Project Engineering Deliverables
Functional Responsibility Description Type of Cost
Deliverable (L.E.)
Project Controls
*Project Controls Plan *Document 500
*Project Cost Reports *Report 500
*Work Breakdown Structure *Chart 1500
*Schedule 2000
*Project Schedule
Engineering ‐ General *List of Codes, Standards, & * List 1000
Regulations
*Design Philosophies *Document 2000
Mechanical Engineering *Mechanical Equipment Design
*Document 1000
Criteria
*Mechanical Equipment *Document 3000
Specifications
*Mechanical Equipment List * List 2000
Piping *Piping Design Criteria *Document 1000
*Piping Calculations *Document 3000
*Tie‐In List * List 1000
*General Arrangement
* Drawings 5000
Drawings
*Pipe Support Standard
* Drawings 2000
Drawings
*Piping Isometric Drawings * Drawings
5000
Total Cost = 30500 L.E
Information needed
Project Execution Plan
Fire Hazard Zone Drawing
Hazard and Operability Analysis (HAZOP)
Process Flow Diagrams (PFD's)
Piping and Instrumentation Diagrams (P&ID's)
Plant Layout, Site and Plot Plans
Line Designation Tables