In-Take Foundation Plan A
In-Take Foundation Plan A
A. BORED PILE :
5'
B. CONSTRUCTION & INSPECTION :
TOP OF F-1
5
4'
TOP OF F-2
H J
TOP OF F-3
4
TOP OF F-1
A B C D E F G
A A
A IN-TAKE FOUNDATION PLAN
TYPICAL SECTION
EQUIPMENT PAD SIZES
1 PEDESTAL AND TIE BEAM DETAILS 2 EQUIPMENT PAD DETAILS 3 BORED PILE DETAILS (BOP-1)
ARCHEN TECHNOLOGIES, INC. instrument of service, are the properties and documents of Architects/Engineers whether the
object for which they are made is executed or not. It shall be unlawful for any person to duplicate
or to make copies of said documents for use in the repetition of and for other projects or buildings, GLICERIA M. PEREZ NEW 60TPH FEED MILL CDO 2 (GREENFIELD) IN-TAKE FOUNDATION PLAN
PEDESTAL AND TIE BEAM DETAILS
AED-SMC19051 S-02 2/28
whether executed partly or in whole, without the written consent of architect or author of said TAGOLOAN, MISAMIS ORIENTAL
EQUIPMENT PAD DETAILS
documents
SAN MIGUEL FOODS, INC. EDUARDO M. MILANA EDDIE I. CAMALIGAN JESUS M. MAGTIRA
BORED PILE DETAILS
"PROPRIETARY INFORMATION"
The information on this document is the property of the author is considered confidential. It cannot
be made public or copied without proper authorization.
INTAKE BUILDING REV_01