0.
80
0.275 0.25 0.275
/
5 - 12mm. O
BOTHWAYS
4.00
0.3125
135o HOOK 6db 75mm. MIN.
1.20 ( ROTATED TYPICAL )
PROPERTY LINE
0.175
0.80
SETBACK
4.00 4.00
2.00
10mm. LATERAL TIES
1 @ 50mm., 4 @ 100mm.,
REST @ 200mm. O.C.
0.3125
WF1
WF1
150mm. x 200mm.
0.70
100mm. x 50mm. x 2.0mm. PVC GUTTER
C-JOIST SPACED @ 300mm.
WF2 O.C. WITH 100mm. x 50mm.
x 2.0mm. BRIDGING
@ MIDSPAN
0.70
0.70
C1F1 C1F1
PLAN
WF2
B-1 B-1
2.00
50mm. x 50mm. x 3.0mm. THK.
ANGLE BAR RAFTERS, ANCHORED
FIREWALL
FIREWALL
2.75
TO FIREWALL BY 2-12mm. O
WF1
WF1
ANCHOR BOLTS
EL.+- 150mm.
WF2 100mm. THK. CONC.
/
SLAB WITH 10mm. O
2.75
2.75
IB - 1
IB - 1
B-2
B-2
TEMP. BARS AT
400mm. BOTHWAYS
EL.+- 200mm.
5.50
0.50 THK. PRE-PAINTED
RIB-TYPE G.I. SHEET ROOFING
10.00
C1F1 C1F1 10mm. LATERAL TIES
1 @ 50mm., 4 @ 100mm.,
5.50
5.50
REST @ 200mm. O.C. 75mm. x 75mm. x 6.0mm. THK.
ANGLE BAR SEAT, ANCHORED
B-1
FIREWALL
FIREWALL
TO INCLINED BEAM WITH
WF1
WF1
2-12mm. O ANCHOR BOLTS
2.75
WF2 4 - 16mm. VERTICAL BAR
ADDITIONAL 150mm. x 65mm.
x 20mm. x 2.0mm. LIP CHANNEL
IB - 1
IB - 1
B-2
B-2
_ 200mm.
E.L. + PURLINS @ TOP & BOTTOM OF
2.75
2.75
C1F1 C1F1
WF2
ROOF SLOPE WITH 12mm. O
SAGROD @ MIDSPAN
40mm. CONCRETE COVER
WF2 WF2
0.70
WF1
WF1
150mm. x 65mm. x 20mm. x 2.0mm.
LIP CHANNEL PURLINS SPACED
@ 700mm. O.C. WITH 12mm. O
B-1 B-1 SAGROD @ MIDSPAN
SETBACK
0.70
0.70
2.50
PROPERTY LINE
/
5 - 12mm. O
BOTHWAYS
3 LOFT FLOOR FRAMING PLAN 4 ROOF FRAMING PLAN
S-2 SCALE : 1 : 50 MTS. S-2 SCALE : 1 : 50 MTS.
100mm. THICK
1 FOUNDATION PLAN GRAVEL BEDDING
S-2 SCALE : 1 : 50 MTS.
SECTION
COLUMN AND FOOTING
2 DETAIL ( C1F1 )
S-2 SCALE : 1 : 10 MTS.
PROJECT TITLE : Republic of the Philippines ARCHITECT / ENGINEER DESIGNED: PLIBARDALOZA CHECKED: RGRAMOS SHEET NO.
MUNICIPALITY OF TIGAON Office of the President
Tigaon, Camarines Sur DRAWN: PLIBARDALOZA DATE:
NATIONAL HOUSING AUTHORITY
CHECKED BY RECOMMENDING APPROVAL SHEET CONTENT District II, VGH, Concepcion Grande, Naga City
HOUSE MODEL ( 33sqm. R.H. ) FOUNDATION PLAN / COL. & FOOTING REVIEWED BY RECOMMENDING APPROVAL APPROVED BY S-2
DETAIL / LOFT FRAMING PLAN /
TIGAON RES. PROJECT Phase I APPROVED BY
DESIGNATION
REVISIONS
ROOF FRAMING PLAN
DATE:
LOCATION : Engr. CRISTINA A. CABANGON Engr. ALBERT A. PERFECTO MARCELINO P. ESCALADA JR. 7 13
REG No.: DATE: PROJECT MANAGER, DISTRICT II - REGION V ACTING REGIONAL MANAGER, REGION V GENERAL MANAGER, NHA
BRGY. SALVACION, TIGAON, CAMARINES SUR Hon.
MUNICIPAL MAYOR PTR No.: PLACE: