0% found this document useful (0 votes)
102 views7 pages

Method of Statment For Roof Insulation

Uploaded by

msss90023
Copyright
© © All Rights Reserved
Available Formats
Download as PDF, TXT or read online on Scribd
Download as pdf or txt
0% found this document useful (0 votes)
102 views7 pages

Method of Statment For Roof Insulation

Uploaded by

msss90023
Copyright
© © All Rights Reserved
Available Formats
Download as PDF, TXT or read online on Scribd
Download as pdf or txt
Download as pdf or txt
You are on page 1/ 7

Rev.

: 00
Method of Statement of roof
Insulation and sloped lightweight Date:8-9-2021 Page: 1 of 8
concrete

Method of Statement of
roof Insulation sloped
lightweight concrete

Issue Date Prepared Checked Approved

00 Hytham El-Nouby
Rev.: 00
Method of Statement of roof
Insulation and sloped lightweight Date:8-9-2021 Page: 2 of 8
concrete

Amendment Since Last Issue

Issue Clause Changes Made

05

04

03

02

01

00 - Original Issue
Rev.: 00
Method of Statement of roof
Insulation and sloped lightweight Date:8-9-2021 Page: 3 of 8
concrete

1- Scope:
The scope of this method is to define the detailed sequence of the installation of
waterproofing and thermal Insulation work for roof
2- Responsibilities:
2-1 Site Manager:
2-1-1 The Site Manager shall be responsible for the overall implementation of
this Method statement, and for ensuring that Site and Section Engineers
are well informed of its requirements.

2-2 Site Engineers:


2-2-1 To ensure construction of the roof insulation is carried out to the required
codes, Contract Specifications and approved shop drawings.
2-2-2 Notifying Quality Control Engineer when work is ready for inspection
2-2-3 Ensuring that notification time to QCE is sufficient to meet notification
times required by the Engineer’s Representative through the Works
Inspection Request Form.
2-2-4 Liaison with Mechanical, Electrical and Plumbing trades foremen for
marking out and installation of embedded items and cutting holes and
chases for embedded items.

2-3 Surveyors:
2-3-1 setting out and recheck the locations and elevations of MEP sleeves.

2-4 QC Manager:
2-4-1 Reviewing all relevant documentation and test reports and prepare all
handing over reports.
2-4-2 Clearing all the non-conformances relevant to the activity.
2-4-3 Ensuring that the Engineer’s Representative / Inspector clears all
discipline activities that must be inspected and tested.
2-4-4 Organizing and allocating of inspection works to Quality Control
Inspectors.
2-4-5 Ensuring that all inspection are performed and recorded as per project
specifications.
2-4-6 Ensuring inspections are carried out in a timely manner and documented
as per project inspection plan.

2-5 QC Engineers:
2-5-1 Informing Engineer’s Representative by works Inspection Request as and
when his presence is required to carry out inspections as per the approved
project inspection plan.
2-5-2 Inspect the work as per approved project inspection plan and approved
shop drawings and make sure the work is ready for Owner’s representative
inspection if required.
2-5-3 Accompanying Owner’s Representative \ Inspector to carryout
inspections and release hold points.
2-5-4 Preparing, Signing and obtain signatures from Owner’s Representative/
Inspector on the relevant External Request Check lists and ITP.
Rev.: 00
Method of Statement of roof
Insulation and sloped lightweight Date:8-9-2021 Page: 4 of 8
concrete

3- Plant and Equipment:


3-1 Mortar mixer (Rotary or bee mixer).
3-2 Mortal buckets.
3-3 Plaster trowels.
3-4 Gauging trowels.
3-5 Leveling to set out floor level.
3-6 Torch.

4- Materials:
4-1 Cement complies with E.S.
4-2 Sand Comply with E.S as fine aggregate must be clean, good gradation and free
from any organic or silt without any sulfate and periodically test shout be done

- to ensure it is compliant with project specifications


- Water (potable water 4-3)
- Bonding Agent (comply with E.s) and as project requirement 4-4
- Liquid Damp-roofing primer ( Nilocoat WB ) as approved material.
4-6 4-5 (Nilobet NT) Bituminous Waterproofing Membrane as
approved material.
- Chema foam thermal insulation density 29 kg/cm3 not less than 1.76 km2/w as
approved material
- Polyethylene sheet 250 micron
- Light-weight concert with maximum specific gravity (1800kg/m3)

5- Procedure:
5-1 Pre-work
5-1-1 Material receiving and storage:
5-1-1-1 Checking supplier’s certificates of compliance to
conform to specification and referenced Standards
prior to installation.

5-1-1-2 Checking supplier’s delivery tickets for compliance with


supply order and specification as thickness of sheet

5-1-1-3 Store materials at building site strictly according to


manufacturer’s instructions.

5-2 Work
5-2-1 Surface of roof will be finished by helicopter to make
surface smooth clean and free from all strange

5-2-2 Build a mortar fillet strip of using 20cm*20cm mortar


for fillet to contain bonding agent proportion of the
intersection of rc slab and wall

5-2-3 Applied for primer layer and rates as method by using brush
roller or spray manufactures result
Rev.: 00
Method of Statement of roof
Insulation and sloped lightweight Date:8-9-2021 Page: 5 of 8
concrete

5-2-4 ensure that all pinholes and blowholes are filled and Allow surface to dry
according manufacture recommendations before proceeding with next step

5-2-5 Putting on membrane rolled adjustment and cutting as required.

5-2-6 Ensure substrate membrane surfaces are warmed either naturally or by


torch during the installation.by Apply heat evenly to underside of roll
membrane being installed or exposed side lap area of previously
installed sheet.

5-2-7 Provide for slight, uniform flow of bitumen in front of roll and full width of roll
as the material is being rolled or set into place and Apply uniform positive
pressure to ensure membrane is fully adhered and all laps are sealed before Prior
to forming lap over granulated surfaces, embed granules of the receiving sheet
by heating and troweling-in the granules to form a uniform black compound
surface Roll all lap areas with a weighted roller immediately after forming lap
and Provide for visual bleed out of compound in lap areas.

5-2-7 For horizontal waterproofing membrane two layers of 4mm thick modified shall
be laid fully torched on blinding concrete with minimum of 150mm horizontal
dir.

5-2-8 The membrane on the exposed external vertical surfaces shall be carried up to a
minimum of 150 mm above the finished level and tucked into a continuous
groove provided for the same and secured firmly with approved sealant/mastic
recommended by the manufacturer of the membrane.

5-2-10 The insulation membrane will be cut at the position of the drain, and then the
drain body will be installed by making two layers of insulation around the pipe
and locking it well to prevent water leakage

5-2-11 Service pipes protruding from slab, shall be suitably dressed around up to 200
mm height, and sealed at upper ends with lap sealant. Roof rain water outlets,
scupper type, shall be dressed and sealed at upper ends with lap sealant.

5-2-12 Make a layer of cement plaster on top of the membrane for protection

5-2-13 Putting thermal insulation foam on top of the cement plaster and covering it with
polyethylene

5-2-14 Dabs and shall will be put in on top of surface to curing for sloped light-
weight concrete according approved drawing

5-3 Post Work


5-3-1 Over all check for all finished area.
5-3-2 Warranty for roofing system shall be provided for not less than 10 years
after the acceptance of work
Rev.: 00
Method of Statement of roof
Insulation and sloped lightweight Date: 8-9-2021 Page: 6 of 8
concrete

6- Safety:
6-1 All the necessary safety rules, precautions should be followed as indicated in
project safety plan.
6-2 All the necessary safety tools and equipment should be provided as indicated in
project safety plan.

7- Reference:
7-1 Egyptian Code.
7-2 Project Specification.
7-3 Shop Drawings.
7-4 Manufactory Data Sheet.
Rev.: 00
Method of Statement of roof
Insulation and sloped lightweight Date: 8-9-2021 Page: 7 of 8
concrete