 Heavy rock blasting should be avoided. Controlled blasting shall be resorted to.
Blasting shall be supervised by experienced personnel. Blasting and related operations
shall be carried out in accordance with Clause 302 of MOSRTH Specifications.
14.7 Cut slopes shall be rendered stable in the construction stage itself, by cutting at the
correct angle and benching etc. including slope stabilizing structures like drains,
breast walls, pitching, etc.
14.8 Where it is necessary to cross hills or high ridges, the various alternatives including
construction of tunnel to avoid deep cuts shall be considered and the most preferred
alternative shall be chosen. The alternative to be followed shall be indicated by the
Government in Schedule-B of the Concession Agreement. Where road is to be taken
through tunnel, its salient details shall be indicated in Schedule-B of the Concession
Agreement.
14.9 For drainage of water from roadside, an effective system of drainage shall be
constructed to lead the run-off to natural water courses. In particular, catch water
160 IRC:SP:73-2007
SPECIAL REQUIREMENTS FOR HILL ROADS
drains (Refer to para 6.5 of this Manual) shall be provided above the cut slopes. It
shall be ensured that water is not drained into villages and cultivated land. Location
of cross drains and culverts should be so chosen as to avoid erosion of the outlet.
Erosion control works like drop walls, apron at out-fall points along with pitching/
paving of the channel shall be provided where required.
(iii) To arrest damage caused to the valley side and the road, by under cutting by
a stream or other water course,
(v) At places where the valley side gets saturated in the monsoons and is likely
to result in slips and damage to the road,
14.10.2 For general features, arrangement and design, guidelines given in IRC:SP: 48 may
be referred to.
14.11 Construction of apron, pitching, flooring shall conform to Clauses 2503 to 2507 of
MOSRTH Specifications.
14.12 Disposal sites shall be identified for disposal of waste, debris, etc. Tipping of waste
into valley sides, stream channels, water bodies, and forest areas shall not be resorted
to.
pc/coi 161
Appendices
APPENDIX-1
(Reference Para 1.12)
Section 1 1.14 (i), (ii), (iii) Two laning or Two laning Plus option
Section 2 2.1 (ii) (a) Requirement of 4 laning in stretches passing through
built up areas, and such stretches.
2.1 (ii) (b) Construction of bypass, alignment and land for the
bypass.
2.1 (v) Land for geometric improvements, and such stretches
2.2.3 Land for geometric improvements and such stretches for
ruling design speed
2.3 Right of way
2.5.2 (i) Provision of foot paths in built up sections
2.6.1 Width of Roadway if different from that given in Para
2.6.1
2.13.1 Provision of Service Roads and Stretches
2.14.1 Location and other features of grade separated structures
2.14.2 Type of Structures for Vehicular under/over passes
2.14.3 (i) Location of Cattle and Pedestrian Underpasses/ overpasses
Section 3 3.1 and 3.2 Type of Intersection and land for intersection
3.3.1 (ii) Location and other features of grade separated
intersections without ramps.
3.3.3 Length of viaduct at grade separated structures
3.4.1 (iii) Location and other features of interchanges
3.4.5 Length of viaduct at grade separated structures (Inter
changes with ramps)
Section 4 4.2.2 (i) Sections of existing road to be raised
Section 5 5.1.2 Requirement of CC Pavement, and design and
maintenance requirements
pc/coi 165
MANUAL OF SPECIFICATIONS AND STANDARDS
166 IRC:SP:73-2007
APPENDIX-2
APPENDIX-2
(Reference Para 1.5)
1. ROADS
pc/coi 167
MANUAL OF SPECIFICATIONS AND STANDARDS
168 IRC:SP:73-2007
APPENDIX-2
pc/coi 169
MANUAL OF SPECIFICATIONS AND STANDARDS
6. IRC:63-1976 Tentative Guidelines for the Use of Low Grade Aggregates and
Soil Aggregates Mixtures in Road Pavement Construction
7. IRC:74-1979 Tentative Guidelines for Lean-Cement Concrete and Lean-
Cement Flyash Concrete as a Pavement Base or Sub-Base
8. IRC:88-1984 Recommended Practice for Lime Flyash Stabilised Soil Base/
Sub-Base in Pavement Construction
9. IRC:109-1997 Guidelines for Wet Mix Macadam
10. IRC:SP:59-2002 Guidelines for Use of Geotextiles in Road Pavements and
Associated Works
170 IRC:SP:73-2007
APPENDIX-2
pc/coi 171
MANUAL OF SPECIFICATIONS AND STANDARDS
11. IRC:SP:62-2004 Guidelines for the Design and Construction of Cement Concrete
Pavement for Rural Roads
12. IRC:SP:63-2004 Guidelines for the Use of Interlocking Concrete Block Pavement
13. IRC:SP-68-2005 Guidelines for Construction of Roller Compacted Concrete
Pavements
172 IRC:SP:73-2007
APPENDIX-2
2. BRIDGES
pc/coi 173
MANUAL OF SPECIFICATIONS AND STANDARDS
174 IRC:SP:73-2007
APPENDIX-2
3. MOSRTH Publications
1. MOSRTH Specifications for Road and Bridge Works, 2001 (Fourth Revision)
2. MOSRTH Standard Plans for Single, Double and Triple Cell Box Culverts with and
without Earth cushion
3. MOSRTH Type Designs for Intersections on National Highways.1992
4. Manual for Safety in Road Design
pc/coi 175