Hardware and networking services level- IV
Practical Assessment
Project:-propose Network and Internet Insfrastructural solution
Competency Covered:-
1. .plan and organize work
2. Assist with policy development for client support
3. Biulding Internet Infrastructural
4. Migrate to New Technology
5. Determine maintenance strategy
6. Establish Quality standard
In this project you are required to propose,Design and Implement new IT Insfrastructural for
company called Bingo Computer Institutes Engineering consult
The company is Engaged in consulting Design and Contraction of Biulding Bridge and Roads. It has
Three Biulding in Compound that has Maximum Distance of 50MB between them each building has
Three Floors & 16User in each floors the company went to implement Centralized Network Based
Insfrastructural that Include:-
1. Centralize message management
2. Centralized file management
3. Centralized Data Base Server
4. 4MB Internet connection for the whole employees
Task1:-plan and Organize project
Instruction under this task the candidate should prepare work plan which include Phase of the
project ,Activity to be Performed, Duration for Each Activity, Required Man Power and
Responsibility Body
Task2:-Identify Network and Internet Insfrastructural
Competency covered
1. Building Internet Insfrastructural
2. Migrate to new Technology
3. Establish quality standard
Instruction under this task the candidate should identify
Hardware needed to built the infrastructure
Software needed to built the infrastructure
The appropriate type of cable to be used
Type of internet connectivity needed to build the infrastructure
Estimate price of list of hard ware ,soft ware & infrastructure connectivity
Task3:-prepare logical design of an IT Infrastructure
Instruction under this task the candidate should prepare logical design of the
infrastructural solution he/she proposed using micro soft vision2003/2007
Competency covered:-
1. Building Internet Infrastructural
2. Migrate to new Technology
3. Establish quality standard
Task4:-prepare the schedule of the above phase of the project
Task5:- prepare the group policy for your project
Task6:-prepare the Maintenance strategy schedule for your project
Answers sheets
TASK1:-prepare and organize project
Proposed the phase of the project
No Phase of the project Activity to be Duration for each Require Responsibility body
performed Activity d man
power
1 Knowing the project (plan) planning objective 1 days 1 Manager & technical
scope data gathering
n/w topology(looking
building area/place
2 Prepare& propose For org. dep’t gather 3days 1 HNs technical
n/w info.
3 Design Design the n/w 2days 1 Designer
topology (layout )
4 Implementation Working ,crimping , 2days 1 HNS Tech
patching Material
5 Testing & labeling Testing the n/w 2day 1 HNS Tech
6 Configuration & installation Configuration the 3days 1 HNS tech
server user comp. n/w
7 documentation Prepare manual for the 4day HNS tech
project
8 Maintenance strategy Maintenance project Every day& during HNS Tech& user
Prev./corrective the problem
Propose labor of man power during the project the service you give cost profession
No Position Requirement man Responsibility body price
power
1 manager 1 To manage all work 5000
activity
2 Hns technical 1 To Configuration 4000
3 designer 1 To design n/w 3500
topology
4 casher 1 To calculate all 4000
budget
5 coordinator 1 To coordinate daily 2000
work
6 Guarder 1 To security guard 1000
TASK2:-specify hardware Materials Requirement
No Items Description or Unit prices Quantity
specification
1 Server pc Dell computer 1800 3
2 Client pc Dell computer 24000 144
3 printer Laser jet 2055 7000 1
4 DSL Board band 9000 1
5 Fire wall standard 8000 1
6 router ATM/Cisco router 10000 1
7 UTP cable Cat 5/6 5000 2 roll
8 crimper standard 300 1
9 tester standard 100 1
10
LIST OF SOFT WARE NEEDED MATERIAL FROM
N ITEM Description or Unit price Quantity
O specification
1 Win server 2003/2008 100 1
2 Win Xp Servives pack 2 400 2
3 visio 2003/2007 150 1
4 Ms-office 2007/2010 200 1
5 Antivirus Avast 2015 100 1
software
6 Email exchanger Mail server 200 1
7 firewall 400 1
8 1
Estimate cost for Internet Access
N Service/ Description Unit price Quantity Total price
o tem or
specificatio
n
1 Broad band 4mb 10000 4mb 40.000
TASK3:- PREPARE THE SCHEDULE OF THE ABOVE PHASE OF THE PROJECT
N ACTIVITY WEEK 1 WEEK 3
O 1 2 3 4 5 6 1 2 3 4 5 6 7 1 2 3 4 5 6 7
1 Knowing the
project
(plan)
2 Prepare&
propose
3 design
4 Implementat
ion
5 Testing &
labeling
6 Configuratio
n &
installation
7 documentati
on
8 Maintenance
strategy
TASK4:-PREPARE THE GROUP POLICY FOR YOUR PROJECTS
1. Autonticate the user account 2. It s have individual permission 3. It have owner
password for each account 4. Remote login
TASK5:-SUPPORT CLIENT MECHANISM AND MAINTENANCE STRATEGY SCHEDULE FOR YOUR PROJECT
NO ITEM ACTIVITY RESPONCIBILITY BODY
Preventive a. Install antivirus s/w HNS Techn
Maintenance
b. Update s/w user
1 c. Cleaning computer User
d. Disk clean up User
e. Cleaning h/w or s/w user
part
G
H
Corrective Maintenance a. Correct h/w damage
2
b. Correct cable
functionality
c. Install & update s/w
d. Generally maintain
after problem is
occured