Elc Morowali

The document is a price quote from PT. Heksah Prakarsa Teknik to PT. Telaga Totoli Strukturindo for electrical and mechanical equipment for a 33kW micro-hydro power plant project in Morowali, Indonesia. It provides a price of 59,375,000 Rupiah for an Renerconsys/Protel ELC MC-1 unit including a Baker Unfinned air heater ballast load and remote monitoring system. A 7.5% discount is offered, bringing the total net contract price to 54,921,875 Rupiah. Specifications for the ELC MC-1 controller are also included.
Copyright
© © All Rights Reserved
Available Formats
Download as PDF, TXT or read online on Scribd
Download as pdf or txt
0% found this document useful (0 votes)
34 views2 pages

Elc Morowali

The document is a price quote from PT. Heksah Prakarsa Teknik to PT. Telaga Totoli Strukturindo for electrical and mechanical equipment for a 33kW micro-hydro power plant project in Morowali, Indonesia. It provides a price of 59,375,000 Rupiah for an Renerconsys/Protel ELC MC-1 unit including a Baker Unfinned air heater ballast load and remote monitoring system. A 7.5% discount is offered, bringing the total net contract price to 54,921,875 Rupiah. Specifications for the ELC MC-1 controller are also included.
Copyright
© © All Rights Reserved
Available Formats
Download as PDF, TXT or read online on Scribd
Download as pdf or txt
Download as pdf or txt
You are on page 1/ 2

MAIL TO : admin.heksahydro@gmail.

com
FAX TO : +62 22 6613088

POST TO : Kus Raharjo, Cimindi Raya AK-4,


Bandung 40514, Indonesia

Kepada Yth: PT. TELAGA TOTOLI STRUKTURINDO


Dengan Hormat,

Berikut kami sampaikan harga peralatan ELC termasuk ballast load dan RMS (Remote monitoring System) sesuai dengan
permintaan Bapak untuk PLTMH di Kab. Morowali untuk proyek EBTKE-2016. Demikian kami sampaikan, terima kasih atas
perhatian dan kerja samanya. Mohon PO segera diterbitkan.

Hormat kami,
Bandung, 15 Nov 2016
PT. HEKSA PRAKARSA TEKNIK

Ir. Kusetiadi Raharjo


Director

PROJECT: Rehabilitasi PLTMH Desa Lamantoli, Kecamatan Bungku Pesisir, Kab. Morowali, Prop.
Sulawesi Tengah
Generating Power (Electrical) = 33 kW
Under Net Head = 24.8 meter
Flow (discharge) = 200 liter/sec
UNIT PRICE
No. Description QTY UNIT TOTAL PRICE RP.
RP.
A Electrical Mechanical Equipment

ELC MC-1 merk: Renerconsys/Protel , 33 kW/ 42 kVA,


1 termasuk : Baker Unfinned air heater ballast load - dan 1 set 59,375,000 59,375,000
Remote Monitoring Systems (RMS)

A. TOTAL BIAYA RP. (NETTO) EX WORKS BANDUNG 59,375,000

B. DISCOUNT 7.5% 4,453,125

C. TOTAL KONTRAK NETTO = A-B 54,921,875

33K-24.8M-200L-D225-B250-MOROWALI
ANNEX A.5 CONTROLLER SPECIFICATIONS
PROJECT: Rehabilitasi PLTMH Desa Lamantoli, Kecamatan Bungku Pesisir, Kab. Morowali,
Prop. Sulawesi Tengah

ELECTRONIC LOAD CONTROLLER MC-1 HEKSAHYDRO


Type Digital type with Two Step Ballast Load
Rating Power, Maximum 40 kW, 50 kVA at 0.8 Cos phi
380 - 440 Volt line to line (nominal range) , Three Phase STAR
Rating Voltage & Connection
CONNECTION, 50 Hz
Standard Metering Volt, Amp, Frequency and hour meter
Cubicle Dimensions 800 x 600 x 300 mm

Baker Unfinned Tubular Air Heater (only need natural air flow convection for
Ballast Load, Type, Rating and Connection heat dissipation, no need force convection) ex Germany, 3 x (2 x 3 kW + 2 x
4 kW) , Three Phase STAR CONNECTION, 220/380 Volt, 50 Hz

TYPICAL DIMENSIONS ELC MC