Dpg-0031/Cw-Ls-07-Landscape Works For Pa11: Method Statement Log

This document contains a log of 10 method statements that have been submitted and reviewed for landscape works for PA11. It provides details on the method statement number, title, submission and return dates for the initial submission and up to two revisions. It also includes a table that shows the progress of preparing and submitting method statements for various project works, including electrical, street lighting, road crossing duct and road works, with percentages indicating the portion completed.

Uploaded by

imran sikander
Copyright
© © All Rights Reserved
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
Download as xlsx, pdf, or txt
0% found this document useful (0 votes)
69 views3 pages

Dpg-0031/Cw-Ls-07-Landscape Works For Pa11: Method Statement Log

This document contains a log of 10 method statements that have been submitted and reviewed for landscape works for PA11. It provides details on the method statement number, title, submission and return dates for the initial submission and up to two revisions. It also includes a table that shows the progress of preparing and submitting method statements for various project works, including electrical, street lighting, road crossing duct and road works, with percentages indicating the portion completed.

Uploaded by

imran sikander
Copyright
© © All Rights Reserved
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
Download as xlsx, pdf, or txt
Download as xlsx, pdf, or txt
You are on page 1/ 3

DPG-0031/CW-LS-07-LANDSCAPE WORKS FOR PA11 Code Description Total No.

A Approved 0
AN Approved as Noted 10
UR Under Review 0
RR Revised Resubmit 0
R Rejected 0
Total 10
METHOD STATEMENT LOG
Date of (Rev-0) Date of (Rev-1) Date of (Rev-2)
S.No. MS NO. Title Status
Submission Return Submission Return Submission Return
1 DPG-0031-PA11-ZAH-MSS-0001 Method Statement for Swimming pool (Civil Works) 1-Sep-20 9-Sep-20 10-Nov-20 23-Nov-20 AN

2 DPG-0031-PA11-ZAH-MSS-0002 Method Statement for Swimming pool (MEP Works) 1-Sep-20 4-Oct-20 AN

3 DPG-0031-PA11-ZAH-MSS-0004 Method Statement for Automatic Irrigation System 13-Oct-20 15-Nov-20 AN

4 DPG-0031-PA11-ZAH-MSS-0005 Method Statement for Hardscape works 13-Oct-20 14-Nov-20 AN

5 DPG-0031-PA11-ZAH-MSS-0006 Method Statement for Soft Scape works 13-Oct-20 14-Nov-20 AN

6 DPG-0031-PA11-ZAH-MSS-0007 Method Statement for Play Equipment and Fitness Equipment Installation 15-Oct-20 15-Nov-20 AN

7 DPG-0031-PA11-ZAH-MSS-0008 Method Statement for Supplly and Installation of Rubber Flooring 15-Oct-20 15-Nov-20 AN

8 DPG-0031-PA11-ZAH-MSS-0009 Method Statement for Street Furniture 15-Oct-20 15-Nov-20 AN

Method Statement for Fabrication, Supply and Installation of Shade


9 DPG-0031-PA11-ZAH-MSS-0010 15-Oct-20 15-Nov-20 AN
Structure

10 DPG-0031-PA11-ZAH-MSS-0011 Method Statement for Supply and Installation of Chain Link Fence 15-Oct-20 14-Nov-20 AN

Page 1 of 3
Balance Method Statement Plan %
Prepare & Submit Method statements - Etisalat/DU Works 100%

Prepare & Submit Method statements - Security Network 100%

Prepare & Submit Method statements - Electrical Works 100%

Prepare & Submit Method statements - Street Lighting Works 0%

Prepare & Submit Method statements - Road Crossing duct Works 0%

Prepare & Submit Method statements - Road Works 10.71%


BL Project Start BL Project Finish
23-Jul-18 27-Aug-18

31-Jul-18 4-Sep-18

5-Sep-18 8-Oct-18

16-Dec-18 17-Jan-19

11-Nov-18 15-Dec-18

9-Oct-18 10-Nov-18