0% found this document useful (0 votes)
34 views4 pages

Target Issuance 30 May 2023

This document provides a list of 50 documents with their target submission dates for the next two weeks as part of the Bambu Merah SP BMH Feed project. The documents include scope of work, site survey reports, piping and instrumentation diagrams, hazard studies, datasheets, plans, calculations, schedules and takeoffs required from various disciplines like project management, process, safety, piping, instrumentation, electrical, civil and mechanical engineering. The majority of documents have a target submission date of May 30th, 2023.

Uploaded by

Achmad Oktafiono
Copyright
© © All Rights Reserved
Available Formats
Download as PDF, TXT or read online on Scribd
Download as pdf or txt
0% found this document useful (0 votes)
34 views4 pages

Target Issuance 30 May 2023

This document provides a list of 50 documents with their target submission dates for the next two weeks as part of the Bambu Merah SP BMH Feed project. The documents include scope of work, site survey reports, piping and instrumentation diagrams, hazard studies, datasheets, plans, calculations, schedules and takeoffs required from various disciplines like project management, process, safety, piping, instrumentation, electrical, civil and mechanical engineering. The majority of documents have a target submission date of May 30th, 2023.

Uploaded by

Achmad Oktafiono
Copyright
© © All Rights Reserved
Available Formats
Download as PDF, TXT or read online on Scribd
Download as pdf or txt
Download as pdf or txt
You are on page 1/ 4

Daftar Dokumen 2 Minggu Kedepan

JOB 289-CTR 022 & CTR 039


PT Pertamina EP ZONA 7
FEED SP Bambu Merah - Pembangunan Fasilitas Baru SP BMH

Target
NO. CTR / Drawing No. Deliverables Action Discipline Remark Weight
Submission

1 BMH-FED-SYN-00-G0-SW-001 Scope Of Work EPC RIFR PMT 30-May-23 0.00%


2 BMH-FED-SYN-00-G0-RE-001 Site Survey Report RIFR PMT 30-May-23 0.00%
3 BMH-FED-SYN-00-P0-PID-002 P&ID Firewater system RIFR PRO 30-May-23 0.00%
4 BMH-FED-SYN-00-P0-PID-003 P&ID Firewater Mainring RIFR PRO 30-May-23 0.00%
5 BMH-FED-SYN-00-P1-CA-005 Hydraulic Calculation (Firewater, Water Spray , Foam) RIFR SAF 30-May-23 0.00%
6 BMH-FED-SYN-00-P1-DW-007 Fire & Gas Detection Layout (Section Plan 1) IFR Outstanding PRO 30-May-23 0.03%
7 BMH-FED-SYN-00-P1-DW-008 Fire & Gas Detection Layout (Section Plan 2) IFR Outstanding PRO 30-May-23 0.03%
8 BMH-FED-SYN-00-P1-RE-002 HAZOP Study Report (SP BMH) IFR 1W SAF 30-May-23 0.01%
9 BMH-FED-SYN-00-P1-RE-003 HAZID Study Report (SP BMH) IFR 1W SAF 30-May-23 0.01%
10 BMH-FED-SYN-00-P1-RE-004 HAZOP Study Report (BS Cilamaya) IFR 1W SAF 30-May-23 0.01%
11 BMH-FED-SYN-00-P1-RE-005 HAZID Study Report (BS Cilamaya) IFR 1W SAF 30-May-23 0.01%
12 BMH-FED-SYN-00-P1-RE-006 HAZOP Study Report (SKG Cilamaya) IFR 1W SAF 30-May-23 0.01%
13 BMH-FED-SYN-00-P1-RE-007 HAZID Study Report (SKG Cilamaya) IFR 1W SAF 30-May-23 0.01%
14 BMH-FED-SYN-00-M0-DS-012 Mechanical Datasheet for Fire Water Pump Package and Jockey Pump RIFR MEC 30-May-23 0.00%
15 BMH-FED-SYN-00-L0-CA-002 Pipe Stress Analysis IFR Outstanding PIP 30-May-23 0.19%
16 BMH-FED-SYN-00-L0-CA-003 Pipeline Stress Analysis (Gas Trunkline) - cesar IFR Outstanding PIP 30-May-23 0.14%
17 BMH-FED-SYN-00-L0-CA-004 Pipeline Stress Analysis (Liquid Trunkline) - cesar IFR Outstanding PIP 30-May-23 0.14%
18 BMH-FED-SYN-00-L0-DW-002 Key Plan Drawing IFR Outstanding PIP 30-May-23 0.14%
19 BMH-FED-SYN-00-L0-DW-003 Piping Plan & Pipe Support Location Drawing - Area 1 IFR Outstanding PIP 30-May-23 0.22%
20 BMH-FED-SYN-00-L0-DW-004 Piping Plan & Pipe Support Location Drawing - Area 2 IFR Outstanding PIP 30-May-23 0.22%
21 BMH-FED-SYN-00-L0-DW-005 Piping Plan & Pipe Support Location Drawing - Area 3 IFR Outstanding PIP 30-May-23 0.22%
22 BMH-FED-SYN-00-L0-DW-006 Piping Plan & Pipe Support Location Drawing - Area 4 IFR Outstanding PIP 30-May-23 0.22%
23 BMH-FED-SYN-00-L0-DW-007 Piping Plan & Pipe Support Location Drawing - Area 5 IFR Outstanding PIP 30-May-23 0.22%
24 BMH-FED-SYN-00-L0-DW-008 Piping Plan & Pipe Support Location Drawing - Area 6 IFR Outstanding PIP 30-May-23 0.22%
25 BMH-FED-SYN-00-L0-MT-001 Material Take Off (MTO) - Manual Valve Piping Bulk & Manual Valve IFR 1W PIP 30-May-23 0.07%
26 BMH-FED-SYN-00-J0-DS-021 Instrument Datasheet Temperature Gauge & Thermowell IFR Outstanding INS 30-May-23 0.02%
27 BMH-FED-SYN-00-J0-DW-001 Instrument Key Plan IFR 1W INS 30-May-23 0.04%
28 BMH-FED-SYN-00-J0-DW-002 Instrument Junction Box, Main Cable & Cable Tray Layout Plan (Overall Plan) IFR 1W INS 30-May-23 0.04%
29 BMH-FED-SYN-00-J0-DW-005 Shutdown Hierarchy - Emergency Shutdown System (2sheet) RIFR INS 30-May-23 0.00%
30 BMH-FED-SYN-00-J0-DW-006 Cause and Effect Diagram - sheet-1 IFR 1W INS 30-May-23 0.05%
31 BMH-FED-SYN-00-J0-DW-007 Cause and Effect Diagram - sheet-2 IFR 1W INS 30-May-23 0.05%
32 BMH-FED-SYN-00-J0-DW-008 Cause and Effect Diagram - sheet-3 IFR 1W INS 30-May-23 0.05%
33 BMH-FED-SYN-00-J0-DW-009 Cause and Effect Diagram - sheet-4 IFR 1W INS 30-May-23 0.05%
34 BMH-FED-SYN-00-J0-DW-010 Cause and Effect Diagram - sheet-5 IFR 1W INS 30-May-23 0.05%
35 BMH-FED-SYN-00-J0-DW-011 Cause and Effect Diagram - sheet-6 IFR 1W INS 30-May-23 0.05%
36 BMH-FED-SYN-00-J0-DW-012 Cause and Effect Diagram - sheet-7 IFR 1W INS 30-May-23 0.05%
37 BMH-FED-SYN-00-J0-MT-001 MTO - Instrument IFR 1W INS 30-May-23 0.08%

30-May-23
38 BMH-FED-SYN-00-E0-SR-001 Load Flow Study IFR Outstanding ELE 0.08%
39 BMH-FED-SYN-00-E0-LS-003 Electrical Power and Control Cable Schedule IFR Outstanding ELE 30-May-23 0.04%
40 BMH-FED-SYN-00-E0-SR-002 Short circuit calculation IFR Outstanding ELE 30-May-23 0.07%
41 BMH-FED-SYN-00-E0-SR-003 Motor Starting Study IFR Outstanding ELE 30-May-23 0.07%
42 BMH-FED-SYN-00-E0-DW-009 Earthing and Lightning Protection Plan IFR Outstanding ELE 30-May-23 0.04%
43 BMH-FED-SYN-00-E0-DW-007 Electrical Power and Control Cable Layout IFR Outstanding ELE 30-May-23 0.04%
44 BMH-FED-SYN-00-E0-MT-001 Electrical Material Take Off (MTO) IFR 1W ELE 30-May-23 0.05%
45 BMH-FED-SYN-00-A0-CA-003 Foundation Calculation for All Compressor Package IFR 1W CIV 30-May-23 0.04%
46 Foundation Calculation for Fuelfor
GasPumps
Scrubber 30-May-23 0.00%
BMH-FED-SYN-00-A0-CA-006 Typical Foundation Calculation (Include : Firewater and Jockey Pump, RIFR CIV
47 BMH-FED-SYN-00-A0-CA-011 All Transfer Pumps, All Drain Pumps, and Service Pumps) IFR Outstanding CIV 30-May-23 0.04%
48 BMH-FED-SYN-00-A0-CA-014 Foundation Calculation for Custody Gas Metering IFR 1W CIV 30-May-23 0.03%
49 BMH-FED-SYN-00-A0-CA-015 Foundation Calculation for Air Compressor Package RIFR CIV 30-May-23 0.00%
50 BMH-FED-SYN-00-A0-CA-017 Foundation Calculation for Flare Tip Package IFR 1W CIV 30-May-23 0.02%
51 BMH-FED-SYN-00-A0-CA-020 Calculation for Firewater Pond IFR Outstanding CIV 30-May-23 0.02%
52 BMH-FED-SYN-00-A0-CA-021 Calculation for Closed Drain Pit IFR Outstanding CIV 30-May-23 0.02%
53 BMH-FED-SYN-00-A0-CA-022 Foundation Calculation for K.O Drum RIFR CIV 30-May-23 0.00%
54 BMH-FED-SYN-00-A0-CA-023 Structures and Foundation Calculation for Control Room and MCC Building IFR 1W CIV 30-May-23 0.04%
55 BMH-FED-SYN-00-A0-CA-026 Structures and Foundation Calculation for Firewater Pump Shelter IFR Outstanding CIV 30-May-23 0.04%
56 BMH-FED-SYN-00-A0-CA-027 Foundation Calculation for Flare Stack IFR 1W CIV 30-May-23 0.05%
57 BMH-FED-SYN-00-A0-CA-028 Foundation Calculation for Vent Stack IFR 1W CIV 30-May-23 0.05%
58 BMH-FED-SYN-00-A0-CA-029 Foundation Calculation for Lightning Protection IFR 1W CIV 30-May-23 0.05%
59 BMH-FED-SYN-00-A0-CA-030 Foundation Calculation for Lighting Pole IFR 1W CIV 30-May-23 0.05%
60 BMH-FED-SYN-00-A0-DW-005 Instrument Air Compressor Package Foundation (sheet 1) IFR 1W CIV 30-May-23 0.04%
61 BMH-FED-SYN-00-A0-DW-014 Windshock Foundation (sheet 1) IFR 1W CIV 30-May-23 0.02%
62 BMH-FED-SYN-00-A0-DW-015 Liquid Transfer Pump Foundation (sheet 1) IFR 1W CIV 30-May-23 0.02%
63 BMH-FED-SYN-00-A0-DW-016 Fire Water Pump Package & Jokey Pump Foundation (sheet 1) IFR 1W CIV 30-May-23 0.02%
64 BMH-FED-SYN-00-A0-DW-018 Closed Drain Pumps Foundation (sheet 1) IFR 1W CIV 30-May-23 0.02%
65 BMH-FED-SYN-00-A0-DW-019 Open Drain Pumps Foundation(sheet 1) IFR 1W CIV 30-May-23 0.02%
66 BMH-FED-SYN-00-A0-DW-020 Deep Well Pump Foundation (sheet 1) IFR 1W CIV 30-May-23 0.02%
67 BMH-FED-SYN-00-A0-DW-026 Dehydration Unit (DHU) Package Foundation (sheet 1) RIFR CIV 30-May-23 0.00%
68 BMH-FED-SYN-00-A0-DW-028 Chemical Injection Package Foundation (sheet 1) IFR Outstanding CIV 30-May-23 0.02%
69 BMH-FED-SYN-00-A0-DW-032 K.O Drum Pump
Foundation Plan ( 2 sheet ) Foundation Detail Drawing, Elevation, IFR 1W CIV 30-May-23 0.04%
Firewater Shelter Structure and
70 BMH-FED-SYN-00-A0-DW-046 and Section (sheet 1) IFR 1W CIV 30-May-23 0.04%
71 BMH-FED-SYN-00-A0-DW-047 Firewater Pump Shelter Structure and Foundation Plan, Elevation, and Section IFR 1W CIV 30-May-23 0.04%
Daftar Dokumen 2 Minggu Kedepan
JOB 289-CTR 022 & CTR 039
PT Pertamina EP ZONA 7
FEED SP Bambu Merah - Pembangunan Fasilitas Baru SP BMH

Target
NO. CTR / Drawing No. Deliverables Action Discipline Remark Weight
Submission

72 BMH-FED-SYN-00-A0-DW-058 Fence and Gate Drawing (3 sheet) IFR Outstanding CIV 30-May-23 0.05%
73 BMH-FED-SYN-00-A0-DW-059 Foam tank Foundation (sheet 1) IFR Outstanding CIV 30-May-23 0.02%
74 BMH-FED-SYN-00-A0-DW-061 Rigid Road, Paving and Site Grading Drawing (3 sheet) RIFR CIV 30-May-23 0.00%
75 BSC-FED-SYN-00-G0-RE-001 Site Survey Report RIFR PMT 30-May-23 0.00%
76 BSC-FED-SYN-00-P0-UFD-001 UFD Modification / demolished (1 Sheet) IFR Outstanding PRO 30-May-23 0.03%
77 BSC-FED-SYN-00-L0-LS-001 Tie-In List IFR Outstanding PIP 30-May-23 0.05%
78 BSC-FED-SYN-00-L0-DS-001 Datasheet for Manual Valve IFR Outstanding PIP 30-May-23 0.03%
79 BSC-FED-SYN-00-L0-DS-002 Datasheet for Piping Specialty Item IFR Outstanding PIP 30-May-23 0.04%

80 30-May-23 0.19%
BSC-FED-SYN-00-L0-CA-001 Pipe Stress Analysis (For Tank, Pump) IFR 1W PIP
81 BSC-FED-SYN-00-L0-DW-002 Piping Plan Tank Area IFR Outstanding PIP 30-May-23 0.22%
82 BSC-FED-SYN-00-L0-DW-003 Pipe Support Location Tank Area IFR Outstanding PIP 30-May-23 0.22%
83 BSC-FED-SYN-00-L0-MT-001 Material Take Off (MTO) - Piping Bulk, Pipe Support & Manual Valve IFR 1W PIP 30-May-23 0.07%
84 BSC-FED-SYN-00-J0-DS-003 Instrument Data Sheet Level Transmitter (D/P type) IFR Outstanding INS 30-May-23 0.03%
85 BSC-FED-SYN-00-J0-MT-001 MTO - Instrument IFR 1W INS 30-May-23 0.08%
86 BSC-FED-SYN-00-E0-DW-001 Electrical One Line Diagram IFR Outstanding ELE 30-May-23 0.04%
87 BSC-FED-SYN-00-E0-LS-001 Electrical Power and Control Cable Schedule IFR Outstanding ELE 30-May-23 0.04%
88 BSC-FED-SYN-00-E0-CA-002 Lightning Protecting System Study IFR Outstanding ELE 30-May-23 0.04%
89 BSC-FED-SYN-00-E0-CA-001 Lightning Illumination Calculation IFR Outstanding ELE 30-May-23 0.02%
90 BSC-FED-SYN-00-E0-DW-001 Electrical Cable Routing & Tray Layout IFR Outstanding ELE 30-May-23 0.03%
91 BSC-FED-SYN-00-E0-DW-002 Grounding and Lightning Protection Plan IFR Outstanding ELE 30-May-23 0.04%
92 BSC-FED-SYN-00-E0-MT-001 Electrical Material Take Off (MTO) IFR 1W ELE 30-May-23 0.05%
93 BSC-FED-SYN-00-A0-CA-003 Calculation for Pipe Sleeper IFR Outstanding CIV 30-May-23 0.03%
94 BSC-FED-SYN-00-A0-DW-004 Pipe Support Structure and Foundation Drawing IFR Outstanding CIV 30-May-23 0.02%
95 BSC-FED-SYN-00-A0-MT-001 MTO for Civil IFR 1W CIV 30-May-23 0.05%
96 BSC-FED-SYN-00-A0-MT-002 MTO for Structure IFR 1W CIV 30-May-23 0.05%
97 SKG-FED-SYN-00-G0-RE-001 Site Survey Report RIFR PMT 30-May-23 0.00%
98 SKG-FED-SYN-00-L0-LS-001 Tie-In List IFR Outstanding PIP 30-May-23 0.05%
99 SKG-FED-SYN-00-L0-DS-001 Datasheet for Piping Specialty Item IFR Outstanding PIP 30-May-23 0.04%
100 SKG-FED-SYN-00-L0-CA-001 Pipe Stress Analysis IFR 1W PIP 30-May-23 0.19%
101 SKG-FED-SYN-00-L0-CA-002 Pipe Wall Thickness Calculation IFR Outstanding PIP 30-May-23 0.05%
102 SKG-FED-SYN-00-L0-DW-001 Overall Plant Layout IFR Outstanding PIP 30-May-23 0.14%
103 SKG-FED-SYN-00-L0-DW-002 Piping Plan & Pipe Support Location Drawing - Area 1/Area Pig Receiver IFR Outstanding PIP 30-May-23 0.22%
104 SKG-FED-SYN-00-L0-DW-003 Piping Plan & Pipe Support Location Drawing - Area 2/Area Tei-in IFR Outstanding PIP 30-May-23 0.22%
105 SKG-FED-SYN-00-L0-MT-001 Material Take Off (MTO) - Piping Bulk & Manual Valve IFR 1W PIP 30-May-23 0.07%
106 SKG-FED-SYN-00-J0-MT-001 MTO - Instrument IFR 1W INS 30-May-23 0.08%
107 SKG-FED-SYN-00-A0-CA-001 Foundation Calculation for Liquid Pig Receiver IFR 1W CIV 30-May-23 0.02%
108 SKG-FED-SYN-00-A0-CA-002 Structure and Foundation Calculation for Pipe Support IFR 1W CIV 30-May-23 0.03%
109 SKG-FED-SYN-00-A0-CA-003 Foundation Calculation for Pipe Sleeper IFR 1W CIV 30-May-23 0.03%
110 SKG-FED-SYN-00-A0-DW-001 Foundation for Liquid Pig Receiver IFR Outstanding CIV 30-May-23 0.02%
111 SKG-FED-SYN-00-A0-DW-002 Pipe Sleeper Foundation Drawing IFR Outstanding CIV 30-May-23 0.02%
112 SKG-FED-SYN-00-A0-DW-003 Pipe Support Structure and Foundation Drawing IFR Outstanding CIV 30-May-23 0.05%
113 SKG-FED-SYN-00-A0-MT-001 MTO for Civil IFR 1W CIV 30-May-23 0.05%
114 SKG-FED-SYN-00-A0-MT-002 MTO for Structure IFR 1W CIV 30-May-23 0.05%
115 BMH-FED-SYN-00-A0-CA-034 Calculation for Culvert Road & Railway Crossing for Flowline - Trunkline IFR Outstanding CIV 30-May-23 0.04%
116 BMH-FED-SYN-00-A0-CA-035 Calculation for Pipe Bridge River Crossing (for typical river crossing) IFR Outstanding CIV 30-May-23 0.04%
117 BMH-FED-SYN-00-A0-DW-064 Box Culvert Road Crossing Drawing (3 Sheet) IFR 1W CIV 30-May-23 0.05%
118 BMH-FED-SYN-00-A0-DW-065 IFR 1W
Steel Bridge Structure for River Crossing Drawing (for typical river crossing) (3sheet) CIV 30-May-23 0.06%
119 BMH-FED-SYN-00-A0-MT-003 MTO for Civil IFR 1W CIV 30-May-23 0.05%
120 BMH-FED-SYN-00-A0-MT-004 MTO for Structure IFR 1W CIV 30-May-23 0.05%
121 BMH-FED-SYN-00-L0-CA-010 Onshore Pipeline River Crossing Analysis (Trunkline Gas) IFR Outstanding PL 30-May-23 0.07%
122 BMH-FED-SYN-00-L0-CA-011 Onshore Pipeline River Crossing Analysis (Trunkline Liquid) IFR Outstanding PL 30-May-23 0.07%
123 BMH-FED-SYN-00-L0-DW-025 Pipeline River Crossing List (Flowline) IFR Outstanding PL 30-May-23 0.06%
124 BMH-FED-SYN-00-L0-DW-026 Pipeline River Crossing List (Trunkline) IFR Outstanding PL 30-May-23 0.06%
125 BMH-FED-SYN-00-L0-DW-027 Pipeline Road Crossing List (Flowline) IFR Outstanding PL 30-May-23 0.06%
126 BMH-FED-SYN-00-L0-DW-028 Pipeline Road Crossing List (Trunkline) IFR Outstanding PL 30-May-23 0.06%
127 BMH-FED-SYN-00-L0-DW-029 Cathodic Protection Drawing (Flowline) IFR 1W PL 30-May-23 0.03%
128 BMH-FED-SYN-00-L0-DW-030 Cathodic Protection Drawing (Trunkline ) IFR 1W PL 30-May-23 0.03%
129 BMH-FED-SYN-00-L0-MT-002 Material Take Off (MTO) for Flowline BMH-INF1 IFR 1W PL 30-May-23 0.05%
130 BMH-FED-SYN-00-L0-MT-003 Material Take Off (MTO) for Flowline BMH-01 IFR 1W PL 30-May-23 0.05%
131 BMH-FED-SYN-00-L0-MT-004 Material Take Off (MTO) for Flowline BMH-STOA IFR 1W PL 30-May-23 0.05%
132 BMH-FED-SYN-00-L0-MT-005 Material Take Off (MTO) for Flowline BMH-STOB IFR 1W PL 30-May-23 0.05%
133 BMH-FED-SYN-00-L0-MT-006 Material Take Off (MTO) for Flowline CLS-INF IFR 1W PL 30-May-23 0.05%
134 BMH-FED-SYN-00-L0-MT-007 Material Take Off (MTO) for Gas Trunkline IFR 1W PL 30-May-23 0.05%
135 BMH-FED-SYN-00-L0-MT-008 Material Take Off (MTO) for Liquid Trunkline IFR 1W PL 30-May-23 0.05%
136 BMH-FED-SYN-00-L0-DS-005 Datasheet for Manual Valve (If Required) IFR Outstanding PIP 30-May-23 0.03%
137 BMH-FED-SYN-00-L0-DS-006 Datasheet for Piping Specialty Item (If Required) IFR Outstanding PIP 30-May-23 0.04%
138 BMH-FED-SYN-00-L0-DW-031 Piping Plan - (Typical 5 flowline) IFR Outstanding PIP 30-May-23 0.22%
139 BMH-FED-SYN-00-L0-MT-009 Material Take Off (MTO) - Piping Bulk, Pipe Support & Manual Valve IFR 1W PIP 30-May-23 0.07%
140 BMH-FED-SYN-00-A0-DW-066 Pipe Support Structure and Foundation Drawing IFR Outstanding CIV 30-May-23 0.03%
141 BMH-FED-SYN-00-A0-MT-005 MTO for Civil IFR 1W CIV 30-May-23 0.05%
142 BMH-FED-SYN-00-P0-SR-006 Flare Network Hydraulic Study IFA Outstanding PRO 30-May-23 0.08%
143 BMH-FED-SYN-00-P0-CA-021 KO Drum Pump Calculation Report IFA Outstanding PRO 30-May-23 0.03%
Daftar Dokumen 2 Minggu Kedepan
JOB 289-CTR 022 & CTR 039
PT Pertamina EP ZONA 7
FEED SP Bambu Merah - Pembangunan Fasilitas Baru SP BMH

Target
NO. CTR / Drawing No. Deliverables Action Discipline Remark Weight
Submission

144 BMH-FED-SYN-00-P0-CA-024 Utility Consumption Study Report IFA Outstanding PRO 30-May-23 0.03%
145 BMH-FED-SYN-00-P0-CA-030 Service Water Pump Calculation Report IFA Outstanding PRO 30-May-23 0.00%
146 BMH-FED-SYN-00-P0-LS-001 Line List of Fire Protection (Hydrant, Fire Cabinet, CO2 Extinguesher, Fire IFA Outstanding PRO 30-May-23 0.03%
Datasheet
147 BMH-FED-SYN-00-P1-DS-001 Extinguish System, and Foam Cabinet) IFA 1W SAF 30-May-23 0.00%

148 BMH-FED-SYN-00-P1-DS-002 Datasheet of Safety Equipment IFA 1W SAF 30-May-23 0.00%


149 BMH-FED-SYN-00-P1-DS-003 Datasheet of Foam System IFA 1W SAF 30-May-23 0.00%
150 BMH-FED-SYN-00-P1-DS-004 Datasheet of CO2 Snuffing System IFA 1W SAF 30-May-23 0.00%
151 BMH-FED-SYN-00-P1-DW-006 Fire & Gas Detection Layout (Overall Layout) IFA Outstanding PRO 30-May-23 0.02%
152 BMH-FED-SYN-00-M0-CA-001 Mechanical Strength Calculation For Pressure Vessel ( Exclude Package Vendor) IFA 1W MEC 30-May-23 0.03%
153 BMH-FED-SYN-00-M0-CA-002 Mechanical Strength Calculation For Storage Tank ( Exclude Package Vendor) IFA 1W MEC 30-May-23 0.03%
154 BMH-FED-SYN-00-M0-DS-008 Mechanical Datasheet for Liquid Transfer Pump IFA 1W MEC 30-May-23 0.03%
155 BMH-FED-SYN-00-M0-DS-010 Mechanical Datasheet for Flare Tip Package IFA 1W MEC 30-May-23 0.02%
156 BMH-FED-SYN-00-M0-DS-011 Mechanical Datasheet for Gas Engine Generator Set IFA 1W MEC 30-May-23 0.04%
157 BMH-FED-SYN-00-M0-DS-013 Mechanical Datasheet for Chemical Injection Pump IFA 1W MEC 30-May-23 0.02%
158 BMH-FED-SYN-00-L0-DS-001 Datasheet for Manual valve IFA Outstanding PIP 30-May-23 0.02%
159 BMH-FED-SYN-00-L0-CA-001 Pipe Wall Thickness Calculation IFA Outstanding PIP 30-May-23 0.03%
160 BMH-FED-SYN-00-J0-LS-003 Instrument Power Consumption List IFA 1W INS 30-May-23 0.02%
161 BMH-FED-SYN-00-J0-DS-001 Instrument Data Sheet Pressure Safety Valve IFA 1W INS 30-May-23 0.02%
162 BMH-FED-SYN-00-J0-DS-002 Instrument Data Sheet Pressure Gauge IFA 1W INS 30-May-23 0.02%
163 BMH-FED-SYN-00-J0-DS-003 Instrument Data Sheet Pressure Transmitter IFA 1W INS 30-May-23 0.02%
164 BMH-FED-SYN-00-J0-DS-005 Instrument Data Sheet Temperature Gauge IFA 1W INS 30-May-23 0.01%
165 BMH-FED-SYN-00-J0-DS-006 Instrument Data Sheet Temperature Transmitter IFA 1W INS 30-May-23 0.01%
166 BMH-FED-SYN-00-J0-DS-007 Instrument Data Sheet Turbine Flowmeter IFA 1W INS 30-May-23 0.01%
167 BMH-FED-SYN-00-J0-DS-008 Instrument Data Sheet Level Gauge IFA 1W INS 30-May-23 0.02%
168 BMH-FED-SYN-00-J0-DS-009 Instrument Data Sheet Differential Pressure Level Transmitter IFA 1W INS 30-May-23 0.02%
169 BMH-FED-SYN-00-J0-DS-010 Instrument Data Sheet Control Valve & Controller IFA 1W INS 30-May-23 0.02%
170 BMH-FED-SYN-00-J0-DS-011 Instrument Data Sheet Shutdown Valve/Blowdown Valve IFA 1W INS 30-May-23 0.02%
171 BMH-FED-SYN-00-J0-DS-012 Instrument Data Sheet Tank Breather Valve & Emergency Relief Valve IFA 1W INS 30-May-23 0.00%
172 BMH-FED-SYN-00-J0-DS-013 Instrument Data Sheet Pressure Regulator and Reducing Data Sheet IFA 1W INS 30-May-23 0.01%
173 BMH-FED-SYN-00-E0-LS-001 Electrical Load List IFA 1W ELE 30-May-23 0.03%
174 BMH-FED-SYN-00-E0-CA-003 Lighting Illumination Calculation IFA Outstanding ELE 30-May-23 0.03%
175 BMH-FED-SYN-00-E0-DW-001 Overall One Line Diagram IFA 1W ELE 30-May-23 0.02%
176 BSC-FED-SYN-00-P0-CA-001 Process Calculation for Production Tank IFA Outstanding PRO 30-May-23 0.02%
177 BSC-FED-SYN-00-P1-RE-003 Fire & Gas Detector Mapping Study (2D) IFA 1W SAF 30-May-23 0.08%
178 BSC-FED-SYN-00-P0-PFD-001 Process Flow Diagram (PFD) Tie in to Facility existing IFA Outstanding PRO 30-May-23 0.02%
179 BSC-FED-SYN-00-J0-DS-001 Instrument Data Sheet Pressure Indicator & Transmitter IFA 1W INS 30-May-23 0.02%
180 BSC-FED-SYN-00-J0-DS-004 Instrument Data Sheet Breather Valve IFA 1W INS 30-May-23 0.00%
181 BSC-FED-SYN-00-J0-DS-005 Instrument Data Sheet Pressure Gauge IFA 1W INS 30-May-23 0.01%
182 BSC-FED-SYN-00-J0-DS-006 Instrument Data Sheet Temperature Gauge & Thermowell IFA 1W INS 30-May-23 0.01%
183 BSC-FED-SYN-00-J0-DS-007 Instrument Data Sheet Level Gauge IFA 1W INS 30-May-23 0.01%
184 BSC-FED-SYN-00-J0-DS-009 Instrument Data Sheet Pig Signal IFA 1W INS 30-May-23 0.00%
185 BSC-FED-SYN-00-A0-CA-002 Foundation Calculation for Production Tank/Test Tank IFA 1W CIV 30-May-23 0.03%
186 BSC-FED-SYN-00-A0-CA-004 Calculation for Pipe Sleeper IFA 1W CIV 30-May-23 0.02%
187 SKG-FED-SYN-00-P0-PFD-001 Process Flow Diagram (PFD) Tie in to Facility existing IFA Outstanding PRO 30-May-23 0.02%
188 SKG-FED-SYN-00-J0-DS-001 Instrument Data Sheet Pressure Safety Valve IFA 1W INS 30-May-23 0.02%
189 SKG-FED-SYN-00-J0-DS-002 Instrument Data Sheet Pressure Gauge IFA 1W INS 30-May-23 0.02%
190 SKG-FED-SYN-00-J0-DS-003 Instrument Data Sheet Temperature Gauge IFA 1W INS 30-May-23 0.01%
191 SKG-FED-SYN-00-J0-DS-004 Instrument Data Sheet Pig Signal IFA 1W INS 30-May-23 0.00%
192 BMH-FED-SYN-00-L0-BD-002 Pipeline Design Basis IFA Outstanding PL 30-May-23 0.00%
193 BMH-FED-SYN-00-L0-SP-002 Specification for Field Joint Coating IFA Outstanding PL 30-May-23 0.03%
194 BMH-FED-SYN-00-L0-SP-003 Specification for Anti Corrosion Coating IFA Outstanding PL 30-May-23 0.01%
195 BMH-FED-SYN-00-L0-DS-003 Anti Corrosion Coating Data Sheet (Flowline) IFA 1W PL 30-May-23 0.02%
196 BMH-FED-SYN-00-L0-DS-004 Field Joint Coating Data Sheet (Trunkline) untuk trunkline dan flowline IFA 1W PL 30-May-23 0.02%
197 BMH-FED-SYN-00-L0-CA-012 Pipeline Cathodic Protection Design (Trunkline gas & Liquid) IFA Outstanding PL 30-May-23 0.04%
198 BMH-FED-SYN-00-L0-DW-009 General Field Layout (Flowline & Trunkline) IFA Outstanding PL 30-May-23 0.03%
199 BMH-FED-SYN-00-L0-DW-011 Onshore Pipeline Route Drawing for Flowline BMH-INF1 IFA 1W PL 30-May-23 0.04%
200 BMH-FED-SYN-00-L0-DW-012 Onshore Pipeline Route Drawing for Flowline BMH-01 IFA 1W PL 30-May-23 0.04%
201 BMH-FED-SYN-00-L0-DW-013 Onshore Pipeline Route Drawing for Flowline BMH-STOA IFA 1W PL 30-May-23 0.04%
202 BMH-FED-SYN-00-L0-DW-014 Onshore Pipeline Route Drawing for Flowline BMH-STOB IFA 1W PL 30-May-23 0.04%
203 BMH-FED-SYN-00-L0-DW-015 Onshore Pipeline Route Drawing for Flowline CLS-INF IFA 1W PL 30-May-23 0.04%
204 BMH-FED-SYN-00-L0-DW-016 Onshore Pipeline Route Drawing for Gas Trunkline IFA 1W PL 30-May-23 0.04%
205 BMH-FED-SYN-00-L0-DW-017 Onshore Pipeline Route Drawing for Liquid Trunkline IFA 1W PL 30-May-23 0.04%
206 BMH-FED-SYN-00-P0-SR-001 Process Operation Control and Shutdown Philosophy IFB Outstanding PRO 30-May-23 0.03%
207 BMH-FED-SYN-00-P0-SR-002 Material Selection Study Flowline and Trunkline IFB Outstanding PRO 30-May-23 0.05%
208 BMH-FED-SYN-00-P0-SR-003 Material Selection Study Main Equipment IFB Outstanding PRO 30-May-23 0.05%
209 BMH-FED-SYN-00-P0-SR-004 Material Selection Study Piping IFB Outstanding PRO 30-May-23 0.05%
210 BMH-FED-SYN-00-P0-SR-005 Relief and Depressuring Study IFB Outstanding PRO 30-May-23 0.05%
211 BMH-FED-SYN-00-P0-CA-006 KO Drum Calculation Report IFB Outstanding PRO 30-May-23 0.03%
212 BMH-FED-SYN-00-P0-CA-007 Closed Drain Vessel Calculation Report IFB Outstanding PRO 30-May-23 0.03%
213 BMH-FED-SYN-00-P0-CA-008 Open Drain Vessel Calculation Report IFB Outstanding PRO 30-May-23 0.03%
214 BMH-FED-SYN-00-P0-CA-009 Fuel Gas Scrubber & Filter Calculation Report IFB Outstanding PRO 30-May-23 0.03%
Daftar Dokumen 2 Minggu Kedepan
JOB 289-CTR 022 & CTR 039
PT Pertamina EP ZONA 7
FEED SP Bambu Merah - Pembangunan Fasilitas Baru SP BMH

Target
NO. CTR / Drawing No. Deliverables Action Discipline Remark Weight
Submission

215 BMH-FED-SYN-00-P0-CA-010 IA and UA Receiver Calculation Report IFB Outstanding PRO 30-May-23 0.03%
216 BMH-FED-SYN-00-P0-CA-011 Prod Tank Calculation Report IFB Outstanding PRO 30-May-23 0.02%
217 BMH-FED-SYN-00-P0-CA-012 Test Tank Calculation Report IFB Outstanding PRO 30-May-23 0.02%
218 BMH-FED-SYN-00-P0-CA-013 Diesel Tank Calculation Report IFB Outstanding PRO 30-May-23 0.02%
219 BMH-FED-SYN-00-P0-CA-015 Service Water Tank Calculation Report IFB Outstanding PRO 30-May-23 0.02%
220 BMH-FED-SYN-00-P0-CA-016 Transfer Pump Calculation Report IFB Outstanding PRO 30-May-23 0.03%
221 BMH-FED-SYN-00-P0-CA-019 Closed Drain Pump Calculation Report IFB Outstanding PRO 30-May-23 0.03%
222 BMH-FED-SYN-00-P0-CA-020 Open Drain Pump Calculation Report IFB Outstanding PRO 30-May-23 0.03%
223 BMH-FED-SYN-00-P0-CA-022 Diesel Transfer Pump Calculation Report IFB Outstanding PRO 30-May-23 0.03%
224 BMH-FED-SYN-00-P0-CA-023 Deep Well Pump Calculation Report IFB Outstanding PRO 30-May-23 0.03%
225 BMH-FED-SYN-00-P0-CA-025 Line Sizing Calculation IFB Outstanding PRO 30-May-23 0.03%
226 BMH-FED-SYN-00-P0-PFD-001 Process Flow Diagram (Header Manifold and Separation) IFB Outstanding PRO 30-May-23 0.02%
227 BMH-FED-SYN-00-P0-PFD-002 Process Flow Diagram (Storage & Transfer System) IFB Outstanding PRO 30-May-23 0.02%
228 BMH-FED-SYN-00-P0-PFD-003 Process Flow Diagram (Gas & DHU System) IFB Outstanding PRO 30-May-23 0.02%
229 BMH-FED-SYN-00-P0-PID-001 P&ID Drawing Index IFB Outstanding PRO 30-May-23 0.03%
230 BMH-FED-SYN-00-P0-UFD-001 UFD -Firewater System IFB Outstanding PRO 30-May-23 0.03%
231 BMH-FED-SYN-00-P0-UFD-002 UFD - Instrument Air IFB Outstanding PRO 30-May-23 0.03%
232 BMH-FED-SYN-00-P0-UFD-003 UFD -Fuel Gas System IFB Outstanding PRO 30-May-23 0.03%
233 BMH-FED-SYN-00-P0-UFD-004 UFD - Power Gen System IFB Outstanding PRO 30-May-23 0.03%
234 BMH-FED-SYN-00-P0-UFD-005 UFD For Drain & Flare System IFB Outstanding PRO 30-May-23 0.03%
235 BMH-FED-SYN-00-P0-UFD-006 UFD Instrument Air System at Wellhead Facilities IFB Outstanding PRO 30-May-23 0.03%
236 BMH-FED-SYN-00-P0-DW-003 Process SAFE Chart Sheet 1 IFB Outstanding PRO 30-May-23 0.02%
237 BMH-FED-SYN-00-P0-DW-004 Process SAFE Chart Sheet 2 IFB Outstanding PRO 30-May-23 0.02%
238 BMH-FED-SYN-00-P0-DW-005 Process SAFE Chart Sheet 3 IFB Outstanding PRO 30-May-23 0.02%
239 BMH-FED-SYN-00-P0-DW-006 Process SAFE Chart Sheet 4 IFB Outstanding PRO 30-May-23 0.02%
240 BMH-FED-SYN-00-P1-PS-004 Environmental Philosophy IFB Outstanding SAF 30-May-23 0.03%
241 BMH-FED-SYN-00-L0-BD-001 Piping Basis of Design IFB Outstanding PIP 30-May-23 0.15%
242 BMH-FED-SYN-00-L0-SP-001 Specification for Piping Flexibility Analysis IFB Outstanding PIP 30-May-23 0.02%