0% found this document useful (0 votes)
212 views5 pages

3 - JSA Loading Off Loading

This Job Safety Analysis document summarizes the high risk tasks, hazards, and control measures for loading and unloading activities during the Gasco/PPL compression project in Gambat, Pakistan. Key tasks identified include mobilizing equipment and materials, vehicle movement inside the facility, material loading and unloading operations, and using lifting equipment. Hazards include equipment failure, incompetent operators, load drops, and improper ground conditions. Control measures specified are following PPL permit to work procedures, using certified equipment and trained operators, conducting toolbox talks and hazard assessments, following speed limits, and barricading work areas. Residual risks are reduced to acceptable levels by implementing the specified controls.

Uploaded by

Aijaz Ahmed
Copyright
© © All Rights Reserved
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
Download as docx, pdf, or txt
0% found this document useful (0 votes)
212 views5 pages

3 - JSA Loading Off Loading

This Job Safety Analysis document summarizes the high risk tasks, hazards, and control measures for loading and unloading activities during the Gasco/PPL compression project in Gambat, Pakistan. Key tasks identified include mobilizing equipment and materials, vehicle movement inside the facility, material loading and unloading operations, and using lifting equipment. Hazards include equipment failure, incompetent operators, load drops, and improper ground conditions. Control measures specified are following PPL permit to work procedures, using certified equipment and trained operators, conducting toolbox talks and hazard assessments, following speed limits, and barricading work areas. Residual risks are reduced to acceptable levels by implementing the specified controls.

Uploaded by

Aijaz Ahmed
Copyright
© © All Rights Reserved
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
Download as docx, pdf, or txt
Download as docx, pdf, or txt
You are on page 1/ 5

Job Safety Analysis

Job Safety Worksheet

Area of Work Considered: PROCUREMENT, CONSTRUCTION & PRE-COMMISSIONING


Job No: PPL-
WORKS FOR GAMBAT (GPF-IV) COMPRESSION PROJECT - Gasco/PPL - 010 Pre JSA Date: June 14,2022 GAM-22-SD-03
Shutdown Works Plan for ATA 2022

3. Jahangir Ahmed ( Mech


1. Aijaz (HSE Advisor PPL ) 2. Hammad Zaidi (Site Engr PPL)
Superintendent)
JSA participants
4. Shamsheer Mushtaq (HSE Team
Lead)

Job Location & details:

Loading off loading


Prepared By: Shamsheer Mushtaq
Distribution:
Reviewed By: Aijaz

Type of Permit Required Additional PPE Requirements


Special tools or equipments required
(Please List)
Cold Work Permit
Hot Work Permit Category 1. Dust Mask 
2. Reflecting Vest 1. Inspected Power/ Hand tools
3. Full body harness 2. Crane 
4. Gloves  3. Lifting Gears /Equipment, Shackles, belts, Slings
5. Safety Shoes  4. Trailer/Mazda
6. Safety Helmet
7. Coverall 
Job Safety Analysis

Approved By: Signature: Date:

Report Number Incident Summary

Activity Assessment Form


Loading Off Loading
Residual
Task / Activity Risk Responsi
Hazard Hazard Effect Control Measures Risk
Description Rating bility
Rating

Vehicle /Equipment Injury / asset  Work under PPL PTW system


Failure Damage  Third Party Certified & Inspected Equipment Shall be used Gasco
3B  Spark Arrestors Shall be Installed on Exhaust 2A

Mobilization Of  Route shall be decided & communicated to all drivers & operators.
Equipment &
Material Incompetent Injury / asset Gasco
driver/Operators  Third Party Trained, Competent and Skilled Driver/operator.
Damage  Tool Box Talk Shall be conducted.
2B 1A
 JSA briefings & Hazards communication to personnel on job.

Vehicle / Equipment Injury / asset 2B  PPL Speed limits shall be followed inside facility. 1A
Movement inside  Route shall be defined & Communicated to operators/drivers.
Facility/Plant Damage
 Driver to be conscious about Facility piping & structures.
 Material shall not extend out of vehicle's body or tail board.
 Ensure Reverse alarm installed on equipment and vehicles.
 Banks man shall be available with heavy vehicles
 Mobilization shall be done only in day time
Job Safety Analysis

 No Movement is permitted during night time until approved by PPL

Fuel & Oil Drips / Environmental


Leakages  Visual inspection shall be done to check any leakage.
Issues  Oil contaminated soil shall be removed & disposed of at designated place.
2C 1A
 Vehicle & equipment shall be check listed by Gasco

 Follow PTW system of PPL.


 Discuss JSA prior to start activity and follow.
Material  Appropriate PPE’s.
Loading off  Area barricaded + Safety signs
Personal Injury/
Loading / Load Drop 3B  Proper attachment of load Gasco
2B
Rigging Suspended Load. Asset Damage  Ensure proper latching
Operation  No personnel movement including rigging crew under suspended load.
 No movement of load near live line.
 Heavy lift activity must not be performed in night.

 Third party certification of all equipment, operators and riggers


 Equipment must be inspected by Gasco prior to start the job.
Un inspected lifting Personal Injury/
3B  Area should be barricade.
equipment / rigging 1B
Asset Damage  Operator must have valid 3rd party certificate.
gears
 Rigging Supervisor shall be present all the time during lifting operations.

Incompetent
operators/rigging 1B
crew
Gasco
asset damage,  Proper compacted and leveled ground muse be choose for material off
Improper ground
3B loading/loading. 1B
condition equipment tilt over
Job Safety Analysis

 Direct eye to eye contact between crane operator and signal man
 Signal man wear reflecting vest
Signal error Personal Injury 2B 1B
 Lifting shall be done only day time, for night activity special lighting and approval
from PPL is required