Design Checklist Interconnection Diagram: Document No.: Originated BY: Date

This document is a design checklist for an interconnection diagram project. It contains 18 items that are to be checked, including ensuring all equipment vendor drawings are referenced, wiring is checked against schematics and equipment drawings, terminal blocks have adequate spare capacity, instrument and power cables are separated, and spelling and fonts are consistent. The checklist is to be used during both preliminary and detailed engineering phases.

Uploaded by

freij
Copyright
© © All Rights Reserved
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
Download as docx, pdf, or txt
0% found this document useful (0 votes)
157 views4 pages

Design Checklist Interconnection Diagram: Document No.: Originated BY: Date

This document is a design checklist for an interconnection diagram project. It contains 18 items that are to be checked, including ensuring all equipment vendor drawings are referenced, wiring is checked against schematics and equipment drawings, terminal blocks have adequate spare capacity, instrument and power cables are separated, and spelling and fonts are consistent. The checklist is to be used during both preliminary and detailed engineering phases.

Uploaded by

freij
Copyright
© © All Rights Reserved
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
Download as docx, pdf, or txt
Download as docx, pdf, or txt
You are on page 1/ 4

PROJECT TITLE: DESIGN CHECKLIST

 
PROJECT NO.: Interconnection Diagram

         
DOCUMENT NO.: ORIGINATED
  DATE:  
BY:
         
REVISION NO.: CHECKED BY:   DATE:  
                     
                     
    Preliminary Engineering  
   
    Detailed Engineering  
                     
ITEM    
NO. ITEMS TO BE CHECKED Checked COMMENTS
               
1 Title Block / Revision Number/ Drawing
         
Number
               
2 Presentation as per Typical Standard/ Symbols      
               
3 All equipment vendor reference drawings are identified in the      
reference column
               
4 Checked against single line diagram / MCC Schedule, Cable
     
schedule and Control Drawings
               
5 Wiring checked against equipment vendor drawing      
               
6 Wiring checked against schematics          
               
7 Terminal blocks have adequate spare
         
capacity
               
8 Instrument cable shields are grounded at one
         
end only
               
9 Instrument signal wires are not mixed with
         
power cables
               
10 Spare wires are clearly identified          
               
11 Equipment and terminal numbers          
               
12 Cable size and numbers          
               
13 Instrument wiring and termination          
                     
14 Thermocouple wiring and termination              
                     
15 Wire numbers and / or color where
             
applicable
                     
16 Junction box numbers              
                   
17 Line types and weights ( Bus, Cables)              
                   
18 Spelling & Font types          
PROJECT TITLE: DESIGN CHECKLIST
PROJECT NO.: SLD  

         
DOCUMENT NO.: ORIGINATED
  DATE:  
BY:
         
REVISION NO.: CHECKED BY:   DATE:  
                     
                     
    Preliminary Engineering  
   
    Detailed Engineering  
                     
ITEM    
NO. ITEMS TO BE CHECKED Checked COMMENTS
               
1 Title Block / Revision Number/ Drawing
         
Number
               
2 Presentation as per Typical Standard / Symbols      
               
3 Incoming Power Source, Voltage          
               
4 Equipment Tag numbers Correct          
               
5 Bus ratings/ Bus numbers/ Short circuit
         
ratings
               
6 Transfomer(s) Ratings, Connection
         
Symbols, Grounding
               
7 Protective devices / meetering          
               
8 breaker ratings - Loading          
               
9 Current and potential transformers (ratio,
         
accuracy)
               
10 Interlocks (Electrical & Mechanical)          
               
11 Special Motor Symbols (DC/ Synchronous/ Wound Rotor )      
               
12 Switchgear Incoming/Load Cables Sizes /
         
Ratings
               
13 Lightning & Surge Arrestors shown where
         
needed
                     
14 Redundancy / Flexibility / Safety              
                     
15 General Notes              
                     
16 Reference drawings              
                   
17 Line types and weights ( Bus, Cables)              
                   
18 Spelling & Font types          

PROJECT TITLE: DESIGN CHECKLIST


 
PROJECT NO.: Electrical Room
Equipment Layout
         
DOCUMENT NO.: ORIGINATED
  DATE:  
BY:
       
 
REVISION NO.: CHECKED
  DATE:  
BY:
                     
                     
    Preliminary Engineering  
   
    Detailed Engineering  
                     
ITEM    
NO. ITEMS TO BE CHECKED Checked COMMENTS
               
1 Title Block / Revision Number/ Drawing
         
Number
               
2 Layout Presentation as per Typical Standard/
         
Symbols
               
3 Latest revision plot plan used for background          
               
4 Equipment dimensions per vendor drawings          
               
5 Equipment position dimensions from grid line          
               
6 Equipment tag numbers correct          
               
7 Equipment Access ( Front and Back as
         
required )
               
8 Equipment Installation / Removal          
               
11 Cross check with Tray Layouts          
               
12 Buried Conduits properly dimensioned for
         
bottom access
               
13 Section and detail cross reference          
               
14 Key plan/ North arrow / Scale          
               
15 Reference drawings          
                     
16 Background line work / Line types and
             
weights
                     
17 General Notes              
               
18 Spelling & Font types          

PROJECT TITLE: DESIGN CHECKLIST


 
PROJECT NO.: CABLE TRAY LAYOUTS
         
DOCUMENT NO.: ORIGINATED BY:   DATE:  
         
REVISION NO.: CHECKED BY:   DATE:  
                     
                     
    Preliminary Engineering  
   
    Detailed Engineering  
                     
ITEM    
Checked
NO. ITEMS TO BE CHECKED COMMENTS
               
1 Title Block / Revision Number/
         
Drawing Number/Page Number
               
2 Layout Presentation as per Typical
         
Standard/ Symbols
               
3 Latest revision plot plan used for
         
background
               
4 Critical Dimensions for tray location
         
from grid lines
               
5 Minimum 12" (300mm ) vertical
         
space between the trays
               
6 Trays are paralell to grid lines          
               
7 Tray bending radius suitable for
         
largest diameter cable
               
8 Adequate clearances provided from
         
floor
               
9 Clash check is done for this layout          
               
10 Standard tray supports are possible
         
by structural steel
               
11 All Cables exiting electrical rooms are
         
identified
               
12
Separate trays/Bariers provided for MV, LV and Control cables      
               
13 Cross checked trays going between
         
floors/walls
               
14 Key plan/ North arrow / Scale          
               
15 Reference drawings          
               
16 Background line work / Line types
         
and weights
               
17 General Notes          
               
18 Spelling & Font types          