Control System Engineering
4
Control System Definition
5
Control System
● Scale.
● Available technology.
● Cost.
7
● Technical support.
Control System
• Electric System
desired manner but which does not perform any safety instrumented 9
10
Programmable Logic Control (PLC)
11
Turbo machinery Control System
12
Vibration Monitoring System
13
Vibration Monitoring System
14
Vibration Monitoring System
15
Vibration Monitoring System
16
Boiler Control System
17
Safety Instrumented System
19
Safety Instrumented System
21
Relay Vs. PLC-based Control Panels
23
Programmable Logic Controller (PLC)
24
PLCs Benefits
● Increased Reliability
● More Flexibility
● Lower Cost
● Communications Capability
● Faster Response Time
● Easier to Troubleshoot
25
PLCs Benefits
Increased Reliability
PLCs Benefits
High-speed counting
PLCs Benefits
4. Programming device.
30
Parts of a PLC
Programmable Logic Controller (PLC)
perform the control logic, and execute the outputs is called the scan
time.
32
PLC Scan Cycle
33
PLC Vs. PAC
34
PLC Vs. PAC
36
PLC Vs. PAC
37
PLC Size and Application
39
PLC Size and Application - SIEMENS
40
PLC Size and Application - Allen Bradley
41
PLC Size and Application
45
PLC Size and Application
● Memory is the part of a PLC that stores data, instructions, and the
control program.
● Memory size is usually expressed in K values: 1 K, 6 K, 12 K, and so
on.
● The amount of memory required depends on the application.
● Factors affecting the memory size needed for a particular PLC
installation include:
46
PLC Size and Application
• Data-collecting requirements
• Future expansion
47
Supervisory Control And Data Acquisition (SCADA)
49
Supervisory Control And Data Acquisition (SCADA)
51
Supervisory Control And Data Acquisition (SCADA)
• The SCADA system also provides a host control functions for the
53
Usage of SCADA
2. Water and sewage: State and municipal water utilities use SCADA to
monitor and regulate water flow, reservoir levels, pipe pressure and
other factors.
54
Usage of SCADA
55
Usage of SCADA
subways, trams and trolley buses; to automate traffic signals for rail
systems; to track and locate trains and buses; and to control railroad
crossing gates.
6. Traffic signals: SCADA regulates traffic lights, controls traffic flow and
control system.
58
DCS Architecture
59
DCS Historical Background
61
Honeywell TDC 2000 DCS
62
Yokogawa CENTUM DCS
63
DCS Architecture
communication bus.
65
DCS Architecture
67
DCS Architecture
70
Main Differences Between DCS and SCADA
DCS SCADA
Process driven hardware Event driven
Small geographic areas Large geographic areas
Suited to large integrated systems such Suited to multiple independent systems
as chemical processing and electricity such as discrete manufacturing and
generation utility distribution
Good data quality and media reliability Poor data quality and media reliability
Powerful, closed-loop control Power efficient hardware, often focused
on binary signal detection 71
Main Differences Between DCS and PLC
• The PLC is cost-effective from 0 to a few thousand I/O points; the DCS
• In large plants the DCS is king because most owners want a single source of
• Generally, PLCs are stand alone and perform a particular task, where a
• PLC only handle sequential process than DCS can handled both