Generator Protection Realy Test Form
Generator Protection Realy Test Form
Make/ Type Model No. Sr. No. Control Supply Relay Rating
2.0 Measurements :
Phase CT Ratio : Neutral CT Ratio : VT Ratio :
Phase Side Neutral Side
Measured Injected Current
Injected Voltage Primary Primary
Voltage (Phase & Neutral side)
(V) Current Current
(KV) (A)
(KA) (KA)
Id =
Ires. =
Id / Ires =
Id =
Ires. =
Id / Ires =
Page: 2 of 6
Injected Current Injected Current Differential Restraint
Phase Relay Status
Side-1 Side-2 Current Current
R
Id =
Ires. =
Id / Ires. =
Page: 3 of 6
Iset = , TMS = , Curve =
Injected Current Calculating time Operating Time
Phase (A) (sec) (sec)
2x 5x 10x 2x 5x 10x 2x 5x 10x
8.0 SEF-B :
Set Current Injected Current Applied Set time Operating
Phase
Iee-b (A) (A) Voltage (V) (sec) Time (sec)
Page: 4 of 6
Set Voltage Injected Voltage Set time Operating Time
Phase
(V) (V) (sec) (sec)
Page: 5 of 6
Set Frequency Injected Set time Operating Time
Phase
(Hz) Frequency (Hz) (sec) (sec)
Page: 6 of 6