Inspiration

Most bad releases don't come out of nowhere. Before someone ships the ticket that ruins the weekend, the warning signs are usually already in the Atlassian site: a Sev-1 in the same service last week, a postmortem in Confluence, an open pull request, a failed production deploy, an assignee who is away on Monday. Nobody reads all of that at 4:52 on a Friday. We wanted that context to show up on the ticket, right when someone clicks Done.

What it does

Shipcast gives every Jira ticket a change-risk forecast: ☀️ Low, 🌤️ Caution or ⛈️ High, with a score and the reasons behind it.

  • Issue panel. Each reason is a fixed number of points with a link to its evidence: linked JSM incidents (Sev-1 and Sev-2 weigh more), a recent hotfix in the same area, an assignee who is away, open blockers, and, from Teamwork Graph, open pull requests and failed production deploys. Points are fixed, so a 25 means the same on every team. The forecast is computed as the viewing user, so people only see evidence they're allowed to open.
  • Ship check. A workflow validator on the transition to Done. Each project picks how strict to be: Warn leaves a comment, Reason asks for a ship note, Reviewer needs someone other than the assignee to approve, and Block needs a project admin override with a reason. An approval stops counting if the risk rises later. If Shipcast itself fails, the ship goes through: a broken check never freezes a release.
  • Release forecast. A project page rolls every ticket in a version up into one release level (highest ticket, average or sum), with the top reasons across the release.
  • Rovo agent. "Ask Rovo why" opens the Shipcast agent, which answers only from the forecast: level, score and each reason with its link.
  • MCP tools. get_shipcast and get_release_shipcast work in any MCP client. In the video, Claude Code asks "What's risky in PAY v2.4?" and gets the same answer with the same permissions.
  • Real data. Link a Bitbucket workspace and real pull requests show up in the forecast within about a minute, with no setup in Shipcast.

How we built it

Shipcast is a Forge app written in TypeScript, using UI Kit for the panel, the settings page and the release page.

  • jira:issuePanel, jira:projectSettingsPage and jira:projectPage call one resolver that computes the forecast with asUser(), so permissions come from Jira.
  • jira:workflowValidator runs the ship check. A validator has no user to act as, so it reads a cache that only ever adds risk: an item one viewer couldn't see is never treated as fixed.
  • A trigger on avi:jira:updated:issue records the ship and its risk level in the audit history when a ticket reaches a ship status, and in warn mode posts the ship comment.
  • graph:connector plus the Teamwork Graph API: the server reads pull requests and deployments linked to the ticket, from any source (Bitbucket included). The demo pushes its own PRs and deploys through the connector.
  • rovo:agent with two action modules, and rovo:mcp exposing the same two actions as MCP tools.
  • Forge storage keeps audit history, approvals and the graph cache. Project settings live in a Jira project property, because Forge runs MCP calls in the Confluence install, whose storage is separate.
  • A one-click demo loader builds the whole story: a PAY project, three linked ITO incidents, a Confluence postmortem, PRs and a failed deploy.
  • 148 unit tests (Node test runner) cover the scoring, the gate modes, approvals and the release roll-up.

Challenges we ran into

  • Workflow validators run without a user, while the panel runs as the user. Making both agree without leaking evidence led to the add-only cache.
  • MCP tool calls run in the Confluence install, which has its own storage, so settings saved from Jira were invisible to them. Moving settings to a Jira project property fixed it.
  • An Atlassian auth incident broke every asApp call for a few hours mid-build, and a reinstall wiped the connector state. The demo loader can now resume and re-send its graph data.
  • Keeping scores explainable: no model guesses the risk. Every point is a fixed weight with a link.

Accomplishments that we're proud of

  • One forecast, the same everywhere: issue panel, ship check, release page, Rovo and an MCP client all give the same answer under the same permissions.
  • The gate never makes a release worse: it fails open, and it asks for a reason instead of just saying no.
  • Real Bitbucket pull requests flow in through Teamwork Graph with zero code in Shipcast.

What we learned

Teamwork Graph turns "what's linked to this ticket" into a single question across tools, and Rovo plus Forge MCP mean an app built once can answer in Jira, in chat and in a developer's terminal.

What's next for Shipcast

  • More signals: on-call load, change freezes, flaky test history.
  • Calibration: compare forecasts with the incidents that actually followed, and suggest better weights per team.
  • A Marketplace listing.

About the video

All product footage is real screen recording of Shipcast running on a Jira Cloud site.

Built With

Share this project:

Updates

Submission history