Method of Statment For Roof Insulation
Method of Statment For Roof Insulation
: 00
Method of Statement of roof
Insulation and sloped lightweight Date:8-9-2021 Page: 1 of 8
concrete
Method of Statement of
roof Insulation sloped
lightweight concrete
00 Hytham El-Nouby
Rev.: 00
Method of Statement of roof
Insulation and sloped lightweight Date:8-9-2021 Page: 2 of 8
concrete
05
04
03
02
01
00 - Original Issue
Rev.: 00
Method of Statement of roof
Insulation and sloped lightweight Date:8-9-2021 Page: 3 of 8
concrete
1- Scope:
The scope of this method is to define the detailed sequence of the installation of
waterproofing and thermal Insulation work for roof
2- Responsibilities:
2-1 Site Manager:
2-1-1 The Site Manager shall be responsible for the overall implementation of
this Method statement, and for ensuring that Site and Section Engineers
are well informed of its requirements.
2-3 Surveyors:
2-3-1 setting out and recheck the locations and elevations of MEP sleeves.
2-4 QC Manager:
2-4-1 Reviewing all relevant documentation and test reports and prepare all
handing over reports.
2-4-2 Clearing all the non-conformances relevant to the activity.
2-4-3 Ensuring that the Engineer’s Representative / Inspector clears all
discipline activities that must be inspected and tested.
2-4-4 Organizing and allocating of inspection works to Quality Control
Inspectors.
2-4-5 Ensuring that all inspection are performed and recorded as per project
specifications.
2-4-6 Ensuring inspections are carried out in a timely manner and documented
as per project inspection plan.
2-5 QC Engineers:
2-5-1 Informing Engineer’s Representative by works Inspection Request as and
when his presence is required to carry out inspections as per the approved
project inspection plan.
2-5-2 Inspect the work as per approved project inspection plan and approved
shop drawings and make sure the work is ready for Owner’s representative
inspection if required.
2-5-3 Accompanying Owner’s Representative \ Inspector to carryout
inspections and release hold points.
2-5-4 Preparing, Signing and obtain signatures from Owner’s Representative/
Inspector on the relevant External Request Check lists and ITP.
Rev.: 00
Method of Statement of roof
Insulation and sloped lightweight Date:8-9-2021 Page: 4 of 8
concrete
4- Materials:
4-1 Cement complies with E.S.
4-2 Sand Comply with E.S as fine aggregate must be clean, good gradation and free
from any organic or silt without any sulfate and periodically test shout be done
5- Procedure:
5-1 Pre-work
5-1-1 Material receiving and storage:
5-1-1-1 Checking supplier’s certificates of compliance to
conform to specification and referenced Standards
prior to installation.
5-2 Work
5-2-1 Surface of roof will be finished by helicopter to make
surface smooth clean and free from all strange
5-2-3 Applied for primer layer and rates as method by using brush
roller or spray manufactures result
Rev.: 00
Method of Statement of roof
Insulation and sloped lightweight Date:8-9-2021 Page: 5 of 8
concrete
5-2-4 ensure that all pinholes and blowholes are filled and Allow surface to dry
according manufacture recommendations before proceeding with next step
5-2-7 Provide for slight, uniform flow of bitumen in front of roll and full width of roll
as the material is being rolled or set into place and Apply uniform positive
pressure to ensure membrane is fully adhered and all laps are sealed before Prior
to forming lap over granulated surfaces, embed granules of the receiving sheet
by heating and troweling-in the granules to form a uniform black compound
surface Roll all lap areas with a weighted roller immediately after forming lap
and Provide for visual bleed out of compound in lap areas.
5-2-7 For horizontal waterproofing membrane two layers of 4mm thick modified shall
be laid fully torched on blinding concrete with minimum of 150mm horizontal
dir.
5-2-8 The membrane on the exposed external vertical surfaces shall be carried up to a
minimum of 150 mm above the finished level and tucked into a continuous
groove provided for the same and secured firmly with approved sealant/mastic
recommended by the manufacturer of the membrane.
5-2-10 The insulation membrane will be cut at the position of the drain, and then the
drain body will be installed by making two layers of insulation around the pipe
and locking it well to prevent water leakage
5-2-11 Service pipes protruding from slab, shall be suitably dressed around up to 200
mm height, and sealed at upper ends with lap sealant. Roof rain water outlets,
scupper type, shall be dressed and sealed at upper ends with lap sealant.
5-2-12 Make a layer of cement plaster on top of the membrane for protection
5-2-13 Putting thermal insulation foam on top of the cement plaster and covering it with
polyethylene
5-2-14 Dabs and shall will be put in on top of surface to curing for sloped light-
weight concrete according approved drawing
6- Safety:
6-1 All the necessary safety rules, precautions should be followed as indicated in
project safety plan.
6-2 All the necessary safety tools and equipment should be provided as indicated in
project safety plan.
7- Reference:
7-1 Egyptian Code.
7-2 Project Specification.
7-3 Shop Drawings.
7-4 Manufactory Data Sheet.
Rev.: 00
Method of Statement of roof
Insulation and sloped lightweight Date: 8-9-2021 Page: 7 of 8
concrete