Process Metrics Document
Process Metrics Document
HEMM Maintenance
& Repair Processes
Introduction
In spite of the fact that it is human nature to want to report good news,
the most valuable performance measures assist us in the identification of
weak areas, poor practices and other opportunities for improvement.
Therefore, it behooves us to take a critical look at our performance via an
honest assessment of that performance. Only in this way are we able to
correct small issues before they become major problems. The collection
of performance measures included in this document help us to identify
and understand on-site performance issues related to project health and
maintenance / repair process performance in support of that project. In
doing so we are also able to gain some insight into related issues such as
application severity, operating practices, contract guarantees /
commitments, and contract financial health.
A great deal of time, energy and resources have been invested identifying
and developing several metrics of performance that quantify and trend
product and project health. Based on that experience we have been
able to document actual site performance in many of those areas and
feel very confident representing some of those results as Benchmarks.
The metrics contained herein will provide insight into the performance of
the individual Maintenance & Repair Processes and their contributions to
the end results. Those metrics are organized as follows:
Calculation Methodology:
Operating Hours
MTBS = (hours)
Number of Shutdowns
Description:
MTBS is a measure that combines the effects of inherent machine
reliability and the effectiveness of the equipment management
organization in its ability to influence results through problem avoidance.
Data Source(s):
Operating hours obtained from machine service meter reading. Note,
hours obtained from dispatch systems frequently do not agree with
machine SMU due to coding of production delays, etc. Note that hours
taken from machine SMU will be higher than those taken from dispatch,
oftentimes by as much as 10 percent.
Note: Production delay hours may not be tracked and accounted for
separately and are therefore included in the total operating hours. Sites
that use dispatch systems may track and code production delay hours
separate from operating hours hence they must be acquired from
dispatch.
Benchmarks for trucks smaller than the 785 and the 797 are less well
known although it is believed that MTBS for trucks in the 769 – 777 size class
will be significantly higher (as much 30 to 40%) while that of the 797 will be
perhaps 10% lower.
Similarly, benchmarks for other large mining equipment are not well
documented. However, indications are that once MTBS data is collected,
analyzed and validated, the results will fall into the following ranges:
Calculation Methodology:
Description:
Mean Time To Repair (MTTR) is a performance measure that quantifies
repair turnaround time, i.e. how quickly (or slowly) a machine is returned
to service once a downtime incident occurs. MTTR combines the effects
of inherent machine maintainability / serviceability and the efficiency of
the equipment management organization in delivering rapid remedial
action in the execution of needed repairs.
Data Source(s):
Downtime hours obtained from machine workorder history and dispatch
system. Dispatch information must be used to account for downtime that
is not accompanied by a workorder. It is essential to note that repair
delay time should be included in the downtime history calculation. If
delay times are known, MTTR should be calculated both with and without
delays.
Shutdown count obtained from machine workorder history and dispatch system. Once
again, dispatch information must be used to account for shutdown events that
are not accompanied by a workorder.
be close to the low end of the range while that of a “mature” fleet (one
that has undergone its first round of major component rebuilds) should be
closer to the high end of the range. This is a result of the relative
complexity of the repairs seen on new versus “mature” machines.
Benchmarks for trucks smaller than the 785 and the 797 are less well
known although it is believed that MTTR for trucks in the 769 – 777 size class
will be slightly lower (10 to 20%) while that of the 797 will be perhaps 10%
higher.
Similarly, benchmarks for other large mining equipment are not well
documented. However, indications are that once MTTR data is collected,
analyzed and validated, the results will fall into much the same range as
large OHT fleets with larger machines, e.g. 24H MG and 5000 series HEX,
being as much as 30 to 40% higher.
Calculation Methodology:
Description:
A high percentage of unscheduled downtime incidents results in very
inefficient use of resources and excessive costs since personnel are
frequently shuffled from job to job and facilities and manpower
requirements need to be sufficiently large to accommodate huge swings
in the number of machines down for repairs. Data collected from mine
studies has shown that the average downtime for unplanned /
unscheduled work is up to eight times greater than the downtime for
planned / scheduled activity.
TRACTORS INDIA PRIVATE LIMITED
Data Source(s):
Downtime hours obtained from machine workorder history and dispatch
system. Dispatch information must be used to account for downtime that
is not accompanied by a workorder. It is essential to note that repair
delay time should be included in the downtime history calculation.
Individual workorders should be coded as “scheduled” or “unscheduled in
order to track the number of downtime hours that are scheduled.
Calculation Methodology:
Description:
Contracts are written largely to ensure that production equipment is
available for operation a sufficient number of hours to enable the mine to
meet its production goals at a reasonable, predetermined operating cost.
The specific provisions of a contractual availability guarantee vary
significantly from site to site, i.e. time that the contractor will be given
credit for (available hours), time that the contractor will be held
accountable for (contractual downtime), as well as specific exclusions,
e.g. tires, dump bodies, welding, etc. are defined in detail in the contract.
Furthermore, contracts frequently specify caps or limits on downtime that
apply to things such as delays waiting on facilities, repair equipment and
or other support infrastructure that the contractor is not expected to
provide and has little control over. Because these exclusions and
limitations vary so widely from one site to the next, it is not possible to link
performance in this area to any kind of Benchmark nor does it make any
sense to attempt to make comparisons from one site to the next. Target
performance should be compliance with the provisions defined within the
contract or, in the absence of a contract, with customer expectations.
Data Source(s):
Total calendar hours is equal to the total time in the period to be
analyzed, e.g. 8760 hours / year, 720 hours / 30 day month, 168 hours /
week, etc.
If the available hours calculation involves the combination of operating
hours, stand-by hours, production delay hours and operational delay
hours (as it does in many instances), that information can be obtained
from the machine service meter reading and information coded within
the dispatch system.
MARC downtime hours are obtained from the machine workorder history
as well as the dispatch system. Dispatch information must be used to
account for downtime that is not accompanied by a workorder. It is
essential that the machine repair history contain detail sufficient to
determine if individual downtime events are excluded from the MARC
downtime calculation.
Calculation Methodology:
MTBS
Availability Index = X 100 (%)
MTBS + MTTR
Description:
Availability is the result of the frequency and duration of downtime events
(shutdowns). Because of the mathematical relationship between MTBS,
MTTR and Availability Index, the result shows which of the other two factors
had the greatest influence upon that result. This allows management to
react appropriately to changes in the Availability Index and by focusing
its effort and resources on the frequency (MTBS) or duration (MTTR) of
downtime events.
Data Source(s):
Since Availability Index is derived from MTBS and MTTR, the data sources
for those two metrics are applicable here as well.
Benchmarks for truck smaller than the 785 and the 797 are less well known
although it is believed that the Availability Index for trucks in the 769 – 777
TRACTORS INDIA PRIVATE LIMITED
size class will be somewhat higher (possibly 2 to 3%) while that of the 797
will be perhaps 1 to 2% lower.
Similarly, benchmarks for other large mining equipment are not well
documented. However, indications are that once the data is collected,
analyzed and validated, the results will fall into much the same range as
large OHT fleets with larger machines, e.g. 24H MG and 5000 series HEX,
being as much as 3 to 4% lower and smaller machines, e.g. 16H, being 1
or 2% higher.
Calculation Methodology:
Description:
Maintenance Ratio is an indication of the amount of effort required to
keep equipment in service as well as the efficiency with which labor is
deployed and the effectiveness of the workforce in carrying out its duties.
Maintenance Ratio can be calculated as either “charged” or “direct”.
“Charged” Maintenance Ratio considers only workorder man-hours
(direct labor). Repair shop, e.g. Component Rebuild Center, labor is not
included in the calculation. “Overall” Maintenance Ratio includes all the
elements of “charged” Maintenance Ratio plus staff, supervision and idle
time.
Data Source(s):
Maintenance and repair man-hours are obtained from the work order
history. The result should include actual time spent working on all forms of
maintenance, repairs and modifications as well as inefficiencies that result
from inspection and diagnostic time or any delay or wait time for bay
space, parts, tooling, literature, repair support equipment, decision
making, etc.
TRACTORS INDIA PRIVATE LIMITED
Operating hours are obtained from machine service meter reading and
once again should include production delay hours. Note, hours obtained
from dispatch systems frequently do not agree with machine SMR due to
coding of production delays, etc.
MR Assessment / Characteristics
Excellent; high % of scheduled downtime; Equipment Mgmt. organization is highly
0.30 to 0.35
proactive.
0.35 to 0.40 Acceptable; majority of downtime is scheduled; substantial emphasis on Equipment Mgmt.
Marginal; approx. half of all downtime is scheduled; Equipment Mgmt. disciplines not fully
0.40 to 0.50
functional.
0.50 to 0.60 Fair; < 40% downtime is scheduled; minimal effort on Equipment Mgmt.
> 0.60 Poor; only PM’s are scheduled; Equipment Mgmt. organization is purely reactive.
Benchmarks for trucks smaller than the 785 and the 797 are less well
known although it is believed that Maintenance Ratio for trucks in the 769
– 777 size class will be slightly lower while that of the 797 will be somewhat
higher.
Similarly, benchmarks for other large mining equipment are not well
documented. However, indications are that once Maintenance Ratio
data is collected, analyzed and validated, the results will fall into the
ranges shown in the table below. It is important to note here that
machine application will play a role in Maintenance Ratio. This is
particularly true in the case of large Track-type Tractors that can be
deployed as either production or support equipment. (Refer to table 4
below).
TRACTORS INDIA PRIVATE LIMITED
Machine / Model MR
D10 / D11 TTT’s 0.40 to 0.50
992 / 994 WL’s 0.35 to 0.45
16 MG 0.10 to 0.15
24 MG 0.15 to 0.20
5000 HEX 0.50 to 0.60
Calculation Methodology:
Operating Hours
MTBS (by system) = (hours)
Number of Shutdowns (by system)
Description:
All mining support operations have limited resources. The most successful
operations are those that have a clear understanding of the problems
and issues facing them and are thus in a position to establish priorities in
order to focus their efforts and allocate the appropriate resources on
remedial or containment strategies through continuous improvement. The
identification and quantification of top problems by component (e.g.
engine, transmission, …), system (e.g. hydraulics, electrical, …) or even
process (e.g. PM) facilitates the understanding of the extent that each
area is having an influence on various criteria that comprise the success
of a mining support operation, i.e. shutdown frequency (MTBS), shutdown
duration (MTTR), impact on Availability and Costs. With this knowledge
the Project Manager is able to “drill down” to the key issues facing his site
and apply the necessary resources in the most efficient manner to
improve his situation.
Data Source(s):
Operating hours are obtained from machine service meter reading.
Note, hours obtained from dispatch systems frequently do not agree with
machine SMR due to coding of production delays, etc.
Shutdown count is obtained from machine workorder history and dispatch
system. Dispatch information must be used to account for shutdown
events that are not accounted for by a workorder. Shutdown count must
be determined individually for each area of the machine as well as for the
machine as a whole in order to assess not only the contribution of each
area but also to calculate Availability Index.
Downtime hours obtained from machine workorder history and dispatch
system. Dispatch information must be used to account for downtime that
is not accompanied by a workorder. It is essential to note that repair
delay times should be included in the downtime history calculation. If
delay times are known, MTTR should be calculated both with and without
delays. As is the case with shutdown count, downtime must be
determined individually for each area of the machine as well as the
machine as a whole in order to assess the contribution of each area.
Total cost to support and maintain each of the systems and components
on the machine. At a minimum it is vital to know the breakdown for costs
of repairs and rebuilds of each major component on the machine. Most
recordskeeping systems we have studied do a fairly poor job of
TRACTORS INDIA PRIVATE LIMITED
Since there are many factors other than equipment management that
influence costs (labor rates, transportation costs, import duties, taxes,
etc.), it is impossible to define Benchmarks that are universally applicable
to any given machine model. This being the case, we recommend that
budgetary cost and component life projections be used to define target
cost per hour figures and that actual cost performance be compared to
those targets in order to determine if any particular area is out of line with
expectations.
Calculation Methodology:
Operating Hours
Asset Utilization = X 100 (%)
Total Calendar Hours
Description:
How effectively the Operations Department schedules equipment and
efficiently it utilizes that equipment has significant implications for
Maintenance. If machines are scheduled for use 24 hours a day, 7 days a
week, Maintenance must respond by working with Operations to find
windows of opportunity in which maintenance and repairs can be
performed without increasing downtime. These opportunities typically
occur during scheduled shutdowns but they may also come at shift
change, lunch breaks or during operational delays such as during blasting
or fueling of equipment. In all circumstances, Operations and
Maintenance need to recognize that they are working together toward
common goals … high availability, good machine reliability and the
lowest possible cost per unit of production.
Data Source(s):
Operating hours are obtained from machine service meter reading and
should include production delay hours. Note, hours obtained from
dispatch systems frequently do not agree with machine SMU due to
coding of production delays, etc. Note that hours taken from machine
SMU will be higher than those taken from dispatch, oftentimes by as much
as 10 percent.
Calculation Methodology:
Factory program completion status is calculated as the ratio of programs
completed on a machine-by-machine basis relative to the number of
programs that are active and applicable at the time under consideration.
This ratio should be expressed as a percentage. Programs that are
defined as "after failure" should not be included in the calculation.
Data Source(s):
Factory programs are received on site via the dealer Technical
Communications staff and include all of the information necessary to
determine applicability and monitor their completion status, i.e. program
identification number, dates of issue and termination, and program type.
Machine serial number and hourmeter information obtained from the
machine history at the site.
The average operating hours to the first stop after each PM service is a
valid indication of PM quality and effectiveness. The Benchmark (best in
class) for large Off Highway Trucks is 105 hours; a realistic target is 2 to 3
times the overall MTBS. Tracking and trending this metric monthly offers a
reasonable representation of PM quality and effectiveness.
2.1.2 - Unavailability PM
PM Downtime Hours
Unavailability PM = (1 - Availability) X X 100 (%)
Total Downtime Hours
2.1.3 - MTTR PM
Trucks that are on a 250 hour PM service interval. The target for
equipment that is on a 500 hour PM service interval is higher, i.e. double
that of the 250 hour interval. Once again, if average PM downtime is the
range, it may indicate and MTBS after PM is low, it is a safe assumption that
insufficient time and effort is being placed on PM. Conversely, if average
PM downtime is above the range and MTBS after PM is high, one can assume
that the site is placing substantial emphasis on the value of PM.
Additionally, one should consider the impact of efficiency factors such as
facilities, tooling, training, planning & scheduling, etc. when assessing
MTTR PM.
Backlogs Generated by Origin identifies which areas that are or are not
contributing to efforts by Condition Monitoring in failure detection. There is
no Benchmark for Backlogs Generated by Origin, however, if the quantity
of Backlogs generated by operators, inspectors, the PM crew, the shop
crew, etc is low, additional emphasis should be placed on the offending
party(s) to encourage their participation in the defect detection process.
Conversely, if the percentage of “shop-found” defects is
disproportionately high, the other areas must be encouraged to increase
their involvement since “shop found” defects are typically far less
efficiently executed due to the inability to plan the workload. There are no
Benchmarks or targets related to this metric.
The material contained herein is confidential and is not to be copied or distributed without written permission by owner
TRACTORS INDIA PRIVATE LIMITED
The material contained herein is confidential and is not to be copied or distributed without written permission by owner
TRACTORS INDIA PRIVATE LIMITED
The material contained herein is confidential and is not to be copied or distributed without written permission by owner
TRACTORS INDIA PRIVATE LIMITED
The average downtime hours (including delays & response time) required
to execute field repairs. There is no Benchmark associated with this
measure but a reasonable target is <1 hour. It should be noted here that
the field service crew is the “first line of defense” for the maintenance
organization and, as such, their attention should be focused on rapid
remedial actions and fast, decisive decision-making. Consequently, if the
field service crew determines that a repair can be better performed in the
shop environment, they should release it to the shop unless those
resources are unavailable. Thus, the target for MTTRfield is relatively low, <1
hour, and unless the machine is not mobile, higher quality and more
efficient repairs can be performed in the shop.
The material contained herein is confidential and is not to be copied or distributed without written permission by owner
TRACTORS INDIA PRIVATE LIMITED
The average operating hours to the first stop after each repair is an
indication of repair quality and effectiveness. There is no Benchmark
available for this metric. A realistic target depends upon the level of
current performance, i.e. if repair quality is an issue (technicians are
creating more problems than they are correcting), the target should be
much higher than if repair quality is relatively good.
2.6.6 - % Redo
Σ Repair Redo Man-Hours
Redo = X 100 (%)
Σ Repair Man-Hours
Delay Downtime
Unavailability D = (1 – Availability) X X 100 (%)
Total Downtime
The material contained herein is confidential and is not to be copied or distributed without written permission by owner
TRACTORS INDIA PRIVATE LIMITED
The material contained herein is confidential and is not to be copied or distributed without written permission by owner
TRACTORS INDIA PRIVATE LIMITED
The Availability Index during the first six months after major component
exchange is a very good indication of the quality of work being
performed during component exchange. This can be calculated by
monitoring Availability Index for the individual machine for the period.
There is no Benchmark for this metric but a valid target is that the
Availability Index during the first six months after major component
exchange is > 88%.
The material contained herein is confidential and is not to be copied or distributed without written permission by owner
TRACTORS INDIA PRIVATE LIMITED
The material contained herein is confidential and is not to be copied or distributed without written permission by owner
TRACTORS INDIA PRIVATE LIMITED
The number of hands-on labor hours available per month is a metric that
helps understand / measure the manpower available on site. This metric is
use as a reference for other metrics.
This ratio gives us a quick relationship between the work force on-site and
the number of machines. This metric can be used as a quick reference
and must be combined with other metrics to better understand the
personnel situation on-site.
Total Personnel
Total Personnel – = [-]
Machines Ratio Number of Machines
The material contained herein is confidential and is not to be copied or distributed without written permission by owner
TRACTORS INDIA PRIVATE LIMITED
This metric establishes the relationship between the total personnel on-site
and the number of machines. Total personnel includes all people on site,
technicians, planners, supervisors, secretaries, administration personnel,
etc.
This metric asks for the total maintenance personnel on-site. How many
people we have on-site to support the fleet of equipment. This metric in
conjunction with metrics in 2.8.3, 2.8.4 & 2.8.5 gives us a dimension of the
maintenance crew on-site and can be compared with other similar
operations to support the understanding of personnel efficiency.
All the above metrics are very straightforward and can be easily
obtained. The documentation of these figures link with the characteristics
of the fleet and the on-site operation will give us a quick reference for
future studies.
The overtime ratio measures the amount of extra hours required to satisfy
the maintenance operation as a percentage of the total effective hours
available in the period. Overtime may be an indication of labor needs or
extra maintenance demand in a particular period of time. Constant
overtime levels should be an indicator to consider to review and possibly
to improve the on-site organization structure.
The material contained herein is confidential and is not to be copied or distributed without written permission by owner
TRACTORS INDIA PRIVATE LIMITED
The material contained herein is confidential and is not to be copied or distributed without written permission by owner
TRACTORS INDIA PRIVATE LIMITED
The training compliance metric gives us an indication of how well the on-
site operation is following the training activities scheduled. It is also an
indication of the importance that is given to the training activities. Are we
complying with what we scheduled?
The material contained herein is confidential and is not to be copied or distributed without written permission by owner
TRACTORS INDIA PRIVATE LIMITED
CI working on
= % of Continuous Improvement Projects on
Target (CIOT)
Problem Ranking
Top 1-2 %
Top 3-5 %
Top 6-10 %
Active CI
Projects
= Number of CI projects in process [ - ]
The material contained herein is confidential and is not to be copied or distributed without written permission by owner
TRACTORS INDIA PRIVATE LIMITED
This metric, the number of CI projects that are in process or active, gives
us an understanding of the magnitude of the CI effort and how active the
organization is in the search for solutions or optimizations.
CI Projects
Closed
= Number of CI projects closed in the Period [ - ]
CI Project
Execution = Average days to complete CI projects [days]
Time
This metric in conjunction with 2.9.3 above gives us a measure of the CI
process efficiency. Average days to close the CI Projects coupled with
the regularity of delivery measured by CI Projects Closed in the period
provides us a means of telling if the CI pipeline has the ability to deliver
results in a reasonably constant timeframe.
The material contained herein is confidential and is not to be copied or distributed without written permission by owner
TRACTORS INDIA PRIVATE LIMITED
The material contained herein is confidential and is not to be copied or distributed without written permission by owner
TRACTORS INDIA PRIVATE LIMITED
Glossary of Terms
Performance Metric: A term used to describe the outcome of any
process used to collect, analyze, interpret and present quantitative data.
A measurement parameter that enables performance against some pre-
defined Target or Benchmark to be monitored. A measurement used to
gauge performance of a function, operation or business relative to past
results or others.
The material contained herein is confidential and is not to be copied or distributed without written permission by owner
TRACTORS INDIA PRIVATE LIMITED
Unscheduled Hours: Hours outside the plan; lost time that result from
accidents, strikes, weather, acts of God, any holidays that are observed,
etc. (typically defined by the customer or contained in the Customer
Support Agreement or MARC).
The material contained herein is confidential and is not to be copied or distributed without written permission by owner
TRACTORS INDIA PRIVATE LIMITED
lost hours that result from operational delays should be reconciled and
never counted against machine availability. On the other hand, policy at
many mines ignores operational delay hours altogether and therefore,
does not credit operational delay hours as either scheduled or available
hours.
Repair Delay Hours: Time that machine is waiting for repairs due to
unavailability of labor, parts, facilities, equipment or tooling. Typically not
well documented in most machine downtime histories but is nonetheless
included, yet unrecognized, as part of the machine downtime record.
The material contained herein is confidential and is not to be copied or distributed without written permission by owner
TRACTORS INDIA PRIVATE LIMITED
The most successful mining support operations are those that have a clear
understanding of the problems and issues they are facing. The
identification and quantification of problems by component (e.g. engine,
transmission, …), system (e.g. hydraulics, electrical, …) or even process
(e.g. PM) facilitates an understanding of the influence each is having on
the final outcome enabling management to focus its attention and
resources on the most critical issues, i.e. those that will derive the
maximum benefit.
The table on the following page provides a baseline that can be used as
a reference until individual site experience and history can be
documented. Using it to generate and perform a top problems
distribution analysis enables Project Management to identify and prioritize
critical issues affecting success of the project for investigation and
resolution.
It is important to note that due to the fact that most machine workorder
history databases to not do a very good job of documenting delays, the
duration of machine downtime events (MTTR) includes any delay
downtime associated with the particular event. As such, delays are not
listed separately in the table. A better way of doing business would be to
break out actual repair downtime from any delays associated with the
The material contained herein is confidential and is not to be copied or distributed without written permission by owner
TRACTORS INDIA PRIVATE LIMITED
The material contained herein is confidential and is not to be copied or distributed without written permission by owner