0% found this document useful (0 votes)
17 views3 pages

Crochet Poncho Cape Wrap

Crochet poncho cape wrap

Uploaded by

Lou B
Copyright
© © All Rights Reserved
Available Formats
Download as PDF, TXT or read online on Scribd
Download as pdf or txt
0% found this document useful (0 votes)
17 views3 pages

Crochet Poncho Cape Wrap

Crochet poncho cape wrap

Uploaded by

Lou B
Copyright
© © All Rights Reserved
Available Formats
Download as PDF, TXT or read online on Scribd
Download as pdf or txt
Download as pdf or txt
You are on page 1/ 3

7th row: As 5th row.

Tension 8th row: K2. M1. K2. *P5. (K2. M1)


20 sts and 26 rows = 4 ins [10 cm] twice. K2. Rep from * to last 9 sts. P5.
with larger needles in stocking st. K2. M1. K2.
9th row: P5. *Tw5B. P8. Rep from *
to last 10 sts. C5B. P5.
Stitch Glossary 10th row: K5. *P2. K1. P2. K8. Rep
MB = [(P1. yrn) 3 times. P1] all in from * to last 10 sts. P2. K1. P2. K5.
next st. Slip 6th, 5th, 4th, 3rd, 2nd 11th row: P4. *T3B. P1. T3F. P6.
and first sts separately over 7th st. One Rep from * to last 11 sts. T3B. P1.
st rem. Bobble complete. T3F. P4.
M1 = make one st by picking up 12th row: K4. *P2. K3. P2. K6. Rep
horizontal loop lying before next st from * to last 11 sts. P2. K3. P2. K4.
and knitting into back of loop. 13th row: P3. *T3B. P3. T3F. P4.
M1P = make one st by picking up Rep from * to last 12 sts. T3B. P3.
horizontal loop lying before next st T3F. P3.
and purling into back of loop. 14th row: K3. *P2. K5. P2. K4. Rep
T3B = slip next st onto a cable needle from * to last 12 sts. P2. K5. P2. K3.
and leave at back of work. K2, then 15th row: P2. *T3B. P1. P2tog. yrn.
P1 from cable needle. P2. T3F. P2. Rep from * to end of
T3F = slip next 2 sts onto a cable row.
needle and leave at front of work. P1, 16th row: K2. *P2. K7. P2. K2. Rep
then K2 from cable needle. from * to end of row.
Tw5B = slip next 3 sts onto a cable 17th row: P1. *T3B. P1. (P2tog. yrn)
needle and leave at back of work. K2, twice. P2. T3F. Rep from * to last
Patons® Classic Wool then P1. K2 from cable needle. st. P1.
BLANKET PONCHO AND BAG C4F = slip next 2 sts onto a cable 18th row: K1. P2. *K9. P4. Rep from
needle and leave at front of work. K2, * to last 12 sts. K9. P2. K1.
then K2 from cable needle. 19th row: P1. K2. *P1. (P2tog. yrn)
One Size C5B = slip next 3 sts onto a cable 3 times. P2.** C4F. Rep from * to last
needle and leave at back of work. K2, 12sts. Rep from * to ** once. K2. P1.
54 ins [137 cm] wide x 27 ins [68.5 cm] then K3 from cable needle. 20th row: As 18th row.
long. K1B = knit into next st one row 21st row: P1. *T3F. P1. (P2tog. yrn)
below, at same time slipping off st twice. P2. T3B. Rep from * to last
Materials above. st. P1.
22nd row: As 16th row.
Patons® Classic Wool (100 g / 3.5 oz) 23rd row: P2. *T3F. P1. P2tog. yrn.
Poncho (00224 Grey Mix) 12 balls Instructions P2. T3B. P2. Rep from * to end of
Bag (00202 Aran) 2 balls Diamond Pat row.
Poncho: Size 4½ mm (U.S. 7) 1st row: (RS). P6. *K1. P10. Rep 24th row: As 14th row.
circular knitting needle 90 cm long or from * to last 7 sts. K1. P6. 25th row: P3. *T3F. P3. T3B. P4.
size needed to obtain tension. Set of 2nd row: K6. *P1. K10. Rep from * Rep from * to last 12 sts. T3F. P3.
four 4 mm (U.S. 6) double pointed to last 7 sts. P1. K6. T3B. P3.
needles. St holder. Cable needle. 3rd row: P5. *K3. P8. Rep from * to 26th row: As 12th row.
Bag: Sizes 4 mm (U.S. 6) and 4½ mm last 8 sts. K3. P5. 27th row: P4. *T3F. P1. T3B. P6.
(U.S. 7) knitting needles or size needed 4th row: K5. *P3. K8. Rep from * to Rep from * to last 11 sts. T3F. P1.
to obtain tension. Cable needle. last 8 sts. P3. K5. T3B. P4.
Button. 5th row: P4. *K5. P6. Rep from * to 28th row: As 10th row.
last 9 sts. K5. P4. 29th row: P5. *C5B. P8. Rep from *
6th row: K4. *P5. K6. Rep from * to to last 10 sts. C5B. P5.
last 9 sts. P5. K4.
30th row: K2. K2tog. K1. *P5. K2. Proceed as follows: Next row: Work 7 sts in seed st pat.
(K2tog. K1) twice. Rep from * to last 1st row: Work 7 sts in seed st pat. Purl Purl to last 7 sts, dec 4 sts evenly
10 sts. P5. K1. K2tog. K2. to last 7 sts. Work 7 sts in seed st pat. across. Work 7 sts in seed st pat.
31st row: As 5th row. 2nd row: Work 7 sts in seed st pat. Knit 269 sts.
32nd row: As 6th row. to last 7 sts. Work 7 sts in seed st pat. Next row: Work 7 sts in seed st pat.
33rd row: As 3rd row. 3rd row: Work 7 sts in seed st pat. Knit to last 7 sts. Work 7 sts in seed st
34th row: As 4th row. Work 1st row of diamond pat to last pat.**
35th row: As 1st row. 7 sts. Work 7 sts in seed st pat. Work 4 rows of bobble eyelet pat.
36th row: As 2nd row. 4th row: Work 7 sts in seed st pat.
These 36 rows form diamond pat. Work 2nd row of diamond pat to last Next row: (RS). Work 7 sts in seed st
7 sts. Work 7 sts in seed st pat. pat. P21. K1B. P11. M1P. P12. K1B.
Check Pat (worked over 21 sts) P21. (K1B. P24. K1B. P21) 4 times.
1st row: (RS). *K3. P3. Rep from * to Diamond pat is now in position. Work 7 sts in seed st pat. 270 sts.
last 3 sts. K3. Cont working diamond pat (keeping Next row: Work 7 sts in seed st pat.
2nd row: *P3. K3. Rep from * to last 7 side sts in seed st pat as established) Knit to last 7 sts. Work 7 sts in seed st
3 sts. P3. until 36 rows of diamond pat are pat.
3rd and 4th rows: As 1st and 2nd complete.
rows. Next row: Work 7 sts in seed st pat. Purl Proceed as follows:
5th row: *P3. K3. Rep from * to last to last 7 sts. Work 7 sts in seed st pat. 1st row: Work 7 sts in seed st pat.
3 sts. P3. Next row: Work 7 sts in seed st pat. Knit *Work 1st row check pat across next
6th row: *K3. P3. Rep from * to last to last 7 sts. Work 7 sts in seed st pat. 21 sts. K1B. Work 1st row diamond
3 sts. K3. pat across next 24 sts. K1B. Rep from
**Work 4 rows of bobble eyelet pat. * to last 28 sts. Work 1st row check
7th and 8th rows: As 5th and 6th
rows. Next row: (RS). Work 7 sts in seed st pat across next 21 sts. Work 7 sts in
These 8 rows form check pat. pat. P24. *K1B. P21. K1B. P11. seed st pat.
M1P. P12. Rep from * 3 times more. 2nd row: Work 7 sts in seed st pat.
PONCHO BACK K1B. P21. K1B. P24. Work 7 sts in *Work 2nd row check pat across next
Cast on 257 sts. Do not join. seed st pat. 273 sts. 21 sts. K1. Work 2nd row diamond
Working back and forth across needle Next row: Work 7 sts in seed st pat. Knit pat across next 24 sts. K1. Rep from *
in rows, proceed as follows: to last 7 sts. Work 7 sts in seed st pat. to last 28 sts. Work 2nd row check pat
1st row: (RS). K1.* P1. K1. Rep from Proceed in body pat as follows: across next 21 sts. Work 7 sts in seed
* to end of row. 1st row: Work 7 sts in seed st pat. st pat.
This row forms seed st pat. *Work 1st row diamond pat across Diamond and check pats are now in
Work a further 7 rows seed st pat, inc next 24 sts. K1B. Work 1st row check position.
12 sts evenly across last row. 269 sts. pat across next 21 sts. K1B. Rep from Cont working in pat (keeping side sts
Proceed in bobble eyelet border as * to last 31 sts. Work 1st row diamond in seed st pat and working K1B on RS
follows: pat across next 24 sts. Work 7 sts in rows as established) until 36 rows of
1st row: (RS). Work 7 sts in seed st seed st pat. diamond pat are complete.
pat. Knit to last 7 sts. Work 7 sts in 2nd row: Work 7 sts in seed st pat. Next row: Work 7 sts in seed st pat.
seed st pat. *Work 2nd row diamond pat across Purl to last 7 sts. Work 7 sts in seed
2nd row: Work 7 sts in seed st pat. next 24 sts. K1. Work 2nd row check st pat.
Knit to last 7 sts. Work 7 sts in seed st pat across next 21 sts. K1. Rep from * Next row: Work 7 sts in seed st pat.
pat. to last 31 sts. Work 2nd row diamond Knit to last 7 sts, dec 1 st at center.
3rd row: Work 7 sts in seed st pat. pat across next 24 sts. Work 7 sts in Work 7 sts in seed st pat. 269 sts.
*P1. yrn. P2tog. P1. MB. P1. Rep seed st pat.
from * to last 10 sts. yrn. P2tog. P1. Diamond and check pats are now in Rep from ** to ** once.
Work 7 sts in seed st pat. position. Next row: Work 7 sts in seed st pat.
4th row: As 2nd row. Purl to last 7 sts. Work 7 sts in seed st
Cont working in pat (keeping 7 side pat.
These 4 rows form bobble eyelet sts in seed st pat and working K1B on Next row: Work 7 sts in seed st pat.
border. RS rows as established) until 36 rows Knit to last 7 sts. Work 7 sts in seed st
of diamond pat are complete. pat. Cast off.
PONCHO FRONT BAG (make 2 pieces alike) FINISHING: Sew lower edge and
Work as given for Back until work With larger needles cast on 68 sts. sides of Bag Pieces tog. Sew cast on
from beg measures 24 rows less than 1st row: (WS). Knit. and cast off ends of Strap to Bag. Sew
Back to cast off edge, thus ending 2nd row: Purl. twisted cord to center of top edge of
with RS facing for next row. (297 sts 3rd row: Knit. Bag to form button loop. Sew button
are on needle). Work 1st to 36th rows of diamond to correspond to loop.

Neck shaping: Next row: Pat across pat. Twisted cord: Cut 2 strands of yarn
136 sts (neck edge). Turn. Leave rem Next row: (RS). Purl. 8 ins [21 cm] long. With both strands
sts on a spare needle. Next row: Knit. tog hold one end and with someone
Keeping cont of pat, dec 1 st at neck Proceed in bobble eyelet border as holding other end, twist strands to the
edge on next 10 rows, then on follows: right until they begin to curl. Fold the
following 3 alt rows. 1st row: (RS). Knit. 2 ends tog and tie in a knot so they
Cont even until Front measures same 2nd row: Knit. will not unravel. The strands will now
length as Back to cast off edge, ending 3rd row: P3. *yrn. P2tog. P1. MB. twist themselves tog. Adjust length if
with RS facing. Cast off. P2. Rep from * to last 5 sts. yrn. desired.
With RS of work facing slip next 25 sts P2tog. P3.
from spare needle onto a st holder. Join 4th row: Knit.
yarn to rem sts and pat to end of row. These 4 rows complete bobble eyelet
Dec 1 st at neck edge on next 10 rows, border.
then on following 3 alt rows.
Cont even until Front measures same Next row: (RS). P33. K1B. P34.
length as Back to cast off edge, ending Next row: K17. M1. Knit to end of
with RS facing. Cast off. row. 69 sts.
Next row: Work 1st row check pat
Collar: Sew shoulder seams. With RS across next 33 sts. K1B. Work 1st row
of work facing and set of four smaller diamond pat across next 35 sts.
needles, pick up and knit 22 sts down Next row: Work 2nd row diamond
left front neck edge. K25 from front pat across next 35 sts. K1. Work 2nd
st holder. Pick up and knit 22 sts up row check pat across next 33 sts.
right front neck edge and 47 sts across
back neck edge. 116 sts. Divide sts Diamond and check pats are now in
evenly on 3 needles and join in round. position.
Cont working in pat until 36 rows of
Work in rounds of (K2. P2) ribbing diamond pat are complete.
until Collar measures 7 ins [18 cm].
Cast off loosely in ribbing. 1st row: (RS). Knit, dec 1 st at center.
68 sts.
Sew one tassel to each corner of 2nd row: Knit.
Poncho as illustrated. 3rd row: P3. *yrn. P2tog. P1. MB.
Tassel (make 4): Cut a piece of P2. Rep from * to last 5 sts. yrn.
cardboard 5 ins [12.5 cm] wide. Wind P2tog. P3.
yarn around cardboard 40 times. Break 4th row: Knit, dec 6 sts evenly across.
yarn leaving a long end and thread end 62 sts.
through a needle. Slip needle through Work 9 rows in garter st (knit every
all loops and tie tightly. Remove row). Cast off knitways (WS).
cardboard and wind yarn tightly Strap: With smaller needles cast on
around loops 1 inch [2.5 cm] below 9 sts. Proceed in garter st until strap
fold. Fasten securely. Cut through rem (when stretched) measures 37 ins
loops and trim ends evenly. [94 cm]. Cast off.

… a part of your life.


P.O. Box 40 Listowel ON N4W 3H3

You might also like