Isometric Drainage Line Layout: Note: BOD Department of Public Works and Highways Raul C. Asis

This document contains plans and details for a drainage system layout including: 1. An isometric view of the drainage line layout at a scale of 1:100m. 2. A roof drain layout at a scale of 1:125m. 3. A spot detail of part of the drainage system at a scale of 1:15m. 4. A section detail of a drain pipe at a scale of 1:10m.

Uploaded by

nonantonio7
Copyright
© © All Rights Reserved
Available Formats
Download as PDF, TXT or read online on Scribd
Download as pdf or txt
0% found this document useful (0 votes)
29 views1 page

Isometric Drainage Line Layout: Note: BOD Department of Public Works and Highways Raul C. Asis

This document contains plans and details for a drainage system layout including: 1. An isometric view of the drainage line layout at a scale of 1:100m. 2. A roof drain layout at a scale of 1:125m. 3. A spot detail of part of the drainage system at a scale of 1:15m. 4. A section detail of a drain pipe at a scale of 1:10m.

Uploaded by

nonantonio7
Copyright
© © All Rights Reserved
Available Formats
Download as PDF, TXT or read online on Scribd
Download as pdf or txt
Download as pdf or txt
You are on page 1/ 1

1 ISOMETRIC DRAINAGE LINE LAYOUT

P-5 SCALE 1:100M.

4 DETAIL SECTION OF DRAIN PIPE


P-5 SCALE 1:10M.

3 SPOT DETAIL
P-5 SCALE 1:15M.

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
600 54000 600
4500 9000 9000 9000 9000 9000 9000 4500
4500 4500 4500 4500 4500 4500 4500 4500 4500 4500 4500 4500
1100

6050
7000
9500

6050
2500

C
1100

2 ROOF DRAIN LAYOUT


P-5 SCALE 1:125M.

REVIEWED AS TO
DESIGNED: CHECKED: SUBMITTED: RECOMMENDING APPROVAL APPROVED:(FOR ISSUANCE) PROJECT & LOCATION / BARANGAY: SHEET CONTENTS: SET NO. SHEET NO.
DESIGN CONCEPT:

VARIOUS DPWH
(SEE COVER SHEET) (SEE COVER SHEET) (SEE COVER SHEET) PROPOSED PROJECTS ISOMETRIC DRAINAGE LINE LAYOUT, BOD
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS 32
NOTE : ADOPTED FROM DPWH STANDARD PLANS STANDARD TWO-STOREY ROOF DRAIN LAYOUT, SPOT DETAIL & P-5
RAUL C. ASIS SECTION OF DRAIN PIPE 42
SCHOOL BUILDING
OIC, BUILDINGS DIVISION DIRECTOR IV, BOD UNDERSECRETARY SECRETARY