BUDGET OF WORK
CONTENT PERFORMANCE
WEEK # CONTENT LEARNING COMPETENCIES CODE
STANDARD STANDARD
FIRST QUARTER:
WEEK 1 Types and parts of The learners The learners shall be 1.1 Plan unit assembly to ensure OHS TLE_IACSS9-12ICCS-Ia-e-
computers demonstrate an able to install and policies and procedures are 28
Computer operating understanding of configure computer followed in accordance with
systems concepts and systems based on systems requirements
Windows / MAC OS X principles in installing established 1.2 Prepare unit assembly to ensure
/Linux configuring computer procedures and OHS policies and procedures are
Peripheral devices systems. system requirements. followed in accordance with
Computer systems systems requirements
design 1.3 Identify materials necessary to
WEEK 2 & 3 Computer assembly complete the work in accordance
procedures with established procedures and
Power ON self-test check against system requirements
and basic-input- 1.4 Obtain materials necessary to
output-system complete the work in accordance
(BIOS) configuration with established procedures and
procedures check against system requirements
WEEK 4 CMOS 1.5 Obtain tools, equipment and
Motherboards testing devices needed to carry out
WEEK 5 Multimedia storage installation work in accordance
devices: with established procedures and
o Video cards check for correct operation and
o Sound cards safety
Graphical user 1.6 Assemble computer hardware in
interface accordance with established
procedures and system
requirements
1.7 Perform BIOS configuration in
accordance with hardware
requirements
WEEK 6 Installers The learners The learners shall be 2.1 Create portable bootable devices TLE_IACSS9-12ICCS-If-j-
preparation and OS demonstrate an able to install and in accordance with software 29
installation understanding of configure computer manufacturer instruction
procedures concepts and systems based on 2.2 Prepare customized installers in
WEEK 7 Application and principles in installing established accordance with software
devices/drivers configuring computer procedures and utilization guide and end user
installation systems. system requirements. agreement
Downloaded by Jacly Alima ([email protected])
lOMoARcPSD|29254698
procedures 2.3 Carry out installation of portable
WEEK 8 Desktop PC applications in accordance with
interface/ hook up software user guide and software
procedures license
WEEK 9 Application
packages and use of
application
programs
WEEK 10 Bootable devices
o CD/DVD bootable
o USB bootable
using Rufus
software
o USB bootable
using
diskpart/CMD
Software installers
SECOND QUARTER:
WEEK 1 – 5 Installation of The learners The learners shall be 3.1 Install Operating System (OS) in TLE_IACSS9-12ICCS-IIa-j-
Operating System demonstrate an able to install and accordance with established 30
o Windows Server understanding of configure computer installation procedures and to
2008/higher concepts and systems based on comply with end-user requirements
version principles in installing established 3.2 Install peripherals/ devices in
o Windows configuring computer procedures and accordance with manufacturer’s
XP/7/8/10 systems. system requirements. instructions and/ or OS installation
procedures
WEEK 6 – 7 Install and configure 3.3 Configure peripherals/ devices in
of peripherals accordance with manufacturer’s
devices instructions and/ or OS installation
procedures
WEEK 8 – 9 Install /Update 3.4 Access OS and drivers updates/
Operating system patches in accordance with
manufacturer’s recommendations
WEEK 10 Checking of work and requirements
3.5 Install OS and drivers updates/
patches in accordance with
manufacturer’s recommendations
and requirements
3.6 Check the quality of the work
undertaken in accordance with
established procedures
THIRD QUARTER:
WEEK 1 Installation of The learners The learners shall be 4.1 Install Application Software based TLE_IACSS9-12ICCS-IIIa-
Downloaded by Jacly Alima ([email protected])
lOMoARcPSD|29254698
applications software demonstrate an able to install and on software installation guides, e-31
with different understanding of configure computer end-user requirements and
variations concepts and systems based on software license agreement
principles in installing established 4.2 Carry out variation to application
WEEK 2 Software updates configuring computer procedures and software in accordance to
systems. system requirements. customer/ client requirements
WEEK 3 Virtualization 4.3 Access software updates in
software accordance with manufacturer’s
Disk management recommendations and
software requirements
4.4 Install software updates in
WEEK 4 Antivirus / diagnostic accordance with manufacturer’s
software recommendations and
requirements
WEEK 5 Device drivers
Drivers/Software
update procedures
o Application
software license
agreements
o Stress-testing
procedures
- 5S and 3Rs
environmental
policies
WEEK 6 & 7 Burning or testing 5.1 Test devices/ systems and/or TLE_IACSS9-12ICCS-
installed installation to determine whether it IIIf-j-32
equipment/devices conforms to requirements
5.2 Conduct stress test to ensure
WEEK 8 Stress test reliability of equipment in
o Processor accordance with manufacturer’s
o Memory instructions and system
o Hard Disk requirements
o Video Card 5.3 Follow 5S and 3Rs according to
environmental policies
WEEK 9 5S and 3Rs 5.4 Follow procedures in forwarding
environmental documentation to appropriate
policies personnel and/or authority on the
test conducted.
WEEK 10 Reporting and
documentation
procedures
THIRD QUARTER:
Downloaded by Jacly Alima ([email protected])
lOMoARcPSD|29254698
WEEK 1 Computer network The learners The learners shall be 1.1 Plan cable routes in accordance TLE_IACSS9-
concepts demonstrate an able to set up with network design and actual 12SUCN-IVa-j-33
understanding of computer networks installation site
concepts and based established 1.2 Determine cable routes in
WEEK 2 – 5 Network cable principles in setting up procedures and accordance with network design
installation computer networks. system requirements and actual installation site
Copper cable for hardware. 1.3 Identify necessary network
splicing and cable materials in accordance with
testing established procedures and check
Fiber optic cables against system requirements
splicing and 1.4 Obtain necessary network
installation materials in accordance with
requirements established procedures and check
against system requirements
WEEK 6 Philippine Electrical 1.5 Obtain tools, equipment, and
Code relevant to testing devices in accordance with
data connection established procedures
1.6 Check tools, equipment and
WEEK 7 OHS standards and testing devices in accordance with
5S principles established procedures
1.7 Follow OHS policies
WEEK 8 Practicing 3Rs 1.8 Use appropriate PPE
(reduce, reuse, 1.9 Perform copper cable splicing
recycle/recover) based on Electronic Industries
Alliance / Telecommunications
WEEK 9 3Rs environmental Industry Association (EIA/TIA)
policies standards
WEEK 10 Managing waste 1.10 Install network cables and cable
from electrical and raceways in accordance with
electronic established procedures and
equipment (WEEE) installation requirements
1.11 Perform installation work and
check for unnecessary damage
that has occurred and complies
with requirements
1.12 Follow OHS standards and 5S
principles according to enterprise
requirements
1.13 Dispose excess components and
materials based on WEEE
directives and 3Rs waste
management program
LESSON 8: INSTALLING AND CONFIGURING COMPUTER SYSTEMS (ICCS) LESSON 9: SETTING- UP
COMPUTER NETWORKS (SUCN)
Downloaded by Jacly Alima ([email protected])
lOMoARcPSD|29254698
Learning Outcome 1 – Assemble Computer Hardware Learning Outcome 1 – Install
Network Cables
Learning Outcome 2 – Prepare Installer
Learning Outcome 3 – Installing Operating System and Drivers for Peripherals / Devices
Learning Outcome 4 – Installing Application Software
Learning Outcome 5 – Conduct Testing and Documentation