1. Value Stream Map:
1. Use your chart to highlight potential areas of waste. Augment your chart with waste
symbols.
2. Where are the most urgent matters to address with regards to waste?
3. What is the ratio between value added and non-value added time?
4. How could the ratio be improved?
5. What is the takt time and how does this help to recognise waste?
6. What is the total quality rating for this process?
2. Urgent Matters:
Waiting Times: The excessive waiting times between stages are the most urgent waste to
address. They contribute significantly to the long lead time and impact customer satisfaction.
Quality Issues: Defects at various stages add quality costs and delay shipments. Improving
quality control throughout the process is crucial.
6. Takt time is the time it takes to finish a product to meet demand. For example, if a
customer orders a new product every hour, the team needs to finish it in an hour or less. That
means the takt time must be less than an hour. If the team takes longer than an hour (the cycle
time), then the process will need to be streamlined or minimized in order to align with the
takt time.