Anec 41 Soja
Anec 41 Soja
41 BRAZILIAN SOYBEANS
F.O.B. CONTRACT FOR PARCELS
SELLER:..............................................................................……................................................................................................................... 1
BUYER:.......................................................................................................................................................................................................... 2
BROKER:.....................................................……........................................................................................................................................... 3
4
1.QUANTITY:........................................(....................………......................................................................................................................... 5
...............……...................................) metric tons of 1,000 kilograms each, exact quantity. Shipment per one or more vessels. The Seller 6
bears all costs, risks of loss and damage to the goods until they have passed ship’s rail at the port of shipment, when all costs, risks of 7
loss and damage to the goods are immediately transferred to the Buyer. 8
9
2. GOODS: Brazilian soybeans, crop.......................................................................................................................................................... 10
11
3. QUALITY / CONDITION: To be final at time and place of shipment per certificate(s) covering and limited to the items below, based on 12
a general representative composite sample taken according to method laid down in FOSFA Standard Contracts method list and issued 13
by a member superintendent of FOSFA. Cost and choice are on Seller’s account. 14
15
3.1 Laboratory analysis by a FOSFA Analyst Member: 16
- Oil content: basis 18.5% (AOCS Ac 3 – 44) with non-reciprocal allowance of 1% discount for each 1% deficiency, fractions in proportion, 17
in Buyer’s favour for any deficiency; 18
- Moisture: maximum 14% (AOCS Ac 2 - 41). 19
20
3.2 Grading by a Superintendent or Analyst Member of FOSFA registered at Brazilian Ministry of Agriculture: 21
- Foreign matter: basis 1%, maximum 2% with non-reciprocal allowance of 1% discount for each 1% deficiency, fractions in proportion; 22
- Damaged beans: basis 8%, maximum 8.5% with non-reciprocal allowance of 2% discount for each 1% deficiency, fractions in proportion, 23
of which maximum 4% heat damaged and burned (maximum being 1% burned) and 6% mouldy; 24
- Broken beans: maximum 30%; 25
- Greenish beans: maximum 8%; 26
- Substantially free from poisonous seeds/husks, within tolerances of: 27
1 particle of treated vegetal seeds with unknown level of toxicity for each 1 kg sample at each lot of 5,000 metric tons loaded or part 28
thereof; 29
1 particle of toxic natural vegetal seeds for each 1 kg sample at each lot of 5,000 metric tons loaded or part thereof; 30
max. 0.005% castor seed and/or castor seed husks for general composite sample. 31
32
Grading to be performed according to IN 11/2007 and IN 37/2007 issued by Brazilian Ministry of Agriculture. Any further revision or 33
replacement of these regulations in force at time of loading shall be applied. 34
Other quality/condition in accordance with Brazilian Legislation effective at time and place of shipment. 35
Buyer has the option, at its expense, to appoint a Member Superintendent of FOSFA duly registered as under Brazilian Ministry of 36
Agriculture to perform joint sampling and sealing provided that the Seller be advised, at the latest upon vessel’s berthing, of the name of 37
the Independent Surveyor it is appointing. 38
If the difference in any of the following items between Certificates issued by Buyer’s and Seller’s appointed Surveyors does not exceed 39
the percentages mentioned below, then the results of Surveyors appointed by Seller will be final and binding on the parties. 40
41
- Moisture 0.5%, Damaged Beans 0.5%, Heat Damaged 0.5% and Foreign Matter 0.2%, 42
Greenish beans 0.5%, Burned 0.10% and Mouldy 0.5% 43
44
Otherwise, at request of either party exercised within 45 days from the BL date and at its expense, a third test shall be carried out as per 45
following procedure and the average of the 2 closest analysis results shall be final and binding on the parties under this contract. Any 46
allowances shall be settled by a complementary debit note. 47
The requesting party shall inform the other party about its decision of requesting a 3rd analysis, by submitting a list containing the name 48
of three laboratories and/or surveyors, as the case may be, and the other party shall confirm its agreement to one of these three names 49
within three business days. 50
In case a counterparty fails to respond, requesting party has the right to proceed and appoint any of the three names. 51
- the test shall be performed on a contractual composite (aggregate) sample counter-sealed by Seller’s and Buyer’s appointed Surveyors; 52
- for laboratory analysis, the chosen laboratory shall be an independent Surveyor chosen as mentioned above and recognized as a 53
FOSFA Analyst Member who shall perform the tests following the methodology established on this contract. 54
- For grading analysis, the surveyor chosen as mentioned above shall also be recognized as a FOSFA Analyst Member duly registered 55
under Brazilian Ministry of Agriculture and shall perform the tests following the methodology established on this contract. 56
57
The request of a third test shall not entitle Buyers to refuse or delay the payment of shipping documents in accordance with clause 14. 58
59
4. PACKING: In bulk 60
61
5. DELIVERY PERIOD: Between................................…....................................................., both dates included. Provided the vessel 62
tenders NOR as per Clause 10 and is ready to load within the Delivery Period, Sellers shall, if necessary, complete loading after the 63
delivery period. 64