TASK CARD Date Printed: 02-FEB-2023 07:15 UTC
Page 1 of 2
AIRCRAFT TYPE REGISTRATION S/N WORK PACKAGE # WP DATE LINE #
737-NG HP-1825CMP 40780 TRF7N005K39F 02-FEB-2023 06:31 UTC 2
WORK PACKAGE NAME WORK LOCATION
PLA, MEX-138, SV3+AD CK (01FEB23) MEX/LINE_MEX-01-SV
TASK NAME
JIC Maintenix JIC Revision 10/8/21 10:18 PM
EA 2000-0004C-JIC (STANDARD PRACTICE: P8 PANEL CLEANING (e-DOC)) Revision: 6 Date:
ZONES ACCESS PANELS
211, 212
PARTS ON/OFF
REMOVED INSTALLED
Description
Qty P/N S/N Position Reason Qty P/N S/N
No Parts Required
TOOLS
NAME P/N S/N CHECKED OUT TO
No Tools Required
MEASUREMENTS
PARAMETER VALUE SIGNED_BY
No Measurement Recorded
ACTIONS
DISCREPANCY FOUND
No Additional Faults Found
JOB CARD STEPS
STEP 1 - Pending
NOTE: If kit P/N 3100DA0001C-5 is not installed, check in Maintenix to make sure the kit is already controlled under
an OIL deferral. If the kit is already controlled under
OIL then signoff step 2 as NA and continue with step 3.
If the kit is not installed and is not controlled under OIL and there is not stock availability, open an OIL to install Kit
P/N 3100DA0001C-5 then signoff step 2 as NA and continue with step 3.
CAUTION: Be careful when you are cleaning P8 panel, as you may damage the switches, buttons or knobs.
TASK CARD Date Printed: 02-FEB-2023 07:15 UTC
Page 2 of 2
JOB CARD STEPS
CAUTION:Be careful when you are cleaning P8 panel, as you may damage the switches, buttons or knobs.
SKILL SKILL STATUS WORK PERFORMED CERTIFICATION
MECH Pending
STEP 2 - Pending
Clean the P8 Panel as follows:
"Remove dust, dirt, and foreign matter from the surface with a soft bristle brush
"Wipe to remove any unwanted or Sticky material from the panels
NOTE:To do the above procedure Use Kit P/N3100DA0001C-5, that was placed in maintenance compartment in the
cockpit see figure 2 for illustration, return kit to the maintenance compartment when you finish.
SKILL SKILL STATUS WORK PERFORMED CERTIFICATION
MECH Pending
STEP 3 - Pending
Restore aircraft to normal configuration
SKILL SKILL STATUS WORK PERFORMED CERTIFICATION
MECH Pending
FIGURE 1 – P8 PANEL