This document contains a detailed calculation of construction man-hours needed for various activities such as paving, irrigation, soft landscaping, and electrical works. It lists over 40 construction activities with information on original duration, budgeted labor units, productivity rates, number of days, required resources, and budgeted manpower. The purpose is to estimate the labor required to complete all activities within the planned project duration and budget.
Download as XLSX, PDF, TXT or read online on Scribd
Download as xlsx, pdf, or txt
0 ratings0% found this document useful (0 votes)
118 views1 page
Productivity Rate
This document contains a detailed calculation of construction man-hours needed for various activities such as paving, irrigation, soft landscaping, and electrical works. It lists over 40 construction activities with information on original duration, budgeted labor units, productivity rates, number of days, required resources, and budgeted manpower. The purpose is to estimate the labor required to complete all activities within the planned project duration and budget.